Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
TRCA regulated area (100% of lot)
Needs a closer lookPart of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.
What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.
How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details
Ontario Regulation 41/24, TRCA Regulation LimitBuilding permit open since 2018
Needs a closer lookStill open in the City's records: 18 164281 (Proposal for interior alterations to unit 304 of existing apartment building, 2018, status Inspection).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Natural Heritage System (100% of lot)
Good to knowPart of the lot is in the Natural Heritage System shown on Official Plan Map 9.
What it means. New buildings or additions in that part need a natural heritage impact study.
How to confirm. City Planning confirms the policies that apply. Details
City of Toronto Official Plan, Map 93 by-law investigations closed in the last two years
Good to knowClosed files (Zoning): 25 257647 ZON 00 IR (Zoning, 2025); 25 253588 ZON 00 IR (Zoning, 2025); 25 157134 ZON 00 IR (Zoning, 2025).
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations3 development applications open within 300 m
Good to know3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 34 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
6 records on file: more than at 95% of Toronto houses (median 0).
- By-law investigation25 257647 ZON 00 IRClosed
Zoning
Nov 24, 2025 · 32 TROLLEY CRES - By-law investigation25 253588 ZON 00 IRClosed
Zoning
Nov 13, 2025 · 32 TROLLEY CRES - By-law investigation25 157134 ZON 00 IRClosed
Zoning
May 9, 2025 · 32 TROLLEY CRES - Building permit18 164281Inspection
Proposal for interior alterations to unit 304 of existing apartment building.
Jun 27, 2018 · 32 TROLLEY CRES - Building permit17 269901Closed
Proposed interior alterations to an existing condo unit, penthouse unit 10.
Jan 23, 2018 · 32 TROLLEY CRES - Development application11 309775 STE 28 SAClosed
Phase 2 of the River City Development for a 12 storey building with a total gross floor area of 23,345m2 comprising; 249 residential units, 246 parking spaces (for Phase 1 and 2) and 250 bicycle parking spaces. Committee of Adjustment (A0887/11TEY) variances were approved in 2011 to increase the floor area of the residential penthouse and the height of the building. In addition, Council approved a Part Lot Control Exemption application (12-262830 STE 28 PL) in February 2013 for this phase of development.
Nov 15, 2011 · 32 TROLLEY CRES
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 2,478 m²
- Frontage
- 83.3 m
- Depth
- 30.6 m
- Street
- Trolley Cres
- Corner lot
- No
- Public lane
- None
- Max height
- —
- Max lot coverage
- —
Around this lot
- Minor variances approved
- 100%10 of 10 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 2
- Development applications
- 13
Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 10 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To construct a new rear one-storey detached ancillary building (one-car garage) abutting the laneway.
60 WASCANA AVE · Oct 14, 2026 · 250 m away - Minor varianceRefused
To permit a vehicle dealership use and vehicle service use (Downtown Automatic Group Cadillac) within the existing ground floor commercial unit of the mixed-use building.
45 BASEBALL PL · May 13, 2026 · 337 m away - Minor varianceApproved
To construct a new rooftop stair enclosure (vestibule and storage area) for Unit 701, within this existing seven-storey detached building. The existing private rooftop elevator enclosure will be demolished.
90 SUMACH ST · Jan 8, 2025 · 421 m away - Minor varianceApproved
To alter the development standards, as approved under Site Specific Zoning By-law 122-2023 (OLT), by increasing the building height (from a 34-storey residential building to a 37-storey residential building, inclusive of seven rental replacement units), and constructing a four-and-one-half levels of an underground parking garage.
83 RIVER ST · Aug 14, 2024 · 429 m away - Minor varianceRefused
To alter the existing seven-storey apartment building by constructing a new third storey rooftop deck (for Unit 319), to be located on the roof above the existing parking garage, on the north side of the building. There will be a partition fence on the rooftop deck.
90 SUMACH ST · Aug 14, 2024 · 421 m away
Latest activity nearby
- Zoning review
Not Started
9 DAVIES AVE · Nov 23, 2026 · 251 m away - Building permit
PROPOSED NEW DETACHED GARAGE
60 WASCANA AVE · Nov 23, 2026 · 250 m away - Building permit
PROPOSED ALTERATIONS TO SECOND FLOOR
491 QUEEN ST E · Nov 17, 2026 · 281 m away - Minor varianceApproved
To construct a new rear one-storey detached ancillary building (one-car garage) abutting the laneway.
60 WASCANA AVE · Oct 14, 2026 · 250 m away - Zoning review
Notice Sent
534 QUEEN ST E · Oct 13, 2026 · 264 m away - Building permit
HVAC permit required to close out Plumbing Permit.Related 26-155352 BLD 00 BA
632 QUEEN ST E · Sep 25, 2026 · 259 m away - Building permit
Interior alterations to an existing dental office.
510 KING ST E · Jun 19, 2026 · 200 m away - Zoning review
Closed
7 ASHBY PL · May 25, 2026 · 250 m away - Building permit
REV01: Proposed revision to increase the occupant load from 17 to 19 personsProposal to increase the occupant load of the existing Veterinary Clinic - Interior alts for new washroom only.
632 QUEEN ST E · May 19, 2026 · 259 m away - Zoning review
Closed
60 WASCANA AVE · Apr 7, 2026 · 250 m away
Neighbourhood: Moss Park
About the area around the lot, not the lot itself.
- Nearest station
- Queen Station33 min walk
- Nearest TTC stop
- King St East at River St2 min walk
- Nearest cycling route
- Lower River StCycle Track, 1 min walk
- Nearest traffic count
- 2,421 vehicles in 14 hTrolley Cres / Lower River St (South), 80 m away, Aug 18, 2026
- Serious collisions within 500 m
- 32021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 1 with cyclists
- Parks
- Corktown Common1 min walk
- Underpass Park1 min walk
- King/Queen Triangle2 min walk
Schools within 1 km
- INGLENOOK COMMUNITY SCHOOL English Public 8 min walk
- NELSON MANDELA PARK PUBLIC SCHOOL English Public 8 min walk
- ST PAUL CATHOLIC ELEMENTARY SCHOOL English Separate 9 min walk
- GEORGE BROWN COLLEGE - YOUNG CENTRE FOR THE PERFORMING ARTS College 11 min walk
- QUEEN ALEXANDRA MDL SCHOOL English Public 11 min walk
- SEED ALTERNATIVE SCHOOL English Public 12 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Moss Park | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $65,000 | $84,500 |
| Households that own their home | 35% | 54% |
| Population (2021) | 21,490 | 16,813 |
| Homes built in 1960 or before | 17% | 29% |
| Homes needing major repairs | 8% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Moss Park | City median |
|---|---|---|
| Assault | 2226.8 | 636.3 |
| Robbery | 166.6 | 69.5 |
| Homicide | 3.4 | 5.3 |
| Shootings | 3.4 | 10.5 |
| Auto theft | 81.6 | 192.6 |
| Theft over $5,000 | 64.6 | 46.1 |
| Break and enter | 350.2 | 172.8 |
| Theft from vehicles | 275.4 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.