HousePrecheckCheck an address

321 Trudelle StToronto · zoning, lot size and permit records

Also 331 Trudelle St, 341 Trudelle St, 343 Trudelle St, 345 Trudelle St, 347 Trudelle St and 5 more

Residential multiple · RM (au220.0) (x427)≈ 276.9 × 109.1 m18,155 m²on Trudelle St

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 1.8 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 12 231948 (exterior watermain replacement, 2012, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 5 development applications open within 300 m, up to 46 storeysNew buildings may go up around here in the next years. More change nearby than at 91% of Toronto houses.
  • Major Transit Station Area: Eglinton GOThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N50 m
≈ 276.9 m frontage≈ 109.1 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2012

    Needs a closer look

    Still open in the City's records: 12 231948 (exterior watermain replacement, 2012, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 2 by-law investigations closed in the last two years

    Good to know

    Closed files (Zoning): 26 146109 ZON 00 IR (Zoning, 2026); 25 142938 ZON 00 IR (Zoning, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 5 development applications open within 300 m

    Good to know

    5 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 46 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

3 records on file: more than at 81% of Toronto houses (median 0).

  • By-law investigation26 146109 ZON 00 IRClosed

    Zoning

    Apr 17, 2026 · 331 TRUDELLE ST
  • By-law investigation25 142938 ZON 00 IRClosed

    Zoning

    Apr 10, 2025 · 331 TRUDELLE ST
  • Building permit12 231948Inspection

    exterior watermain replacement

    Aug 31, 2012 · 331 TRUDELLE ST

Check before you build

  • Site-specific exception 900.6.10(427)

    Needs a closer look

    9 site-specific rules apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.6.10(427)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The minimum building setback from a lot line that does not abut a street is a distance equal to half the height of the building

  2. Rule B

    The minimum separation between the above ground main walls of two building on a lot is a distance equal to half the combined total height of the two buildings

  3. Rule C

    [Deleted]

  4. Rule D

    The maximum height of the building wall between established grade and the underside of the eaves is 8.0 metres

  5. Rule E

    A building used for the storage of waste is permitted in a yard that abuts a street if: (i) it is a wholly enclosed building ; and (ii) it is located a minimum of 1.5 metres from a lot line that abuts a street

  6. Rule F

    Parking spaces must be provided at a minimum rate of 1.25 for each dwelling unit

  7. Rule G

    Of the required parking spaces : (i) a minimum of 75% must be located below ground or in the residential building ; and (ii) a minimum of 20% must be for visitor use and located at ground level

  8. Rule H

    A below grade parking structures may be permitted in a front yard if it is set back the greater of: (i) a minimum of 3.0 metres; and (ii) a minimum distance equivalent to the vertical distance from the surface of the lowest floor of the structure to the average elevation of grade at the front lot line

  9. Rule I

    A minimum of 45% of the lot area must be used for no other purpose than landscaping .

By-law 569-2013, Chapter 900

Lot facts

Area
18,155 m²
Frontage
276.9 mestimated, irregular lot
Depth
109.1 mestimated, irregular lot
Street
Trudelle St
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
33%
  • Major Transit Station Area: Eglinton GO. The lot is inside the Eglinton GO Major Transit Station Area approved by the Province (Site and Area Specific Policy 625). Source
  • Zone RM (au220.0) (x427) (Residential Multiple Dwelling). Chapter 10, section 10.80 of the by-law. Source
  • 16 City trees in front of this lot. The City's street tree inventory lists 16 trees at this address: linden, littleleaf (32 cm), maple, norway (27 cm), maple, norway (25 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%2 of 2 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
7

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 2 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Proposal for fire alarm upgrade for elevator upgrade.

    130 BELLAMY RD N · Oct 27, 2026 · 271 m away
  • Building permit

    Proposal to convert a lawfully existing carport to an attached garage. Rear & side walls added over time without the benefit of a building permit. Scope of work is limited to adding a front wall (garage door).

    3 GRACE ST · Oct 20, 2026 · 226 m away
  • Building permit

    Propose to repair fire separation, fire protection and exit lighting damaged by fire

    2966-2978 EGLINTON AVE E · Oct 9, 2026 · 74 m away
  • Consent (lot split)Approved

    To obtain consent to sever the existing lot into three residential lots. A previously approved development of a 39-storey, 35-storey building and 10-storey building will be constructed. The existing 12-storey apartment building will remain. Cross reference Zoning By-law Amendment File #24 126134 ESC 21 OZ.

    123 BELLAMY RD N · Oct 7, 2026 · 154 m away
  • Zoning review

    Closed

    126 BELLAMY RD N · Feb 26, 2026 · 198 m away
  • Zoning review

    Closed

    126 BELLAMY RD N · Dec 11, 2025 · 198 m away
  • Zoning review

    Cancelled

    126 BELLAMY RD N · Oct 23, 2025 · 198 m away
  • Zoning review

    Cancelled

    126 BELLAMY RD N · Oct 17, 2025 · 198 m away
  • Building permit

    construct one storey rear addition to auto repair garage

    2937 EGLINTON AVE E · Sep 10, 2025 · 227 m away
  • Zoning review

    Closed

    126 BELLAMY RD N · Jun 16, 2025 · 198 m away

Neighbourhood: Eglinton East

About the area around the lot, not the lot itself.

Nearest station
Eglinton GO Station2 min walk
Nearest TTC stop
Bellamy Rd North at Eglinton Ave East - Eglinton GO Station2 min walk
Nearest cycling route
McCowan District Park TrlMulti-Use Trail, 5 min walk
Nearest traffic count
6,081 vehicles in 8 hCedar Brae Blvd / Bellamy Rd N / Trudelle St, 100 m away, Jul 18, 2023
Serious collisions within 500 m
22021–2026, killed or seriously injured: 2 fatal, 1 with pedestrians, 0 with cyclists
Parks
Colonial Park4 min walk
McCowan District Park4 min walk
Bellamy Park6 min walk

Schools within 1 km

  • UMC HIGH SCHOOL Private 9 min walk
  • JOHN MCCRAE SR PUBLIC SCHOOL English Public 10 min walk
  • PERE PHILIPE LAMARCHE CATHOLIC SECONDARY SCHOOL French Separate 10 min walk
  • MASON ROAD JR PUBLIC SCHOOL English Public 11 min walk
  • CEDARBROOK JR PUBLIC SCHOOL English Public 12 min walk
  • ST NICHOLAS CATHOLIC ELEMENTARY SCHOOL English Separate 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureEglinton EastMedian neighbourhood
Median household income (2020)$73,500$84,500
Households that own their home47%54%
Population (2021)22,53516,813
Homes built in 1960 or before23%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleEglinton EastCity median
Assault825.8636.3
Robbery65.669.5
Shootings15.410.5
Auto theft270.1192.6
Theft over $5,00061.746.1
Break and enter150.5172.8
Theft from vehicles559.5188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.