HousePrecheckCheck an address

33 Maitland StToronto · zoning, lot size and permit records

Residential · R (d2.0) (x875)17.6 × 41.3 m725 m²on Maitland Stbacks onto Sky Gilbert Lane

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 3 storeys, 37 rental units, built 1923More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelRecent records on this lot: 22 203332 STE 13 SA (Proposed 49-storey tower with 439 dwelling units that incorporates the street-facing vo..., 2022); 22 203333 STE 13 OZ (As further described in the application materials, we are proposing to remove the exist..., 2022). Larger work can mean noise and trucks next door; read what each one is for.
  • 24 development applications open within 300 m, up to 80 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • City upkeep score: 81 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: WellesleyThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
17.6 m frontage41.3 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: designated (Part IV)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • 4 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Order Issued Property Standards, Property Standards): 25 234350 PRS 00 IV (Order Issued Property Standards: Guard is less than 1,070 millimetres high, 2025); 25 234337 PRS 00 IR (Property Standards, 2025); 25 195235 PRS 00 IR (Property Standards, 2025); and 1 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 22 203332 STE 13 SA (Proposed 49-storey tower with 439 dwelling units that incorporates the street-facing vo..., 2022); 22 203333 STE 13 OZ (As further described in the application materials, we are proposing to remove the exist..., 2022).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 24 development applications open within 300 m

    Good to know

    24 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 80 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 81 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (3 storeys, 37 units, built 1923).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

12 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 131649 WST 00 IVClosed

    Notice Issued Waste: Owner of land failed to clean and clear refuse that has been thrown, placed, dumped or deposited, including but not limited to: cardboard/construction paper, pl

    Mar 7, 2026 · 33 MAITLAND ST
  • By-law investigation26 131642 GRA 00 IVClosed

    Notice Issued Graffiti

    Mar 7, 2026 · 33 MAITLAND ST
  • By-law investigation26 126180 GRA 00 IRClosed

    Graffiti

    Mar 7, 2026 · 33 MAITLAND ST
  • By-law investigation26 126179 WST 00 IRClosed

    Waste

    Mar 7, 2026 · 33 MAITLAND ST
  • By-law investigation25 234350 PRS 00 IVClosed

    Order Issued Property Standards: Guard is less than 1,070 millimetres high.

    Oct 2, 2025 · 33 MAITLAND ST
  • By-law investigation25 234337 PRS 00 IRClosed

    Property Standards

    Oct 2, 2025 · 33 MAITLAND ST
  • By-law investigation25 195235 PRS 00 IRClosed

    Property Standards

    Jul 17, 2025 · 33 MAITLAND ST
  • By-law investigation25 107755 HEA 00 IRClosed

    Adequate Heat

    Jan 22, 2025 · 33 MAITLAND ST
Show 4 older records
  • Zoning review22 203333 POZClosed
    Oct 6, 2022 · 33 MAITLAND ST
  • Development application22 203332 STE 13 SAUnder Review

    Proposed 49-storey tower with 439 dwelling units that incorporates the street-facing volume of the heritage designated 37 Maitland Street structure into the new building podium.

    Sep 14, 2022 · 33 MAITLAND ST · City file
  • Development application22 203333 STE 13 OZOMB Approved

    As further described in the application materials, we are proposing to remove the existing building at 33 Maitland as well as the rear section of 37 Maitland and redevelop the property with a design-forward residential project. The main street-facing volume of 37 Maitland (Heritage designated) is to be maintained, restored, and incorporated into the new building podium. The development will include 31,830sm of residential GFA and 439 housing units, located within a slender 49 storey tower. Below grade are 2 underground parking levels containing 27 resident and visitor spaces.

    Sep 14, 2022 · 33 MAITLAND ST · City file
  • Building permit09 151026Closed

    Backflow permit for existing apartment building

    Jul 20, 2009 · 33 MAITLAND ST

Check before you build

  • Site-specific exception 900.2.10(875)

    Needs a closer look

    1 site-specific rule and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(875)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The lands must comply with exception 900.2.10(4).

  2. Older by-law A

    Section 12(1) 434 of former City of Toronto By-law 438-86

  3. Older by-law B

    Section 12(2) 208 of former City of Toronto By-law 438-86

2 parts for other addresses
  • C On 26 Alexander St., former City of Toronto by-laws 22303 and 35-74
  • D On 25 Maitland St., former City of Toronto by-laws 511-82 and 277-85.
By-law 569-2013, Chapter 900

Lot facts

Area
725 m²
Frontage
17.6 m
Depth
41.3 m
Street
Maitland St
Corner lot
No
Public lane
Sky Gilbert Lane, 17.6 m along it
House footprint
505 m²roof up to 19.6 m
Back yard
0.3 mhouse to rear lot line
Side yards
0.1 m and 2 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
1house, garage, sheds
Max height
30 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Site and Area Specific Policy 382. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Major Transit Station Area: Wellesley. The lot is inside the Wellesley Major Transit Station Area approved by the Province (Site and Area Specific Policy 602). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone R (d2.0) (x875) (Residential). Chapter 10, section 10.10 of the by-law. Source

Around this lot

Minor variances approved
100%27 of 27 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
52

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 27 variance decisions: more than at 59% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing three-storey townhouse dwelling by constructing interior alterations to the existing open-to-above area between the basement and ground floor level of the dwelling by enclosing the floor (increasing the area of habitable space).

