Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
TRCA regulated area (100% of lot)
Needs a closer lookPart of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.
What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.
How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details
Ontario Regulation 41/24, TRCA Regulation LimitNatural Heritage System (20% of lot)
Good to knowPart of the lot is in the Natural Heritage System shown on Official Plan Map 9.
What it means. New buildings or additions in that part need a natural heritage impact study.
How to confirm. City Planning confirms the policies that apply. Details
City of Toronto Official Plan, Map 9Work or applications in progress
Good to knowRecent records on this lot: 23 170161 STE 10 SB (Quayside development - Proposed Draft Plan of Subdivision to establish eight blocks, in..., 2023); 23 167792 STE 10 OZ (Proposed Official Plan and Zoning By-law Amendments for Quayside Master Plan Blocks 3b,..., 2023).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications2 Committee of Adjustment files on this lot
Good to know2 approved. B0011/25TEY (To obtain consent to sever a portion of land for the purpose of a lot addition, 2025); B0010/25TEY (To obtain consent to sever the property into two lots, 2025).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)10 development applications open within 300 m
Good to know10 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 50 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
10 records on file: more than at 99% of Toronto houses (median 0).
- Consent (lot split)B0011/25TEYApproved
To obtain consent to sever a portion of land for the purpose of a lot addition.
Jul 9, 2025 · 333 LAKE SHORE BLVD E - Consent (lot split)B0010/25TEYApproved
To obtain consent to sever the property into two lots.
Jul 9, 2025 · 333 LAKE SHORE BLVD E - Zoning review24 236091 ZAPApplication On HoldNov 7, 2024 · 333 LAKE SHORE BLVD E
- Zoning review23 167792 POZClosedApr 3, 2024 · 333 LAKE SHORE BLVD E
- Zoning review23 170161 PSBClosedJul 10, 2023 · 333 LAKE SHORE BLVD E
- Development application23 170161 STE 10 SBUnder Review
Quayside development - Proposed Draft Plan of Subdivision to establish eight blocks, including the Queens Quay East extension, a realigned Parliament Street, three development blocks (Blocks 3, 4 and 5 of the Quayside development), two public roads, a public park (Silo Park), and the Water's Edge Promenade.
Jul 5, 2023 · 333 LAKE SHORE BLVD E · City file - Development application23 167792 STE 10 OZUnder Review
Proposed Official Plan and Zoning By-law Amendments for Quayside Master Plan Blocks 3b, 4 and 5. The proposal for Blocks 3b, 4 and 5 includes two residential towers and one mid-rise building, collectively accommodating 8,988 square metres of non-residential Gross Floor Area (GFA) and 119,581 square metres of residential GFA. The residential component includes 1,475 condo units and 407 affordable units. The buildings will flank a portion of a 14,350 square metre east-west "Community Forest" which is continuous through the centre of the broader development. The mid-rise building on Block 3B will also support portion of a rooftop urban farm, which extends the length of the mid-rise buildings on Blocks 1, 2 and 3b connected by a suspended pedestrian bridge across Small Street. An application is required to amend the City of Toronto Official Plan to permit additional height and density and an application to amend the former City of Toronto Zoning By-law 438-86, as amended by OMB-approved By-law 1174-2010, is required to permit additional height and density, amend the permitted uses, update zoning maps and revise certain zoning standards to permit the proposed development. This application forms part of the broader Quayside Master Plan, which is comprised of seven mixed use buildings on four development blocks and public realm improvements on the interior and perimiter of the site. The development includes 321,760 square metres of GFA allotted as 22,562 square metres of commercial, retail, institutional and other non-residential uses and 299,209 square metres of residential uses supporting 4,634 condo units and 869 affordable housing units. Public realm and infrastructure works to be delivered by Waterfront Toronto include the Queens Quay East extension, plazas at Parliament Street and Queens Quay East, an extended Water's Edge Promenade and a 0.4 hectare park.
Jun 29, 2023 · 333 LAKE SHORE BLVD E · City file - Zoning review13 231005 LPRClosedSep 5, 2013 · 333 LAKE SHORE BLVD E
Show 2 older records
- Zoning review12 181963 LPRClosedMay 29, 2012 · 333 LAKE SHORE BLVD E
- Zoning review12 103772 ZSVCancelledJan 10, 2012 · 333 LAKE SHORE BLVD E
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 22,241 m²
- Frontage
- 95.9 m
- Depth
- 252.9 m
- Street
- Lake Shore Blvd E
- Corner lot
- Yes, also on Parliament St252.9 m along it
- Public lane
- None
- Max height
- —
- Max lot coverage
- —
Around this lot
- Minor variances approved
- 100%6 of 6 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 26
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 6 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To permit a studio use (temporarily), as space for workshops, classes, and small group training, within the existing two-storey detached building.
307 LAKE SHORE BLVD E · Nov 26, 2025 · 189 m away - Minor varianceApproved
To alter the development standards for a 41-storey mixed-use building (as approved under Site Specific Zoning By-laws 512-2022(OLT) and 513-2022(OLT)) currently under construction, by increasing the building height, the total gross floor area, and the total number of dwelling units. Also, to reduce the minimum required outdoor and indoor amenity spaces, minimum required parking spaces for residents and visitors, minimum required accessible parking spaces, and the minimum required width of obstructed parking spaces. This new mixed-use building will have 46-storeys and will contain a total of 467 residential dwelling units.
31 PARLIAMENT ST · Feb 19, 2025 · 264 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 389-2023 (OLT)), for a 33-storey mixed-use building, with a 9-storey podium, and three levels of underground parking.
