HousePrecheckCheck an address

32 Powerhouse StToronto · zoning, lot size and permit records

≈ 1.3 × 25.3 m20 m²on Foundry Avecorner, also on Powerhouse St

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • Permits or applications open on this parcelStill open in the City's records: 23 141393 (Deferred Fees from folder 21 141393 (RSN-4909655) ZoningProcess RSN 70901729, 2023, status Open); 23 141364 (Deferred Fees from folder 21 141364 (RSN-4909621) ZoningProcess RSN 70901717, 2023, status Open); 22 141223 (Deferred Fees from folder 21 141223 (RSN-4909438) ZoningProcess RSN 70901661, 2022, status Open); and 4 more. Larger work can mean noise and trucks next door; read what each one is for.
N5 m
≈ 1.3 m frontage≈ 25.3 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 7 building permits open, the oldest since 2013

    Needs a closer look

    Still open in the City's records: 23 141393 (Deferred Fees from folder 21 141393 (RSN-4909655) ZoningProcess RSN 70901729, 2023, status Open); 23 141364 (Deferred Fees from folder 21 141364 (RSN-4909621) ZoningProcess RSN 70901717, 2023, status Open); 22 141223 (Deferred Fees from folder 21 141223 (RSN-4909438) ZoningProcess RSN 70901661, 2022, status Open); and 4 more.

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

40 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit21 141246Closed

    REV 02: Stair F in Building C extended to mechanical penthouse level in order to provide second means of egress as per 2012 OBC 3.3.1.3.(6) requirements.Rev 01 - Proposal to change some wall assemblies above grade. Change in layout.HVAC - Proposal for a 12 Storey tower (Building C )This is a part of Phase 6 of Davenport Village which including 36 Storey Tower (Building A)+29 Storey Tower (Building B) on a 7 Storey Podium, 12 Storey Tower(Building C), 1 Storey Daycare (Building F), 2 -4 Storey Stack Townhouses (Building D and E).

    Jun 1, 2026 · 980 LANSDOWNE AVE
  • Building permit21 141223Closed

    REV 02: Stair E in Building B extended to mechanical penthouse level in order to provide second means of egress as per 2012 OBC 3.3.1.3.(6) requirements.Rev 01 - Proposal to change some wall assemblies above grade. Change in layout.HVAC - Proposal for 29 Storey tower (Building B )on a 7 Storey Podium. This is a part of Phase 6 of Davenport Village which including 36 Storey Tower (Building A)+29 Storey Tower (Building B) on a 7 Storey Podium, 12 Storey Tower(Building C), 1 Storey Daycare (Building F), 2 -4 Storey Stack Townhouses (Building D and E).

    May 27, 2026 · 980 LANSDOWNE AVE
  • Building permit21 140773Closed

    Rev 01 - Proposal to change some wall assemblies above grade. Change in layout.HVAC - Proposal for 36 Storey tower (Building A )on a 7 Storey Podium and 2 level underground parking garage. This is a part of Phase 6 of Davenport Village which including 36 Storey Tower (Building A)+29 Storey Tower (Building B) on a 7 Storey Podium, 12 Storey Tower(Building C), 1 Storey Daycare (Building F), 2 -4 Storey Stack Townhouses (Building D and E).

    Feb 24, 2026 · 980 LANSDOWNE AVE
  • Building permit25 242964Approved

    This proposal relates to the standpipe system in the above-ground components of the Davenport Village Phase 6 residential development at 980 Lansdownw Ave. Deletion of hose cabinets and installation of standpipe risers and 65mm hose connections within exit stair shafts, provision of additional 65mm hose connections outside of exit enclosures, and absence of a fire hose valve in the garabge room in the north end of the ground floor of building C.

    Oct 21, 2025 · 980 LANSDOWNE AVE
  • Building permit25 242784Approved

    This proposal relates to the standpipe system in the above-ground components of the Davenport Village Phase 6 residential development at 980 Lansdownw Ave. Deletion of hose cabinets and installation of standpipe risers and 65mm hose connections within exit stair shafts, provision of additional 65mm hose connections outside of exit enclosures, and absence of a fire hose valve in the garabge room in the north end of the ground floor of building C.

    Oct 21, 2025 · 980 LANSDOWNE AVE
  • Building permit21 141393Closednew building

    Proposal for 36 Units 3 Storey Stack Townhouses (Building E )This is a part of Phase 6 of Davenport Village which including 36 Storey Tower (Building A)+29 Storey Tower (Building B) on a 7 Storey Podium, 12 Storey Tower(Building C), 1 Storey Daycare (Building F), 2 -4 Storey Stack Townhouses (Building D and E).

    Jul 8, 2025 · 980 LANSDOWNE AVE
  • Building permit21 141364Closednew building

    Proposal for 24 Units 3 Storey Stack Townhouses (Building D )This is a part of Phase 6 of Davenport Village which including 36 Storey Tower (Building A)+29 Storey Tower (Building B) on a 7 Storey Podium, 12 Storey Tower(Building C), 1 Storey Daycare (Building F), 2 -4 Storey Stack Townhouses (Building D and E).

