HousePrecheckCheck an address

3285 Lake Shore Blvd WToronto · zoning, lot size and permit records

Also 102 Twenty Fifth St, 104 Twenty Fifth St, 3287 Lake Shore Blvd W

7.6 × 36.7 m278 m²on Lake Shore Blvd Wcorner, also on Twenty Fifth St

Not a single house

Several homes on one parcel

4 different civic addresses share this parcel: a townhouse row, a co-op or a complex of homes rather than one house. Build options for a house do not apply to one home here, and the City's records for the parcel may be about any of them.

Looking at a house nearby? What this means for you

  • 4 homes on one parcel of 0.0 haA denser block than the houses around it: more cars and people, often with shared driveways and parking.
  • 2 development applications open within 300 m, up to 6 storeysNew buildings may go up around here in the next years. More change nearby than at 81% of Toronto houses.

Want to check a home here before you buy?

We are building checks for homes in complexes and co-ops. Leave your email and we will tell you when it is ready.

N20 m
7.6 m frontage36.7 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 by-law investigations closed in the last two years

    Good to know

    Closed files (Property Standards): 26 136587 PRS 00 IR (Property Standards, 2026); 24 250874 PRS 00 IR (Property Standards, 2024).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 6 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

4 records on file: more than at 88% of Toronto houses (median 0).

  • By-law investigation26 136587 PRS 00 IRClosed

    Property Standards

    Mar 30, 2026 · 3285-3287 LAKE SHORE BLVD W
  • By-law investigation24 250874 PRS 00 IRClosed

    Property Standards

    Dec 16, 2024 · 3285 LAKE SHORE BLVD W
  • Zoning review23 174287 LTOClosed
    Jul 14, 2023 · 3285 LAKE SHORE BLVD W
  • Zoning review06 142020 LTOClosed
    Jun 2, 2006 · 3285-3287 LAKE SHORE BLVD W

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
278 m²
Frontage
7.6 m
Depth
36.7 m
Street
Lake Shore Blvd W
Corner lot
Yes, also on Twenty Fifth St36.7 m along it
Public lane
None
House footprint
182 m²roof up to 14.5 m
Back yard
12.2 mhouse to rear lot line
Side yards
0 m and 0 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: honey locust (27 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
75%43 of 57 decisions
Garden suite permits
8
Laneway suite permits
0
Multiplex permits
11
Development applications
4

Within 300 m, last 10 years. 19 suite and multiplex permits: more than at 87% of Toronto houses (median 3). 57 variance decisions: more than at 90% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new detached dwelling with an attached garage.

    21 ARCADIAN CRCL · Nov 5, 2026 · 429 m away
  • Minor varianceApproved

    To permit a driveway in the front yard.

    82 ASH CRES · Jul 30, 2026 · 469 m away
  • Minor varianceApproved

    To construct a second-storey addition above the existing dwelling.

    12 MEAFORD AVE · May 14, 2026 · 247 m away
  • Minor varianceApproved

    To construct a new fourplex

    76 TWENTY FOURTH ST · Apr 23, 2026 · 421 m away
  • Minor varianceRefused

    To permit a front yard parking space.

    12 TWENTY SECOND ST · Mar 26, 2026 · 224 m away

Latest activity nearby

  • Consent (lot split)Pending

    To obtain consent to sever the property into two undersized residential lots.

    83 TWENTY SEVENTH ST · Dec 3, 2026 · 218 m away
  • Minor variancePending

    To construct a new semi-detached dwelling with an attached garage and a secondary suite in the basement.

    83 TWENTY SEVENTH ST · Dec 3, 2026 · 218 m away
  • Minor variancePending

    To construct a new semi-detached dwelling with an attached garage and a secondary suite in the basement.

    83 TWENTY SEVENTH ST · Dec 3, 2026 · 218 m away
  • Minor variancePending

    Postponed

    90 TWENTY THIRD ST · Nov 20, 2026 · 214 m away
  • Zoning review

    Application Acceptable

    3297-3301 LAKE SHORE BLVD W · Nov 13, 2026 · 31 m away
  • Minor variancePending

    Accepted

    16 DAISY AVE · Nov 10, 2026 · 253 m away
  • Zoning review

    Notice Sent

    86 TWENTY THIRD ST · Oct 30, 2026 · 225 m away
  • Building permit

    Construction of a new 18'-0" x 7'-0" (11.71 m²) freestanding rear deck serving the existing residential dwelling, with pressure-treated wood framing, concrete sonotube footings, composite decking and 42-inch aluminum guards. Deck to remain structurally independent from the existing dwelling.

    73 TWENTY SEVENTH ST · Oct 15, 2026 · 268 m away
  • Zoning review

    Notice Sent

    16 DAISY AVE · Oct 6, 2026 · 253 m away
  • Building permit

    Back water valve with sump pump

    91 ALDER CRES · Sep 30, 2026 · 167 m away

Neighbourhood: Long Branch

About the area around the lot, not the lot itself.

Nearest station
Long Branch GO Station27 min walk
Nearest TTC stop
Lake Shore Blvd West at Twenty Sixth St1 min walk
Nearest cycling route
Lake Shore Blvd WBike Lane, 1 min walk
Nearest traffic count
8,658 vehicles in 8 hLake Shore Blvd W / Twenty Fifth St, 40 m away, Jun 11, 1984
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Colonel Samuel Smith Park6 min walk
Skeens Lane Parkette7 min walk
Don Russell Memorial Park8 min walk

Schools within 1 km

  • HUMBER COLLEGE SCHOOL - LAKESHORE CAMPUS College 5 min walk
  • TWENTIETH STREET JR SCHOOL English Public 6 min walk
  • VINCENT MASSEY ACADEMY Private 7 min walk
  • PENGUIN PRIVATE SCHOOL Private 8 min walk
  • THE HOLY TRINITY SCHOOL English Separate 9 min walk
  • JAMES S BELL JR MDL SPORTS AND WELLNESS ACADEMY English Public 9 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureLong BranchMedian neighbourhood
Median household income (2020)$83,000$84,500
Households that own their home50%54%
Population (2021)11,36016,813
Homes built in 1960 or before38%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleLong BranchCity median
Assault577.9636.3
Robbery45.669.5
Auto theft159.7192.6
Theft over $5,00022.846.1
Break and enter182.5172.8
Theft from vehicles129.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.