33 PARLIAMENT ST · Sep 6, 2023 · 291 m away - Minor varianceApproved
To construct a 18 storey mixed-use building that consists of 241 residential condominium suites, a community centre, grade related commercial uses and 4 levels of underground parking.
261 QUEENS QUAY E · Jul 8, 2020 · 252 m away - Minor varianceApproved
To construct an 11-storey mixed use building with retail space at-grade, office space above and one level of below-grade parking.
261 QUEENS QUAY E · Jul 8, 2020 · 252 m away
Latest activity nearby
- Building permit
Interior renovation of an existing commercial unit for use as a sunglasses retail boutique. Proposed work includes revisions to the retail layout, new interior finishes, lighting upgrades, installation of merchandise display fixtures, and the construction of an accessible washroom. No changes to the building envelope or gross floor area are proposed.
155 MERCHANTS' WHARF · Nov 13, 2026 · 157 m away - Building permit
Proposed interior alteration (tenant fit-out) to the ground floor retail unit including associated mechanical, electrical, and plumbing alterations, in a mixed use high rise building.
155 MERCHANTS' WHARF · Oct 7, 2026 · 157 m away - Building permit
Proposed interior alterations and change of use from office to event space (D to A2 Occupancy), including washroom, lighting, and finishes. Maximum Occupant Load = 918 persons
307 LAKE SHORE BLVD E · Jul 22, 2026 · 189 m away - Consent (lot split)Approved
To obtain consent to create new stratified easements/rights-of-way and to maintain existing easements/rights-of-way.
31 PARLIAMENT ST · Jul 15, 2026 · 264 m away - Consent (lot split)Approved
To obtain consent to create new stratified easements/rights-of-way and to maintain existing easements/rights-of-way.
31 R PARLIAMENT ST · Jul 15, 2026 · 270 m away - Building permit
Office renovation with new proposed partition walls - UNIT 302 and 303Convenience address is 251 Queens Quay St E
261 QUEENS QUAY E · Jun 18, 2026 · 252 m away - Development application
Draft Plan of Stamdard Condominium for 427 units.
31 PARLIAMENT ST · May 26, 2026 · 268 m away · City file - Development application
City Initiated Rezoning to amend the Zoning By-law for 291 Lake Shore Boulevard East, 2 Small Street and 200 Queens Quay East (Quayside Blocks 1B, 1C, and 2). A City-owned and operated Community Service, Cultural and Arts Facility is now proposed in the south-easterly portion of Block 1C, fronting on Queens Quay East. The proposal is to revise the minimum required non-residential gross floor area, including the minimum amount required to be dedicated to Community Services, Cultural and Arts Facilitates and General Institutions; to update Zoning Maps, including Map 3 Base Building Areas and Heights; and to revise Holding and Section 37 provisions. The proposed Zoning By-law amendment also revises building mechanical height permissions to respond to operational needs of the City¿s selected non-profit housing providers for Quayside.
2 SMALL ST · Apr 24, 2026 · 234 m away · City file - Consent (lot split)Approved
To obtain consent to sever the property into two lots (retail lands and parking lands) with a stratified severance and to create various easements/rights-of-ways within the 33-storey mixed-use building. Also, to maintain existing easements/rights-of-ways.
33 PARLIAMENT ST · Apr 15, 2026 · 291 m away - Zoning review
Closed
429 LAKE SHORE BLVD E · Mar 3, 2026 · 267 m away
Neighbourhood: St Lawrence-East Bayfront-The Islands
About the area around the lot, not the lot itself.
- Nearest station
- King Station24 min walk
- Nearest TTC stop
- Parliament St at Lake Shore Blvd East2 min walk
- Nearest cycling route
- Martin Goodman / Waterfront TrlMulti-Use Trail, 2 min walk
- Nearest traffic count
- 35,420 vehicles in 14 hLake Shore Blvd E / Parliament St / Martin Goodman Trl, 150 m away, Jun 19, 2024
- Serious collisions within 500 m
- 52021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 1 with cyclists
- Parks
- Water's Edge Promenade2 min walk
- Aitken Place Park4 min walk
- Biidaasige Park5 min walk
Schools within 1 km
- VOICE INTEGRATIVE PRIVATE SCHOOL Private 6 min walk
- GEORGE BROWN COLLEGE - YOUNG CENTRE FOR THE PERFORMING ARTS College 8 min walk
- MARKET LANE JR & SR PUBLIC SCHOOL English Public 9 min walk
- GEORGE BROWN COLLEGE - WATERFRONT CAMPUS College 9 min walk
- INGLENOOK COMMUNITY SCHOOL English Public 13 min walk
- ST MICHAEL CATHOLIC ELEMENTARY SCHOOL - BLDG 1 English Separate 13 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | St Lawrence-East Bayfront-The Islands | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $87,000 | $84,500 |
| Households that own their home | 40% | 54% |
| Population (2021) | 31,285 | 16,813 |
| Homes built in 1960 or before | 3% | 29% |
| Homes needing major repairs | 3% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | St Lawrence-East Bayfront-The Islands | City median |
|---|---|---|
| Assault | 1059.7 | 636.3 |
| Robbery | 96.3 | 69.5 |
| Shootings | 4.5 | 10.5 |
| Auto theft | 24.6 | 192.6 |
| Theft over $5,000 | 78.4 | 46.1 |
| Break and enter | 163.5 | 172.8 |
| Theft from vehicles | 163.5 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.