HousePrecheckCheck an address

329 Royal York RdToronto · zoning, lot size and permit records

40.7 × 53.8 m2,144 m²on Royal York Rdbacks onto Peelar Mews

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • Permits or applications open on this parcelStill open in the City's records: 04 203912 (Enlarge 7 basement windows to improve lighting & install new guard railing around new w..., 2005, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 16 development applications open within 300 m, up to 51 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
N20 m
40.7 m frontage53.8 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: designated (Part IV)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • Building permit open since 2005

    Needs a closer look

    Still open in the City's records: 04 203912 (Enlarge 7 basement windows to improve lighting & install new guard railing around new w..., 2005, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 16 development applications open within 300 m

    Good to know

    16 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 51 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • By-law investigation26 229886 GRA 00 IVClosed

    Notice Issued Graffiti

    Jul 21, 2026 · 329 ROYAL YORK RD
  • By-law investigation26 206245 GRA 00 IRClosed

    Graffiti

    Jul 21, 2026 · 329 ROYAL YORK RD
  • Zoning review07 284220 ZPRClosed
    Dec 4, 2007 · 329 ROYAL YORK RD
  • Building permit06 190164Closeddemolition

    Demolition of Place of Worship due to fire damage

    Dec 11, 2006 · 329 ROYAL YORK RD
  • Zoning review05 158313 ZPUClosed
    Jul 11, 2005 · 329 ROYAL YORK RD
  • Building permit04 203912Inspection

    Enlarge 7 basement windows to improve lighting & install new guard railing around new windows to Christ church

    Jan 12, 2005 · 329 ROYAL YORK RD
  • Zoning review04 142200 ZPUClosed
    Jun 1, 2004 · 329 ROYAL YORK RD

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
2,144 m²
Frontage
40.7 m
Depth
53.8 m
Street
Royal York Rd
Corner lot
No
Public lane
Peelar Mews, 14.6 m along it
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    100%22 of 22 decisions
    Garden suite permits
    2
    Laneway suite permits
    0
    Multiplex permits
    9
    Development applications
    24

    Within 300 m, last 10 years. 11 suite and multiplex permits: more than at 77% of Toronto houses (median 3). 22 variance decisions: more than at 53% of Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceRefused

      To convert the existing building under construction into an apartment building containing 6 dwelling units.

      63 STATION RD · Nov 5, 2026 · 349 m away
    • Minor varianceApproved

      To construct a new garden suite in the rear yard.

      140 STANLEY AVE · Aug 27, 2026 · 279 m away
    • Minor varianceApproved

      To construct a two-storey west side addition and a second storey rear addition.

      181 MELROSE ST · Apr 23, 2026 · 479 m away
    • Minor varianceApproved

      To enclose the existing front yard porch.

      10 HAROLD ST · Mar 26, 2026 · 271 m away
    • Minor varianceApproved

      To construct a new attached garage.

      19 ST GEORGE ST · Feb 26, 2026 · 427 m away

    Latest activity nearby

    • Consent (lot split)Pending

      To obtain consent to create an easement/right-of-way.

      365 ROYAL YORK RD · Jan 7, 2027 · 199 m away
    • Consent (lot split)Pending

      To obtain consent to create an easement/right-of-way.

      365 ROYAL YORK RD · Jan 7, 2027 · 199 m away
    • Consent (lot split)Pending

      To obtain consent to create an easement/right-of-way.

      365 ROYAL YORK RD · Jan 7, 2027 · 199 m away
    • Minor variancePending

      To construct a new 14-storey affordable rental building with co-op units that will contain a total of 183 rental dwelling units. The development will be located within Block B on the property municipally known as 18 Buckingham Street.

      18 BUCKINGHAM ST · Dec 3, 2026 · 272 m away
    • Consent (lot split)Pending

      Cancelled

      365 ROYAL YORK RD · Nov 18, 2026 · 199 m away
    • Consent (lot split)Pending

      In Progress

      367 ROYAL YORK RD · Nov 12, 2026 · 209 m away
    • Consent (lot split)Pending

      Cancelled

      101 PORTLAND ST · Nov 12, 2026 · 223 m away
    • Consent (lot split)Pending

      Cancelled

      375 ROYAL YORK RD · Nov 12, 2026 · 244 m away
    • Minor variancePending

      Postponed

      109 CAVELL AVE · Nov 6, 2026 · 261 m away
    • Building permit

      Fire damage restoration of an existing 3-storey mixed-use building. Work includes replacement of fire-damaged roof components, reconstruction of portions of the third-floor exterior wall and interior partitions, localized masonry repairs, reinstatement of fire separations and life safety systems, and associated interior finish restoration. No change to use, height, footprint, or number of units.

      149 PORTLAND ST · Nov 5, 2026 · 245 m away

    Neighbourhood: Mimico-Queensway

    About the area around the lot, not the lot itself.

    Nearest station
    Mimico GO Station1 min walk
    Nearest TTC stop
    Royal York Rd at Newcastle St - Mimico GO Station1 min walk
    Nearest cycling route
    Royal York RdBike Lane, 1 min walk
    Nearest traffic count
    7,694 vehicles in 8 hRoyal York Rd / Newcastle St, 80 m away, Dec 13, 2022
    Serious collisions within 500 m
    42021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 1 with cyclists
    Parks
    Coronation Park - Etobicoke1 min walk
    Stanley Avenue Park6 min walk
    Queens Avenue Parkette6 min walk

    Schools within 1 km

    • OAK LEARNERS Private 4 min walk
    • ST LEO CATHOLIC ELEMENTARY SCHOOL English Separate 5 min walk
    • GEORGE R GAULD JR SCHOOL English Public 7 min walk
    • ST LEO CATHOLIC ELEMENTARY SCHOOL (FUTURE ADDRESS FOR MAIN ENTRANCE) English Separate 7 min walk
    • MIMICO ADULT CENTRE English Public 7 min walk
    • PHOENIX MONTESSORI SCHOOL Private 9 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureMimico-QueenswayMedian neighbourhood
    Median household income (2020)$84,000$84,500
    Households that own their home53%54%
    Population (2021)17,04516,813
    Homes built in 1960 or before43%29%
    Homes needing major repairs7%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleMimico-QueenswayCity median
    Assault4209.2636.3
    Robbery41.569.5
    Homicide4.25.3
    Auto theft224.2192.6
    Theft over $5,00066.446.1
    Break and enter132.8172.8
    Theft from vehicles99.6188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.