HousePrecheckCheck an address

3267 Bloor St WToronto · zoning, lot size and permit records

Also 3269A Bloor St W, 3269B Bloor St W, 3269 Bloor St W, 3271 Bloor St W, 3273 Bloor St W

52.3 × 29.8 m1,546 m²on Bloor St Wbacks onto Ln S Bloor E Gardenvale

Not a home

A commercial or mixed-use building

4 different civic addresses share this parcel, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • 3 development applications open within 300 m, up to 16 storeysNew buildings may go up around here in the next years. More change nearby than at 81% of Toronto houses.
N20 m
52.3 m frontage29.8 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (100% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (100% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Natural Heritage System (100% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 16 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • Zoning review26 235700 LTOClosed
    Sep 11, 2026 · 3267-3273 BLOOR ST W
  • Zoning review26 211088 LPRClosed
    Jul 29, 2026 · 3267 BLOOR ST W
  • Building permit26 135214Closed

    Proposal for interior alterations to existing beauty salon.

    Apr 2, 2026 · 3267-3273 BLOOR ST W
  • Zoning review24 218785 LTOClosed
    Sep 27, 2024 · 3267 BLOOR ST W
  • Building permit20 118863Cancelled

    Proposal to install Blackflow Prevention Device in an exisiting non-residential building.

    Feb 25, 2020 · 3267-3273 BLOOR ST W
  • Zoning review08 208872 LTOCancelled
    Oct 1, 2008 · 3267-3273 BLOOR ST W
  • Zoning review04 176502 ZPUClosed
    Sep 23, 2004 · 3267-3273 BLOOR ST W

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
1,546 m²
Frontage
52.3 m
Depth
29.8 m
Street
Bloor St W
Corner lot
No
Public lane
Ln S Bloor E Gardenvale, 60.1 m along it
House footprint
767 m²roof up to 21.2 m
Back yard
10.7 mhouse to rear lot line
Side yards
0.2 m and 0.8 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    97%35 of 36 decisions
    Garden suite permits
    1
    Laneway suite permits
    1
    Multiplex permits
    0
    Development applications
    4

    Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 36 variance decisions: more than at 70% of Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To construct a second storey addition above the existing dwelling and a two-storey rear and south side addition. The altered dwelling will contain a total of two residential units.

      1205 ISLINGTON AVE · Jul 30, 2026 · 443 m away
    • Minor varianceApproved

      To construct a new rear deck with a second storey addition above.

      74 BRENTWOOD RD S · May 28, 2026 · 447 m away
    • Minor varianceApproved

      To demolish the existing detached garage in the rear yard and to construct a storage shed in the rear yard.

      44 CLIVEDEN AVE · Dec 4, 2025 · 469 m away
    • Minor varianceApproved

      To construct a new detached triplex and a new detached garage with a garden suite above, in the rear yard.

      1199 ISLINGTON AVE · Nov 20, 2025 · 452 m away
    • Minor varianceApproved

      To construct a new detached triplex and a new detached garage with a garden suite above, in the rear yard.

      1201 ISLINGTON AVE · Nov 20, 2025 · 450 m away

    Latest activity nearby

    • Zoning review

      Application On Hold

      3250 BLOOR ST W · Nov 19, 2026 · 256 m away
    • Building permit

      One projecting sign.***COMO***

      3250 BLOOR ST W · Nov 12, 2026 · 256 m away
    • Building permit

      Revision 1: Permit revision to amend the following: building envelope and interior assembly types; extension of North Stair to the basement; adding the tenanted Grooming suite to scope; revised layout to ground & 2nd floors; various updates to doors, windows & screens.Proposal for a three storey addition to existing building and interior alterations.

      3265 BLOOR ST W · Sep 24, 2026 · 38 m away
    • Building permit

      First party sign **COMO**

      3250 BLOOR ST W · Sep 22, 2026 · 256 m away
    • Zoning review

      Closed

      3267-3273 BLOOR ST W · Sep 11, 2026 · 21 m away
    • Building permit

      1 wall sign.***COMO RESTAURANT***

      3250 BLOOR ST W · Sep 8, 2026 · 256 m away
    • Building permit

      Revision 1: add a fabric awning over the patio areaInterior renovations and exterior patio and facade renovations to existing restaurant unit. - Co Mo - Unit 126

      3250 BLOOR ST W · Sep 8, 2026 · 256 m away
    • Zoning review

      Closed

      3267 BLOOR ST W · Jul 29, 2026 · 21 m away
    • Building permitdemolition

      PROPOSED 2 STOREY SFD DETACHED HOME

      48 GARDENVALE RD · May 5, 2026 · 243 m away
    • Building permitdemolition

      Proposal for demolition permit to make way for a future mixed-use condominium development, which includes the lands at 3100 Bloor Street West, and 4-8 Montgomery Road.

      8 MONTGOMERY RD · May 5, 2026 · 251 m away

    Neighbourhood: Stonegate-Queensway

    About the area around the lot, not the lot itself.

    Nearest station
    Islington Station9 min walk
    Nearest TTC stop
    Bloor St West at Aberfoyle Cres1 min walk
    Nearest cycling route
    Bloor St WCycle Track, 1 min walk
    Nearest traffic count
    19,052 vehicles in 14 hBloor St W / Gardenvale Rd / Aberfoyle Cres, 80 m away, May 12, 2026
    Serious collisions within 500 m
    22021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 0 with cyclists
    Parks
    Tom Riley Park1 min walk
    Trca Lands ( 80)1 min walk
    Birchview Boulevard Parkette5 min walk

    Schools within 1 km

    • OUR LADY OF SORROWS CATHOLIC ELEMENTARY SCHOOL English Separate 5 min walk
    • ETOBICOKE COLLEGIATE INSTITUTE English Public 10 min walk
    • THE LEARNING COMMON Private 13 min walk
    • ISLINGTON JR MDL SCHOOL English Public 13 min walk
    • SUNNYLEA JR SCHOOL English Public 16 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureStonegate-QueenswayMedian neighbourhood
    Median household income (2020)$104,000$84,500
    Households that own their home63%54%
    Population (2021)25,65016,813
    Homes built in 1960 or before55%29%
    Homes needing major repairs6%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleStonegate-QueenswayCity median
    Assault465.6636.3
    Robbery40.869.5
    Homicide3.45.3
    Shootings13.610.5
    Auto theft193.7192.6
    Theft over $5,0006846.1
    Break and enter217.5172.8
    Theft from vehicles129.2188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.