    97 GRANBY ST · Oct 15, 2025 · 441 m away
  • Minor varianceApproved

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition, a complete third storey addition and a rear rooftop terrace. The existing home occupation will be maintained.

    63 ST NICHOLAS ST · Feb 15, 2023 · 486 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached rooming house by constructing a rear four-storey addition. A total of 26 rooms for living accommodation will be provided.

    344 JARVIS ST · Sep 21, 2022 · 447 m away
  • Minor varianceApproved

    To convert the existing single family, two-storey building into a two-storey duplex by constructing a front basement walkout and porch.

    64 MCGILL ST · Jan 26, 2022 · 415 m away
  • Minor varianceApproved

    To alter the existing three-storey townhouse by constructing side one-storey additions, a rear attached garage with rooftop deck and a side third storey addition.

    10 ST JOSEPH ST · Jan 20, 2021 · 352 m away

Latest activity nearby

  • Minor variancePending

    To alter the development standards for the previously approved two-tower mixed-use development (approved under Site Specific Zoning By-law 1096-2021), by reducing the height of a portion of the first storey (to include a mezzanine level located between the first and second storeys). There will be a total of 767 rental dwelling units (of which 30.4% (233 units) will be affordable rental units), as well as a childcare center on this lot. A related Site Plan Control application (under File Number 19 127591 STE 13 SA) has received Notice of Approval conditions.

    27 GROSVENOR ST · Nov 25, 2026 · 266 m away
  • Zoning review

    Closed

    450 YONGE ST · Nov 23, 2026 · 273 m away
  • Building permit

    Proposal for interior alterations to lobby, main corridor, bar & restaurant at ground floor.

    475 YONGE ST · Nov 17, 2026 · 153 m away
  • Building permit

    INTERIOR ALTERATIONS TO GROUND FLOOR VACANT COMMERCIAL UNIT 3 FOR PROPOSED COFFEE SHOP: 'DARKHORSE ESPRESSO'

    484 YONGE ST · Nov 16, 2026 · 178 m away
  • Building permit

    Proposed interior alterations for dental office

    16 WELLESLEY ST W · Nov 10, 2026 · 253 m away
  • Building permit

    Interior alteration to combine an existing gym room and adjacent pool room into one fitness room.

    475 YONGE ST · Nov 10, 2026 · 153 m away
  • Building permit

    Proposed interior alteration at second, third, fifth and sixth floor to convert the property from office building to mixed-use building; Proposed: 10 residential units, 1 wellness studio and 5 officesExisting: 1 wellness studio at first floor and 1 office at fourth floor

    9 ST NICHOLAS ST · Nov 9, 2026 · 271 m away
  • Building permit

    1 projecting sign**SHIRIN JAAN**

    508 YONGE ST · Nov 5, 2026 · 138 m away
  • Building permit

    2 Wall Sign****AXIA STATION****

    608 YONGE ST · Nov 5, 2026 · 288 m away
  • Building permit

    1 Wall Sign

    522 YONGE ST · Nov 2, 2026 · 137 m away

Neighbourhood: Church-Wellesley

About the area around the lot, not the lot itself.

Nearest station
Wellesley Station3 min walk
Nearest TTC stop
Yonge St at Grosvenor St2 min walk
Nearest cycling route
Wellesley St ECycle Track, 3 min walk
Nearest traffic count
1,413 vehicles in 8 hAlexander St / Maitland Ter, 100 m away, Feb 7, 2006
Serious collisions within 500 m
122021–2026, killed or seriously injured: 2 fatal, 9 with pedestrians, 1 with cyclists
Parks
Alexander Street Parkette1 min walk
Paul Kane House Parkette3 min walk
Dr. Lillian McGregor Park3 min walk

Schools within 1 km

  • THE YMCA ACADEMY SECONDARY SCHOOL Private 3 min walk
  • NATIONAL BALLET SCHOOL - MAISON STAINES HOUSE & SALLE CURRIE HALL Private 4 min walk
  • CHURCH ST JR & NATIVE LEARNING CTR English Public 5 min walk
  • NATIONAL BALLET SCHOOL - BETTY OLIPHANT THEATRE Private 6 min walk
  • TAIE INTERNATIONAL INSTITUTE SCHOOL Private 6 min walk
  • NATIONAL BALLET SCHOOL - THE SHOE ROOM Private 6 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureChurch-WellesleyMedian neighbourhood
Median household income (2020)$60,400$84,500
Households that own their home24%54%
Population (2021)22,32016,813
Homes built in 1960 or before15%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleChurch-WellesleyCity median
Assault1264.6636.3
Robbery93.269.5
Homicide3.35.3
Auto theft46.6192.6
Theft over $5,000106.546.1
Break and enter146.4172.8
Theft from vehicles206.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.