HousePrecheckCheck an address

322 Yonge StToronto · zoning, lot size and permit records

Also 10 Edward St, 324 Yonge St, 4 Edward St, 6 Edward St

Commercial residential · CR 4.0 (c4.0; r1.5) SS1 (x2553)≈ 30.3 × 38.8 m688 m²on Yonge Stcorner, also on Edward St

Not a home

A commercial or mixed-use building

5 different civic addresses share this parcel, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelStill open in the City's records: 22 212741 (Proposal for interior alterations to return the ground & 2nd floor levels of this exist..., 2023, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 22 development applications open within 300 m, up to 85 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • 2 open orders or by-law investigations at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 26 260240 PRS 00 IV (Order Issued Property Standards: Front: The exterior columns and their components are n..., 2025, status Order Issued); 25 242290 PRS 00 IR (Property Standards, 2025, status Order Issued).
  • Major Transit Station Area: CollegeThe City plans more homes around the station: good for transit, and more building over time.
N10 m
≈ 30.3 m frontage≈ 38.8 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 open orders or by-law investigations

    Needs a closer look

    Not resolved in the City's records: 26 260240 PRS 00 IV (Order Issued Property Standards: Front: The exterior columns and their components are n..., 2025, status Order Issued); 25 242290 PRS 00 IR (Property Standards, 2025, status Order Issued).

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Building permit open since 2023

    Needs a closer look

    Still open in the City's records: 22 212741 (Proposal for interior alterations to return the ground & 2nd floor levels of this exist..., 2023, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 22 development applications open within 300 m

    Good to know

    22 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 85 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

38 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 142052 GRA 00 IRClosed

    Graffiti

    Apr 11, 2026 · 322 YONGE ST
  • By-law investigation26 260240 PRS 00 IVOrder Issued

    Order Issued Property Standards: Front: The exterior columns and their components are not being maintained in good repair.

    Oct 20, 2025 · 322 YONGE ST
  • By-law investigation25 242290 PRS 00 IROrder Issued

    Property Standards

    Oct 20, 2025 · 322 YONGE ST
  • By-law investigation25 219129 GRA 00 IRClosed

    Graffiti

    Sep 2, 2025 · 322 YONGE ST
  • Building permit25 107436Closed

    A proposal to erect and display one third party electronic roof sign, illuminated and displaying electronic static copy. The sign contains two sign paces perpendicular to eachother.

    Apr 7, 2025 · 322 YONGE ST
  • Building permit22 229880Closed

    Revision 01. Proposed interior alterations for new retail store "Healthy Planet"

    Jun 5, 2024 · 322 YONGE ST
  • Building permit24 115389Closed

    2 New non-illuminated first party window graphics for "Healthy Planet". Approved variance 23-228775.Dimensions:3.1m L x 26.09 W at a height of 8.10m, on the second storey.1.2m L x 6.33m W at a height of 1.56m, on the first storey.

    Feb 22, 2024 · 322 YONGE ST
  • Zoning review23 228775 ZSVClosed
    Nov 23, 2023 · 322 YONGE ST
Show 30 older records
  • Zoning review23 215148 LTOClosed
    Oct 17, 2023 · 322 YONGE ST
  • Building permit23 195862Closed

    Application for a permit to erect and display two wall signs and two projecting signs, all illuminated.*****HEALTHY PLANET*****

    Sep 25, 2023 · 322 YONGE ST
  • Zoning review23 199040 ZPRClosed
    Sep 7, 2023 · 322 YONGE ST
  • Zoning review23 193680 ZPRCancelled
    Aug 25, 2023 · 322 YONGE ST
  • Building permit22 212741Inspection

    Proposal for interior alterations to return the ground & 2nd floor levels of this existing 2-storey unit to base building condition. Work includes demolition of existing walls, washrooms, in-suite stairs b/w floors, etc. Open to below areas are to be infilled at occupancy permit. Work also includes demolish demising wall of existing vacant tenant unit on the gf level to expand this existing unit. Future Retail Store tenant - 'Healthy Planet'. [Occupancy permit already approved - 22 229880 BLD 00 BA]

