HousePrecheckCheck an address

325 Parliament StToronto · zoning, lot size and permit records

Also 329 Parliament St, 480 Dundas St E

≈ 49.6 × 109.7 m4,271 m²on Parliament Stcorner, also on Dundas St E

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelStill open in the City's records: 20 190802 (Replace A/C unit, 2020, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 5 development applications open within 300 m, up to 35 storeysNew buildings may go up around here in the next years. More change nearby than at 97% of Toronto houses.
N20 m
≈ 49.6 m frontage≈ 109.7 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2020

    Needs a closer look

    Still open in the City's records: 20 190802 (Replace A/C unit, 2020, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 3 by-law investigations closed in the last two years

    Good to know

    Closed files (Order Issued Property Standards, Property Standards): 26 143715 PRS 00 IR (Property Standards, 2026); 25 248322 PRS 00 IV (Order Issued Property Standards: The property has not been repaired in accordance with..., 2025); 25 203001 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 5 development applications open within 300 m

    Good to know

    5 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 35 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

10 records on file: more than at 99% of Toronto houses (median 0).

  • By-law investigation26 143715 PRS 00 IRClosed

    Property Standards

    Apr 14, 2026 · 325 PARLIAMENT ST
  • By-law investigation25 248322 PRS 00 IVClosed

    Order Issued Property Standards: The property has not been repaired in accordance with the standards.

    Jul 30, 2025 · 325 PARLIAMENT ST
  • By-law investigation25 203001 PRS 00 IRClosed

    Property Standards

    Jul 30, 2025 · 325 PARLIAMENT ST
  • Building permit20 190802Permit Issued

    Replace A/C unit

    Oct 19, 2020 · 480 DUNDAS ST E
  • Building permit19 189716Closed

    To erect and display two static illuminated overhanging structure signs. Erected on the first storey of the west and south canopy located at the premises. **FRESH CO**

    Aug 13, 2019 · 325 PARLIAMENT ST
  • Building permit10 310661Closed

    To erect and display two illuminated overhanging structure signs on each of the southerly and northerly facing external surface areas of an existing entrance canopy at an existing ground floor retail unit in an existing mixed-use residential condominium. **Fresh Co.**

    Jan 20, 2011 · 325 PARLIAMENT ST
  • Building permit10 273594Closed

    To erect and display two illuminated overhanging structure signs atop an existing entrance canopy at an existing ground floor retail unit in an existing mixed-use residential condominium. **Fresh Co.**

    Nov 5, 2010 · 325 PARLIAMENT ST
  • Zoning review10 285230 LTOClosed
    Oct 26, 2010 · 325 PARLIAMENT ST
Show 2 older records
  • Building permit09 154089Closed

    REVISION TO EXISTING BUILDING PERMIT - REVISION TO INTERIOR PARTITIONING. interior alterations to convert vacant space to new RBC bank - ground floor

    Jul 12, 2010 · 480 DUNDAS ST E
  • Building permit09 190167Closed

    Proposal for interior alterations of a ground floor suite for new office space in the Regent Park building. New tenant is "Roger's".

    Dec 7, 2009 · 329 PARLIAMENT ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
4,271 m²
Frontage
49.6 mestimated, irregular lot
Depth
109.7 mestimated, irregular lot
Street
Parliament St
Corner lot
Yes, also on Dundas St E109.7 m along it
Public lane
None
House footprint
2,015 m²
Back yard
29.6 mhouse to rear lot line
Side yards
0 m and 4.8 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
5house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    93%26 of 28 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    6
    Development applications
    13

    Within 300 m, last 10 years. 6 suite and multiplex permits: more than at 64% of Toronto houses (median 3). 28 variance decisions: more than at 60% of Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a side (south) two storey addition. Also, to construct rear ground floor and second storey bay windows, a rear second storey balcony, and a rear third storey rooftop pergola and terrace extension (above the second storey roof).

      380 BERKELEY ST · Jun 3, 2026 · 488 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 141-2005 (as amended by By-laws 1325-2023 and 1392-2024)) for a mixed-use building encompassing Tower D and including a podium/base building on the lands between Dreamer¿s Way and Street G, in regards to the phasing requirements (the construction of Street G, and Sackville Street) and by increasing the height of the mechanical penthouse. A Site Plan Control application (File No. 25 103941 STE 13 SA) is currently under review and consideration. This building will contain 271 affordable rental housing units, and 33,161 m² of residential gross floor area, 913 m² of ground floor retail space, and 1,160 m² of ground floor community space.

      325 GERRARD ST E · Oct 1, 2025 · 268 m away
    • Minor varianceApproved

      To alter the existing two-storey detached dwelling by constructing a rear two-storey addition with a ground floor covered deck. The existing rear one-storey addition and rear deck will be demolished.

