HousePrecheckCheck an address

32 Trolley CresToronto · zoning, lot size and permit records

Also 20 Trolley Cres, 22 Trolley Cres, 24 Trolley Cres, 26 Trolley Cres, 28 Trolley Cres and 4 more

83.3 × 30.6 m2,478 m²on Trolley Cres

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.2 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 18 164281 (Proposal for interior alterations to unit 304 of existing apartment building, 2018, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 3 development applications open within 300 m, up to 34 storeysNew buildings may go up around here in the next years. More change nearby than at 97% of Toronto houses.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
83.3 m frontage30.6 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (100% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Building permit open since 2018

    Needs a closer look

    Still open in the City's records: 18 164281 (Proposal for interior alterations to unit 304 of existing apartment building, 2018, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Natural Heritage System (100% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 3 by-law investigations closed in the last two years

    Good to know

    Closed files (Zoning): 25 257647 ZON 00 IR (Zoning, 2025); 25 253588 ZON 00 IR (Zoning, 2025); 25 157134 ZON 00 IR (Zoning, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 34 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

6 records on file: more than at 95% of Toronto houses (median 0).

  • By-law investigation25 257647 ZON 00 IRClosed

    Zoning

    Nov 24, 2025 · 32 TROLLEY CRES
  • By-law investigation25 253588 ZON 00 IRClosed

    Zoning

    Nov 13, 2025 · 32 TROLLEY CRES
  • By-law investigation25 157134 ZON 00 IRClosed

    Zoning

    May 9, 2025 · 32 TROLLEY CRES
  • Building permit18 164281Inspection

    Proposal for interior alterations to unit 304 of existing apartment building.

    Jun 27, 2018 · 32 TROLLEY CRES
  • Building permit17 269901Closed

    Proposed interior alterations to an existing condo unit, penthouse unit 10.

    Jan 23, 2018 · 32 TROLLEY CRES
  • Development application11 309775 STE 28 SAClosed

    Phase 2 of the River City Development for a 12 storey building with a total gross floor area of 23,345m2 comprising; 249 residential units, 246 parking spaces (for Phase 1 and 2) and 250 bicycle parking spaces. Committee of Adjustment (A0887/11TEY) variances were approved in 2011 to increase the floor area of the residential penthouse and the height of the building. In addition, Council approved a Part Lot Control Exemption application (12-262830 STE 28 PL) in February 2013 for this phase of development.

    Nov 15, 2011 · 32 TROLLEY CRES

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
2,478 m²
Frontage
83.3 m
Depth
30.6 m
Street
Trolley Cres
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    100%10 of 10 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    2
    Development applications
    13

    Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 10 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To construct a new rear one-storey detached ancillary building (one-car garage) abutting the laneway.

      60 WASCANA AVE · Oct 14, 2026 · 250 m away
    • Minor varianceRefused

      To permit a vehicle dealership use and vehicle service use (Downtown Automatic Group Cadillac) within the existing ground floor commercial unit of the mixed-use building.

      45 BASEBALL PL · May 13, 2026 · 337 m away
    • Minor varianceApproved

      To construct a new rooftop stair enclosure (vestibule and storage area) for Unit 701, within this existing seven-storey detached building. The existing private rooftop elevator enclosure will be demolished.

      90 SUMACH ST · Jan 8, 2025 · 421 m away
    • Minor varianceApproved

      To alter the development standards, as approved under Site Specific Zoning By-law 122-2023 (OLT), by increasing the building height (from a 34-storey residential building to a 37-storey residential building, inclusive of seven rental replacement units), and constructing a four-and-one-half levels of an underground parking garage.

      83 RIVER ST · Aug 14, 2024 · 429 m away
    • Minor varianceRefused

      To alter the existing seven-storey apartment building by constructing a new third storey rooftop deck (for Unit 319), to be located on the roof above the existing parking garage, on the north side of the building. There will be a partition fence on the rooftop deck.

      90 SUMACH ST · Aug 14, 2024 · 421 m away

    Latest activity nearby

    • Zoning review

      Not Started

      9 DAVIES AVE · Nov 23, 2026 · 251 m away
    • Building permit

      PROPOSED NEW DETACHED GARAGE

      60 WASCANA AVE · Nov 23, 2026 · 250 m away
    • Building permit

      PROPOSED ALTERATIONS TO SECOND FLOOR

      491 QUEEN ST E · Nov 17, 2026 · 281 m away
    • Minor varianceApproved

      To construct a new rear one-storey detached ancillary building (one-car garage) abutting the laneway.

      60 WASCANA AVE · Oct 14, 2026 · 250 m away
    • Zoning review

      Notice Sent

      534 QUEEN ST E · Oct 13, 2026 · 264 m away
    • Building permit

      HVAC permit required to close out Plumbing Permit.Related 26-155352 BLD 00 BA

      632 QUEEN ST E · Sep 25, 2026 · 259 m away
    • Building permit

      Interior alterations to an existing dental office.

      510 KING ST E · Jun 19, 2026 · 200 m away
    • Zoning review

      Closed

      7 ASHBY PL · May 25, 2026 · 250 m away
    • Building permit

      REV01: Proposed revision to increase the occupant load from 17 to 19 personsProposal to increase the occupant load of the existing Veterinary Clinic - Interior alts for new washroom only.

      632 QUEEN ST E · May 19, 2026 · 259 m away
    • Zoning review

      Closed

      60 WASCANA AVE · Apr 7, 2026 · 250 m away

    Neighbourhood: Moss Park

    About the area around the lot, not the lot itself.

    Nearest station
    Queen Station33 min walk
    Nearest TTC stop
    King St East at River St2 min walk
    Nearest cycling route
    Lower River StCycle Track, 1 min walk
    Nearest traffic count
    2,421 vehicles in 14 hTrolley Cres / Lower River St (South), 80 m away, Aug 18, 2026
    Serious collisions within 500 m
    32021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 1 with cyclists
    Parks
    Corktown Common1 min walk
    Underpass Park1 min walk
    King/Queen Triangle2 min walk

    Schools within 1 km

    • INGLENOOK COMMUNITY SCHOOL English Public 8 min walk
    • NELSON MANDELA PARK PUBLIC SCHOOL English Public 8 min walk
    • ST PAUL CATHOLIC ELEMENTARY SCHOOL English Separate 9 min walk
    • GEORGE BROWN COLLEGE - YOUNG CENTRE FOR THE PERFORMING ARTS College 11 min walk
    • QUEEN ALEXANDRA MDL SCHOOL English Public 11 min walk
    • SEED ALTERNATIVE SCHOOL English Public 12 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureMoss ParkMedian neighbourhood
    Median household income (2020)$65,000$84,500
    Households that own their home35%54%
    Population (2021)21,49016,813
    Homes built in 1960 or before17%29%
    Homes needing major repairs8%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleMoss ParkCity median
    Assault2226.8636.3
    Robbery166.669.5
    Homicide3.45.3
    Shootings3.410.5
    Auto theft81.6192.6
    Theft over $5,00064.646.1
    Break and enter350.2172.8
    Theft from vehicles275.4188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.