    Feb 6, 2023 · 322 YONGE ST
  • Building permit17 132378Closed

    In conjunction with a two storey building on the premises, proposal to erect and display one wall sign located on the first and second storey of the south elevation and one projecting sign located on the first storey south elevation, both displaying static copy and illuminated. The proposed wall sign is 1.52 metres vertically by 4.49 metres horizontally at a height of 4.85 metres above grade. The proposed projecting sign is 0.32 metres vertically by 0.76 metres horizontally at a height of 3.13 metres above grade.**MI'HITO**

    Oct 4, 2021 · 322 YONGE ST
  • Zoning review19 263395 ZBAClosed
    Dec 19, 2019 · 322 YONGE ST
  • Zoning review19 260170 ZSVClosed
    Dec 11, 2019 · 322 YONGE ST
  • Building permit16 238902Closed

    In conjunction with a two storey building on the premises, proposal to erect and display one illuminated wall sign displaying static copy located on the first storey south elevation. The proposed sign is 1.34 metres vertically by 1.11 metres horizontally at a height of 4.29 metres above grade.**Phoenix Cafe**

    May 10, 2017 · 322 YONGE ST
  • Building permit17 119204Closed

    HVAC - interior alterations to existing take out -partitions, plumbing, hvac

    Apr 13, 2017 · 322 YONGE ST
  • Zoning review17 127999 ZSVClosed
    Mar 13, 2017 · 322 YONGE ST
  • Building permit13 170742Closed

    Proposal for interior alterations to convert existing internet cafe to a "roll play" cafe on the second floor of existing mixed use building (139.4m2).

    May 29, 2013 · 322 YONGE ST
  • Building permit11 326742Closed

    Fire alarm upgrade on ground floor and 2nd floor in connection to BLD 11 204405,

    Jan 4, 2012 · 322 YONGE ST
  • Building permit11 287926Closed

    To erect and display four wall signs, two externally illuminated and two non-illuminated, all displaying satic copy in conjunction with a bakery. **Panera Bread**

    Nov 18, 2011 · 322 YONGE ST
  • Building permit11 204405Closed

    Plumbing - permit for interior alterations to convert existing retail space to restaurant greater than 30 seats - Panera Bread Canada ULC. - PLEASE NOTE THAT APPLICATION IS COMPLETE AS THERE IS A ZZC APPLICATION ON FILE. For plans see HVAC file

    Aug 24, 2011 · 322 YONGE ST
  • Zoning review11 138194 ZZCClosed
    Mar 4, 2011 · 322 YONGE ST
  • Zoning review05 128168 LTOClosed
    May 2, 2005 · 322 YONGE ST
  • Zoning review05 126699 ZSVClosed
    Apr 26, 2005 · 322 YONGE ST
  • Zoning review05 123790 ZPRClosed
    Apr 15, 2005 · 322 YONGE ST
  • Building permit02 146220Closed

    construct encroaching canopy on front elevation. (yonge st).

    Dec 2, 2002 · 322 YONGE ST
  • Zoning review02 177948 LTOClosed
    Oct 2, 2002 · 322 YONGE ST
  • Building permit02 116591Closed

    Alter storefront & make interior alters to ground floor and 2nd floor for retail use (existing) clothing store. tenant: Levis #401 NOTE: Signs applied for on separate permit application.