      320 ONTARIO ST · May 28, 2025 · 302 m away
    • Minor varianceApproved

      To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition with a rear ground floor deck.

      337 SACKVILLE ST · Mar 19, 2025 · 387 m away
    • Minor varianceApproved

      To continue to permit the use of the existing rear second storey rooftop deck/terrace as part of the existing restaurant.

      454 PARLIAMENT ST · Feb 19, 2025 · 466 m away

    Latest activity nearby

    • Minor variancePending

      To alter the development standards (as approved under Site Specific Zoning By-law 770-2023), for the 10-storey (39.95 m, including the mechanical penthouse) approved mixed-use building with a two-level underground parking garage, by increasing the building height to 16-storeys (58.4 m, including the mechanical penthouse), resulting in increased residential gross floor area, and modified setbacks. There will be a total of 32 vehicular parking spaces, including three obstructed resident parking spaces. There will be a total of 150 purpose-built rental residential dwelling units on this lot. A related Site Plan Control application (File Number 21 227303 STE 13 SA) is currently under review. This application is necessitated to further increase the building height (14-storeys and 51.65 m), and residential gross floor area approved in Minor Variance Decision A0395/24TEY.

      401 DUNDAS ST E · Nov 25, 2026 · 212 m away
    • Zoning review

      Not Started

      405 PARLIAMENT ST · Nov 23, 2026 · 296 m away
    • Building permit

      REVISION-01Propose to relocate washer/dryer from ground floor to second-floor mechanical room, convert existing ground-floor enclosure into a washroom, and add a capped plumbing rough-in for a future kitchenette sink.

      29 OAK ST · Oct 28, 2026 · 112 m away
    • Zoning review

      Notice Sent

      20 REGENT ST · Oct 27, 2026 · 234 m away
    • Building permit

      Basement underpinning

      321 ONTARIO ST · Oct 22, 2026 · 270 m away
    • Zoning review

      Closed

      234 PARLIAMENT ST · Oct 8, 2026 · 271 m away
    • Building permit

      Proposed Fire Damage Restoration - BLD & HVA - To restore the unit to pre-loss conditions, complete removal and replacement of the unit interior finishes will be required. Selective removal and replacement of the fire damaged floor joists shall be conducted. Following the reinstallation of the floor joists, the jack posts must be installed to the underside of the roof joists.

      401 PARLIAMENT ST · Sep 28, 2026 · 278 m away
    • Building permit

      1 wall sign**1 OAK DENTAL**

      1 OAK ST · Sep 23, 2026 · 103 m away
    • Building permit

      Proposed Interior Alterations Bank - see 26 178115 BLD 00 BA

      365 PARLIAMENT ST · Sep 11, 2026 · 151 m away
    • Building permit

      Revisions for sign permit: Signs 2 & 4 only***BMO***

      365 PARLIAMENT ST · Sep 10, 2026 · 151 m away

    Neighbourhood: Regent Park

    About the area around the lot, not the lot itself.

    Nearest station
    TMU Station21 min walk
    Nearest TTC stop
    Dundas St East at Parliament St1 min walk
    Nearest cycling route
    Dundas St ECycle Track, 3 min walk
    Nearest traffic count
    18,060 vehicles in 14 hDundas St E / Parliament St, 70 m away, Oct 15, 2025
    Serious collisions within 500 m
    102021–2026, killed or seriously injured: 2 fatal, 7 with pedestrians, 1 with cyclists
    Parks
    Oak Street Parkette2 min walk
    Regent Park3 min walk
    Anniversary Park5 min walk

    Schools within 1 km

    • LORD DUFFERIN JR & SR PUBLIC SCHOOL English Public 3 min walk
    • NELSON MANDELA PARK PUBLIC SCHOOL English Public 7 min walk
    • SPRUCECOURT JR PUBLIC SCHOOL English Public 9 min walk
    • LIBERTY PREP SCHOOL Private 9 min walk
    • ST PAUL CATHOLIC ELEMENTARY SCHOOL English Separate 9 min walk
    • ECOLE ELEMENTAIRE GABRIELLE ROY French Public 11 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureRegent ParkMedian neighbourhood
    Median household income (2020)$65,500$84,500
    Households that own their home30%54%
    Population (2021)12,75016,813
    Homes built in 1960 or before13%29%
    Homes needing major repairs5%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleRegent ParkCity median
    Assault947.8636.3
    Robbery83.569.5
    Shootings610.5
    Auto theft95.4192.6
    Theft over $5,00011.946.1
    Break and enter166.9172.8
    Theft from vehicles125.2188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.