HousePrecheckCheck an address

33 Queen St EToronto · zoning, lot size and permit records

Also 29 Queen St E, 31 Queen St E, 35 Queen St E, 37 Queen St E, 42 Richmond St E

Commercial residential · CR 7.8 (c4.5; r7.8) SS1 (x1830)≈ 54.0 × 63.5 m2,357 m²on Queen St E

Not a home

Carpark 26

The City of Toronto's real estate inventory lists Carpark 26 here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Transit, rail or parkingGood access, with trains, buses or cars and some noise.
  • Permits or applications open on this parcelStill open in the City's records: 24 140394 (Proposal to remove an existing generator on Level P1 and renovating the space for use a..., 2024, status Inspection); 13 236278 (Proposal to replace fire alarm panel in all 6 floors of existing multiple unit non resi..., 2013, status Inspection); 13 225580 (Proposal for new sprinklers in the basement level of existing multiple unit building -..., 2013, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 13 development applications open within 300 m, up to 80 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • 2 open orders or by-law investigations at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 26 252756 PRS 00 IV (Order Issued Property Standards: A barrier or deflector to prevent lighting and motoriz..., 2026, status Order Issued); 26 236347 PRS 00 IR (Property Standards, 2026, status Order Issued).
  • Major Transit Station Area: DundasThe City plans more homes around the station: good for transit, and more building over time.
N20 m
≈ 54.0 m frontage≈ 63.5 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 open orders or by-law investigations

    Needs a closer look

    Not resolved in the City's records: 26 252756 PRS 00 IV (Order Issued Property Standards: A barrier or deflector to prevent lighting and motoriz..., 2026, status Order Issued); 26 236347 PRS 00 IR (Property Standards, 2026, status Order Issued).

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 3 building permits open, the oldest since 2013

    Needs a closer look

    Still open in the City's records: 24 140394 (Proposal to remove an existing generator on Level P1 and renovating the space for use a..., 2024, status Inspection); 13 236278 (Proposal to replace fire alarm panel in all 6 floors of existing multiple unit non resi..., 2013, status Inspection); 13 225580 (Proposal for new sprinklers in the basement level of existing multiple unit building -..., 2013, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 13 development applications open within 300 m

    Good to know

    13 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 80 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

19 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 252756 PRS 00 IVOrder Issued

    Order Issued Property Standards: A barrier or deflector to prevent lighting and motorized or non-motorized vehicle lighting from shining directly into a dwelling unit is not provided and/or mai

    Sep 11, 2026 · 33 QUEEN ST E
  • By-law investigation26 236347 PRS 00 IROrder Issued

    Property Standards

    Sep 11, 2026 · 33 QUEEN ST E
  • Building permit24 140394Inspection

    Proposal to remove an existing generator on Level P1 and renovating the space for use as a Fuel Storage Room. Electrical services will be modified in the Computer Room on Level P3, and renovations will be made to enhance the Generator Room on Level P6

    Jul 12, 2024 · 33 QUEEN ST E
  • Building permit23 202080Closed

    Garage repairs including localized concrete repairs and replacement of existing waterproofing system.

    Oct 16, 2023 · 33 QUEEN ST E
  • Zoning review21 148002 LTOClosed
    Apr 30, 2021 · 31 QUEEN ST E
  • Building permit20 182552Closed

    Proposed minor interior renovations to Toronto Parking Authority (TPA) operations facilities at Carpark #26. No public parking spaces are proposed to be eliminated. [This parking facility operates as a public parking garage.]

    Nov 9, 2020 · 37 QUEEN ST E
  • Building permit14 203305Closed

    Proposal to install a new pedestrian ramp at the garage elevator lobby entrance

    Sep 15, 2014 · 33 QUEEN ST E
  • Building permit13 236278Inspection

    Proposal to replace fire alarm panel in all 6 floors of existing multiple unit non residential building.

    Oct 11, 2013 · 33 QUEEN ST E
Show 11 older records
  • Building permit13 225580Inspection

    Proposal for new sprinklers in the basement level of existing multiple unit building - Toronto Parking Authority.