    Jun 11, 2002 · 322 YONGE ST
  • Zoning review95 025577 LTOClosed
    Aug 25, 1995 · 322 YONGE ST
  • Zoning review93 025105 LTOClosed
    May 17, 1993 · 324 YONGE ST
  • Building permit93 013487Closed

    ALTER WASHROOM'S EXHAUST, AS APPROVED IN P#339072 BY PROVIDING NEW FAN & DUCTWORK. SEE BUILDING PERMIT 339072 COST INCL IN 339072 EDC

    Mar 4, 1993 · 322 YONGE ST
  • Building permit92 020509Closed

    INSTALL HVAC ON PORTION OF 1ST FLOOR. TENANT: A & W RESTAURANT SEE 339072 FOR PLANS AND COST.

    Aug 20, 1992 · 322 YONGE ST
  • Zoning review87 029926 LTOClosed
    Mar 18, 1987 · 10 EDWARD ST
  • Zoning review86 028583 LTOClosed
    Dec 8, 1986 · 322 YONGE ST
  • Zoning review86 028259 LTOClosed
    Jul 15, 1986 · 324 YONGE ST
  • Zoning review83 026164 LTOClosed
    Aug 8, 1983 · 10 EDWARD ST

Check before you build

  • Site-specific exception 900.11.10(2553)

    Needs a closer look

    10 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2553)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Section 12(1) 334 of former City of Toronto By-law 438-86

  2. Older by-law B

    Section 12(1) 335 of former City of Toronto By-law 438-86

  3. Older by-law C

    Section 12(1) 397 of former City of Toronto By-law 438-86

  4. Older by-law D

    Section 12(1) 431 of former City of Toronto By-law 438-86

  5. Older by-law E

    Section 12(2) 132 of former City of Toronto By-law 438-86

  6. Older by-law F

    Section 12(2) 256 of former City of Toronto By-law 438-86

  7. Older by-law G

    Section 12(2) 258 of former City of Toronto By-law 438-86

  8. Older by-law H

    Section 12(2) 260 of former City of Toronto By-law 438-86

  9. Older by-law I

    Section 12(2) 316 of former City of Toronto By-law 438-86

  10. Older by-law J

    Former City of Toronto by-law 97-0194.

By-law 569-2013, Chapter 900

Lot facts

Area
688 m²
Frontage
30.3 mestimated, irregular lot
Depth
38.8 mestimated, irregular lot
Street
Yonge St
Corner lot
Yes, also on Edward St38.8 m along it
Public lane
None
House footprint
688 m²roof up to 43.2 m
Back yard
0 mhouse to rear lot line
Side yards
0 m and 0 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
1house, garage, sheds
Max height
20 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Site and Area Specific Policy 174. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Major Transit Station Area: College. The lot is inside the College Major Transit Station Area approved by the Province (Site and Area Specific Policy 603). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Priority retail street: Yonge Street. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 4.0 (c4.0; r1.5) SS1 (x2553) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
  • 4 City trees in front of this lot. The City's street tree inventory lists 4 trees at this address: honey locust (27 cm), honey locust (26 cm), honey locust (25 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
93%13 of 14 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
32

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 14 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit a new eating establishment with karaoke rooms on the second storey (with an increased total floor area), and an eating establishment on the ground floor with washrooms and storage located in the basement, within the existing two-storey commercial building.

    332 YONGE ST · Oct 14, 2026 · 27 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 588-2025) for a new 15-storey mixed-use building (East Block fronting Bay Street), by increasing the podium portions of the building heights, equipment height projections, and reducing the minimum height of the first storey. Also, the new 43-storey mixed-use building (West Block fronting Elizabeth Street) will be reducing the size of one parking space length. This is currently being reviewed under Site Plan Control (File Number 20 25 197844 STE 11 SA). There will be a total of 827 purpose-built rental units on this lot (617 residential dwelling units, and 210 affordable dwelling units).

    130 ELIZABETH ST · Jan 14, 2026 · 365 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1017-2022), for the 53-storey mixed-use building, by reducing the non-residential space, and the number of short-term bicycle parking spaces required on-site. There will be a total of 591 residential dwelling units on this site. This is currently under the review of Site Plan Control (File No. 21 206338 STE 13 SA).

