HousePrecheckCheck an address

333 Bering AveToronto · zoning, lot size and permit records

Employment · E 1.021.4 × 57.7 m1,166 m²on Bering Avecorner, also on Shawbridge Ave

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.1 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 22 131434 (Interior alterations to 2nd and 3rd floor, 2022, status Revocation Pending). Larger work can mean noise and trucks next door; read what each one is for.
  • Major Transit Station Area: KiplingThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
21.4 m frontage57.7 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2022

    Needs a closer look

    Still open in the City's records: 22 131434 (Interior alterations to 2nd and 3rd floor, 2022, status Revocation Pending).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 2 Committee of Adjustment files on this lot

    Good to know

    0 approved. A0170/19EYK (To legalize and maintain eight office units in the existing building, 2019); A298/12EYK (To convert the existing industrial/commercial building into 8 office units, 2012).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

12 records on file: more than at 100% of Toronto houses (median 0).

  • Zoning review26 177721 LPRClosed
    Jun 4, 2026 · 333 BERING AVE
  • Building permit22 131434Revocation Pending

    Interior alterations to 2nd and 3rd floor

    May 30, 2022 · 333 BERING AVE
  • Building permit11 191664Closed

    Rev 03 - 1. The 1 hr fire-rating has been removed from the Water Meter Room 1001 on Level 1, as this is not required as per OBC 9.10.10.3 Separation of Service Rooms as this building is sprinklered and the service equipment does not constitute a fire hazard. Vesna: No, building is not sprinklered and building is not Part 9 but Part 3.2. Sink and shower door has been added in Suite 100 on Level 23. Kitchens have been removed from Meeting Rooms 300, 400, 500 and 600 on Level 3.4. Washroom has been reconfigured in Suite 700 on Level 3.Proposal to revise interior alterations for suite 700 & 800 to combine into one unitRevision#1: Proposal to revise the interior alterations to convert existing industrial/commercial space into an eight unit office building. Addition of the floor between ground and 2nd floor. Three stories building. (VN added to description)Remove part of the east ground floor for (8) new parking spaces. (2) new stairs from ground floor to second floor. Second floor addition for storage and utility rooms.

    Nov 25, 2021 · 333 BERING AVE
  • Development application20 123225 WET 03 CDClosed

    The proposal is to create 8 condominium office units within an existing industrial building located at 333 Bering Avenue in the City of Toronto. Most of the proposed alterations are pertaining to the interior of the building, and building permit for the proposed interior alterations have been issued by the Cit

    Mar 6, 2020 · 333 BERING AVE · City file
  • Zoning review20 112075 ZZUClosed
    Feb 4, 2020 · 333 BERING AVE
  • Zoning review19 169285 LTOClosed
    Jun 11, 2019 · 333 BERING AVE
  • Minor varianceA0170/19EYKRefused

    To legalize and maintain eight office units in the existing building.

    May 9, 2019 · 333 BERING AVE
  • Zoning review19 109265 ZZCClosed
    Jan 28, 2019 · 333 BERING AVE
Show 4 older records
  • Zoning review18 253208 LTOClosed
    Nov 7, 2018 · 333 BERING AVE
  • Minor varianceA298/12EYKRefused

    To convert the existing industrial/commercial building into 8 office units.

    Jun 28, 2012 · 333 BERING AVE
  • Zoning review11 126847 ZPRClosed
    Feb 15, 2011 · 333 BERING AVE
  • Zoning review05 211936 LTOClosed
    Dec 23, 2005 · 333 BERING AVE

Lot facts

Area
1,166 m²
Frontage
21.4 m
Depth
57.7 m
Street
Bering Ave
Corner lot
Yes, also on Shawbridge Ave57.7 m along it
Public lane
None
Max height
—
Max lot coverage
—
  • Major Transit Station Area: Kipling. The lot is inside the Kipling Major Transit Station Area approved by the Province (Site and Area Specific Policy 626). Source
  • Zone E 1.0 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source

Around this lot

Minor variances approved
83%10 of 12 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
3

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 12 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct an ancillary storage structure in the rear yard.

    34 CHAUNCEY AVE · Mar 6, 2025 · 351 m away
  • Minor varianceApproved

    To permit a vehicle dealership and to permit a parking deficiency.

    56 SIX POINT RD · Mar 7, 2024 · 306 m away
  • Minor varianceApproved

    To maintain the existing building.

    891 KIPLING AVE · May 25, 2023 · 320 m away
  • Minor varianceApproved

    To maintain the existing building.

    889 KIPLING AVE · May 25, 2023 · 320 m away
  • Minor varianceApproved

    To permit vehicle car sales or a vehicle dealership within the existing vehicle repair shop or vehicle service shop.

    362 OLIVEWOOD RD · Jun 3, 2021 · 78 m away

Latest activity nearby

  • Zoning review

    Closed

    73 CHAUNCEY AVE · Sep 9, 2026 · 132 m away
  • Zoning review

    Cancelled

    56 CHAUNCEY AVE · Aug 20, 2026 · 192 m away
  • Building permit

    A proposal to erect and display 5 Wall Signs and one Ground Sign displaying static copy. ***MIDAS***

    371 OLIVEWOOD RD · Jun 18, 2026 · 255 m away
  • Building permit

    Proposal for interior alterations to auto shop/

    371 OLIVEWOOD RD · Jun 12, 2026 · 255 m away
  • Zoning review

    Closed

    333 BERING AVE · Jun 4, 2026 · 2 m away
  • Building permit

    New cafe within existing commercial/industrial operation. Includes reconfiguring washrooms for customer use.

    345 MUNSTER AVE · Mar 16, 2026 · 143 m away
  • Zoning review

    Application On Hold

    342 MUNSTER AVE · Mar 13, 2026 · 211 m away
  • Building permit

    Proposal for alterations to existing sprinkler system.

    55 FIELDWAY RD · Jan 23, 2026 · 279 m away
  • Zoning review

    Closed

    69 CHAUNCEY AVE · Nov 18, 2025 · 139 m away
  • Building permit

    Proposal for installation of a backflow preventor.

    37 SIX POINT RD · Oct 27, 2025 · 277 m away

Neighbourhood: Etobicoke City Centre

About the area around the lot, not the lot itself.

Nearest station
Kipling Station9 min walk
Nearest TTC stop
Kipling Ave at Olivewood Rd6 min walk
Nearest cycling route
Kipling AveCycle Track, 8 min walk
Nearest traffic count
15,126 vehicles in 8 hKipling Ave / Olivewood Rd, 360 m away, Feb 8, 2022
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Fieldway Parkette5 min walk
Six Points Park9 min walk
Chauncey - Islington Parkette10 min walk

Schools within 1 km

  • MINDWERX4KIDS LEARNING CENTRE SCHOOL Private 13 min walk
  • ACADEMY OF MATH AND ENGLISH Private 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureEtobicoke City CentreMedian neighbourhood
Median household income (2020)$83,000$84,500
Households that own their home50%54%
Population (2021)23,60016,813
Homes built in 1960 or before9%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleEtobicoke City CentreCity median
Assault844.4636.3
Robbery187.769.5
Shootings16.210.5
Auto theft601.8192.6
Theft over $5,000200.646.1
Break and enter210.3172.8
Theft from vehicles278.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.