    Sep 11, 2013 · 33 QUEEN ST E
  • Building permit11 327453Closed

    This is for the installation of three(3) electromagnetic locks. two(2) on the 2nd floor and one(1) on the 5th floor, The electromagnetic locks will be installed within office spaces on these floors. This is for the Toronto Parking Authority.

    Jan 9, 2012 · 33 QUEEN ST E
  • Building permit11 300972Closed

    Proposal for interior alterations to existing office space on floors 1 and 2. Scope of work includes constructing new access doors for security purposes. Toronto Parking Authority.

    Nov 14, 2011 · 33 QUEEN ST E
  • Building permit10 314768Cancelled

    To erect and display one Illuminated projecting sign at the northerly-facing first storey building wall in conjunction with an existing restaurant located on the premises.**Druxy's**

    Dec 15, 2010 · 33 QUEEN ST E
  • Zoning review06 192943 LTOClosed
    Nov 21, 2006 · 33 QUEEN ST E
  • Building permit02 102556Closed

    install mag locks: 1 on 4th floor, 1 on 5th floor

    Jan 11, 2002 · 33 QUEEN ST E
  • Building permit00 159100Closed

    alter plans by making layout changes on 3rd floor.

    Dec 21, 2001 · 33 QUEEN ST E
  • Building permit00 159106Closed - Dormant

    INSTALL H.V.A.V. SYSTEM IN CONNECTIONS WITH PERMIT #00-159100SEE STATEMENT OF UNDERTAKING.EXISTING- PARKING GARAGE RETAIL STORE, RESTAURANT AND OFFICE BUILDING.PROPOSED- SAME

    Jul 17, 2001 · 33 QUEEN ST E
  • Building permit01 121595Closed - Dormant

    install h.v.a.c system on 5th floor.see bp#00-159100

    Apr 20, 2001 · 33 QUEEN ST E
  • Building permit01 121587Closed

    install fixtures on 5th floor- 2 w.c.,1 urinal, 2 w.b., 1 h.w.t.; 6th floor- 3 a.d.; roof- 5 a.d. see bp#00-159100 PLANS

    Mar 28, 2001 · 33 QUEEN ST E
  • Zoning review93 025787 LTOClosed
    Nov 15, 1993 · 31 QUEEN ST E

Check before you build

  • Site-specific exception 900.11.10(1830)

    Needs a closer look

    2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(1830)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Section 12(1) 397 of former City of Toronto By-law 438-86

  2. Older by-law B

    Section 12(2) 132 of former City of Toronto By-law 438-86.

By-law 569-2013, Chapter 900

Lot facts

Area
2,357 m²
Frontage
54 mestimated, irregular lot
Depth
63.5 mestimated, irregular lot
Street
Queen St E
Corner lot
No
Public lane
None
House footprint
2,286 m²roof up to 47.4 m
Back yard
1.4 mhouse to rear lot line
Side yards
0 m and 0 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
1house, garage, sheds
Max height
61 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Dundas. The lot is inside the Dundas Major Transit Station Area approved by the Province (Site and Area Specific Policy 604). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Priority retail street: Queen Street East. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 7.8 (c4.5; r7.8) SS1 (x1830) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
  • 4 City trees in front of this lot. The City's street tree inventory lists 4 trees at this address: honey locust (8 cm), honey locust (8 cm), honey locust (8 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
94%17 of 18 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
36

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 18 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing 12-storey mixed-use building by enclosing the front outdoor patio of the ground floor eating establishment (restaurant).

    20 KING ST W · Jun 17, 2026 · 369 m away
  • Minor varianceApproved

    To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.

    134 JARVIS ST · Nov 12, 2025 · 348 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey attached building by increasing the non-residential floor space index.

    53 MUTUAL ST · Oct 1, 2025 · 392 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.

    53 A MUTUAL ST · Oct 1, 2025 · 387 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1017-2022), for the 53-storey mixed-use building, by reducing the non-residential space, and the number of short-term bicycle parking spaces required on-site. There will be a total of 591 residential dwelling units on this site. This is currently under the review of Site Plan Control (File No. 21 206338 STE 13 SA).