    241 CHURCH ST · Jul 30, 2025 · 378 m away
  • Minor varianceApproved

    To alter the existing 15-storey apartment building by constructing a garbage storage enclosure (to be located on the upper-level of the underground parking garage), which will be the cause for a reduction in two vehicular parking spaces.

    145 MUTUAL ST · Feb 26, 2025 · 479 m away
  • Minor varianceApproved

    To permit a place of amusement (arcade) use on this subject lot.

    247 YONGE ST · Jan 8, 2025 · 271 m away

Latest activity nearby

  • Zoning review

    Closed

    335 YONGE ST · Nov 23, 2026 · 58 m away
  • Building permit

    Four wall signs.***INTERNATIONAL BUSINESS UNIVERSITY***

    655 BAY ST · Nov 19, 2026 · 221 m away
  • Building permit

    Proposed an interior alteration

    595 BAY ST · Nov 19, 2026 · 168 m away
  • Building permit

    Proposed interior alterations to replace existing revolving door with security gate.See approved AS permit 26-229850-AS

    686 BAY ST · Nov 17, 2026 · 251 m away
  • Building permit

    Proposed interior alterations to an existing office suite, including demolition and construction of interior partitions, millwork, and associated mechanical, electrical, plumbing, sprinkler, and fire alarm modifications. Suite 401

    595 BAY ST · Nov 9, 2026 · 168 m away
  • Zoning review

    Not Started

    21 DUNDAS SQ · Nov 6, 2026 · 210 m away
  • Building permit

    Installation of a seasonal decorative Christmas wreath (designated structure) attached to the exterior wall of a retail store, Le Maison Simons, for the Christmas season.

    260 YONGE ST · Nov 6, 2026 · 294 m away
  • Building permit

    Proposal to install and update the existing sprinkler system in the washrooms on the 23rd floor.

    1 DUNDAS ST W · Nov 5, 2026 · 135 m away
  • Building permit

    Proposal for interior alterations, fit out for new eating establishment with karaoke rooms on the 2nd floor.

    332 YONGE ST · Nov 5, 2026 · 27 m away
  • Building permit

    1 overhanging structure sign**SIMONS CHRISTMAS WREATH**

    260 YONGE ST · Oct 27, 2026 · 294 m away

Neighbourhood: Yonge-Bay Corridor

About the area around the lot, not the lot itself.

Nearest station
TMU Station2 min walk
Nearest TTC stop
TMU Station - Northbound Platform1 min walk
Nearest cycling route
Bay StBike Lane, 3 min walk
Nearest traffic count
9,346 vehicles in 14 hYonge St / Edward St, 30 m away, Apr 8, 2025
Serious collisions within 500 m
122021–2026, killed or seriously injured: 2 fatal, 9 with pedestrians, 3 with cyclists
Parks
Toronto Metropolitan University Square2 min walk
Trinity Square4 min walk
College Park4 min walk

Schools within 1 km

  • TMU - HEASLIP HOUSE University 3 min walk
  • TORONTO METROPOLITAN UNIVERSITY - ENTR TO BUSINESS SCHOOL LOBBY University 3 min walk
  • TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF IMAGE ARTS University 3 min walk
  • TMU - HEIDELBERG CENTRE SCHOOL OF GRAPHIC COMM'NS MGMT University 4 min walk
  • TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 5 min walk
  • TORONTO METROPOLITAN UNIVERSITY - THEATRE SCHOOL University 5 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureYonge-Bay CorridorMedian neighbourhood
Median household income (2020)$68,500$84,500
Households that own their home32%54%
Population (2021)12,64516,813
Homes built in 1960 or before2%29%
Homes needing major repairs2%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleYonge-Bay CorridorCity median
Assault3361.1636.3
Robbery300.169.5
Homicide125.3
Shootings1210.5
Auto theft162.1192.6
Theft over $5,000210.146.1
Break and enter552.2172.8
Theft from vehicles402.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.