    241 CHURCH ST · Jul 30, 2025 · 481 m away

Latest activity nearby

  • Minor variancePending

    To alter the development standards (as approved under Site Specific Zoning By-Law 690-2021 and 691-2021), for a new 57-storey mixed-use building with four-level underground parking by reducing the required long-term bicycle parking spaces. A related Site Plan Control application (under File number 20 21 152905 STE 13 SA) has been approved. There will be a total of 445 residential dwelling units on this lot, 53 vehicular parking spaces, 201 long-term bicycle parking spaces, and 45 visitor bicycle parking spaces.

    60 QUEEN ST E · Dec 16, 2026 · 170 m away
  • Building permit

    Proposal for interior alterations with mechanical, plumbing, and electrical work to suit new layout on floor 4.

    99 QUEEN ST E · Nov 20, 2026 · 222 m away
  • Building permit

    Proposed interior alterations Building, plumbing and HVAC work to tenant space.

    151 YONGE ST · Nov 20, 2026 · 143 m away
  • Building permit

    Revision No.1: New Fire Shutter Window

    30 ADELAIDE ST E · Nov 20, 2026 · 168 m away
  • Building permit

    nstallation of Eighteen (18) electromagnetic locking device including all associated life safety requirements

    50 RICHMOND ST E · Nov 19, 2026 · 44 m away
  • Building permit

    Proposal to replace existing pre-action system fire control panel and associated initiating field devices.

    30 BOND ST · Nov 19, 2026 · 133 m away
  • Building permit

    Installation of 2 Double (9th Floor) and 3 Double (10th Floor) Electromagnetic locks using a power supply system

    1 ADELAIDE ST E · Nov 18, 2026 · 247 m away
  • Building permit

    7 wall signs***WELL HEALTH MEDICAL CENTRES***

    20 RICHMOND ST E · Nov 16, 2026 · 85 m away
  • Building permit

    Proposal for additions and interior alterations to existing Nightclub at 17-19 Toronto St.

    19 TORONTO ST · Nov 16, 2026 · 244 m away
  • Building permit

    Rev 02: Addition of exterior window replacement; Change to 3rd & 4th floor corridor walls from new metal stud FRR to existing wood stud with new FRR; Door replacement at 2nd floor Bar EntranceREV 01: - addition of exterior window replacement, change to 3rd & 4th floor corridor walls from new metal stud FRR to existing wood stud with new FRR, door replacement at 2nd floor Bar EntranceProposal for interior renovations to 3rd & 4th Floors; extention of exit stair; addition of roof-top stair enclosure; plus wood deck and guard on the roof. New sprinkler system for the entire building.

    124 CHURCH ST · Nov 16, 2026 · 145 m away

Neighbourhood: Downtown Yonge East

About the area around the lot, not the lot itself.

Nearest station
Queen Station2 min walk
Nearest TTC stop
Yonge St at Queen St East - Queen Station2 min walk
Nearest cycling route
Richmond St ECycle Track, 1 min walk
Nearest traffic count
7,207 vehicles in 8 hQueen St E / Bond St, 60 m away, Jul 23, 1990
Serious collisions within 500 m
162021–2026, killed or seriously injured: 2 fatal, 10 with pedestrians, 1 with cyclists
Parks
Cloud Gardens3 min walk
Courthouse Square Park4 min walk
45 Dalhousie St Park4 min walk

Schools within 1 km

  • VICTORIA STREET LINC English Public 3 min walk
  • KEYSTONE INTERNATIONAL SCHOOLS Private 4 min walk
  • ST MICHAEL'S CHOIR SCHOOL - GYMNASIUM BLDG English Separate 4 min walk
  • ST MICHAEL'S CHOIR SCHOOL - CHORAL BLDG English Separate 5 min walk
  • ST MICHAEL'S CHOIR SCHOOL - ELEMENTARY English Separate 5 min walk
  • ST MICHAEL'S CHOIR SCHOOL - SECONDARY English Separate 6 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureDowntown Yonge EastMedian neighbourhood
Median household income (2020)$69,500$84,500
Households that own their home36%54%
Population (2021)17,70016,813
Homes built in 1960 or before7%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleDowntown Yonge EastCity median
Assault2360.8636.3
Robbery143.369.5
Shootings11.910.5
Auto theft75.6192.6
Theft over $5,00099.546.1
Break and enter274.7172.8
Theft from vehicles390.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.