    Jun 27, 2025 · 980 LANSDOWNE AVE
  • Building permit21 141270Closednew building

    Proposal for a 1 Storey Daycare Center (Building F )This is a part of Phase 6 of Davenport Village which including 36 Storey Tower (Building A)+29 Storey Tower (Building B) on a 7 Storey Podium, 12 Storey Tower(Building C), 1 Storey Daycare (Building F), 2 -4 Storey Stack Townhouses (Building D and E).

    Jun 25, 2025 · 980 LANSDOWNE AVE
Show 32 older records
  • Building permit23 231031Closed

    This Folder was closed by the system. PP child folders cannot be created using the 'Create Child' button.The n_ParentRSN was: 4909655

    Nov 29, 2023 · 980 LANSDOWNE AVE
  • Building permit23 141393Open

    Deferred Fees from folder 21 141393 (RSN-4909655) ZoningProcess RSN 70901729

    Nov 7, 2023 · 980 LANSDOWNE AVE
  • Building permit23 141364Open

    Deferred Fees from folder 21 141364 (RSN-4909621) ZoningProcess RSN 70901717

    Nov 7, 2023 · 980 LANSDOWNE AVE
  • Building permit22 141223Open

    Deferred Fees from folder 21 141223 (RSN-4909438) ZoningProcess RSN 70901661

    Oct 25, 2022 · 980 LANSDOWNE AVE
  • Zoning review16 165922 PSPClosed
    Mar 31, 2022 · 980 LANSDOWNE AVE
  • Development application20 222554 STE 09 SAClosed

    Site Plan application for a mixed use building. This is a Heritage building.

    Nov 25, 2020 · 32 POWERHOUSE ST · City file
  • Zoning review17 185378 POZClosed
    Nov 13, 2017 · 980 LANSDOWNE AVE
  • Building permit15 268844Closed

    Drain - Proposal to construct parking garage related to 56 new townhouses fronting Powerhouse Rd and Brandon Ave.

    Nov 23, 2016 · 980 LANSDOWNE AVE
  • Zoning review16 233465 PPLClosed
    Oct 11, 2016 · 980 LANSDOWNE AVE
  • Building permit15 270326Inspectionnew building, new house

    Proposal to construct Type B end townhouse unit, as part of 30-unit townhouse block (South Block) fronting Brandon Ave and Lansdowne Ave.

    Jul 7, 2016 · 980 LANSDOWNE AVE
  • Building permit15 268355Inspectionnew building, new house

    Proposal to construct Type B end townhouse unit, as part of 26-unit townhouse block (North Block) fronting Powerhouse Rd and Lansdowne Ave.

    Jul 7, 2016 · 980 LANSDOWNE AVE
  • Building permit15 268642Inspection

    Proposed site services as part of 56-unit townhouse block fronting Powerhouse Rd and Lansdowne Ave.

    Feb 16, 2016 · 980 LANSDOWNE AVE
  • Zoning review15 154754 PRZClosed
    May 14, 2015 · 980 LANSDOWNE AVE
  • Zoning review15 129274 PSPClosed
    Mar 26, 2015 · 980 LANSDOWNE AVE
  • Building permit13 254424Closednew building

    Conditional Permit - To construct a common underground parking garage for 5 Blocks of 88 stacked townhouses for Phase 5 Davenport Village (aka the Brownstones at the Powerhouse to be known as 7, 9, 11, 13, 15 Foundry Avenue)

    May 1, 2014 · 980 LANSDOWNE AVE
  • Building permit13 254372Closednew building

    Conditional Permit - To construct 5 Blocks of 88 stacked townhouses over an underground parking garagePhase 5 of Davenport Village (aka The Brownstones 5 at the Powerhouse to be known as 7, 9, 11, 13, 15 Foundry Avenue). This application is for Block 'E' containing 12 units.

    May 1, 2014 · 980 LANSDOWNE AVE
  • Building permit13 254367Closednew building

    Conditional Permit - To construct 5 Blocks of 88 stacked townhouses over an underground parking garagePhase 5 of Davenport Village (aka The Brownstones 5 at the Powerhouse to be known as 7, 9, 11, 13, 15 Foundry Avenue). This application is for Block 'D' containing 20 units.

    May 1, 2014 · 980 LANSDOWNE AVE
  • Building permit13 254365Closednew building

    Conditional Permit - To construct 5 Blocks of 88 stacked townhouses over an underground parking garagePhase 5 of Davenport Village (aka The Brownstones 5 at the Powerhouse to be known as 7, 9, 11, 13, 15 Foundry Avenue). This application is for Block 'C' containing 24 units.

    May 1, 2014 · 980 LANSDOWNE AVE
  • Building permit13 254344Closednew building

    Conditional Permit - To construct 5 Blocks of 88 stacked townhouses over an underground parking garagePhase 5 of Davenport Village (aka The Brownstones 5 at the Powerhouse to be known as 7, 9, 11, 13, 15 Foundry Avenue). This application is for Block 'B' containing 20 units.

    May 1, 2014 · 980 LANSDOWNE AVE
  • Building permit13 254106Closednew building

    Conditional Permit - To construct 5 blocks of 88 townhouses over a underground grade parking garage Phase 5 of Davenport village (The Brownstones at the Powerhouse aka 7,11,13,15 and 31 Foundry Ave)THIS IS FOR BLOCK 'A' containing 12 units

    May 1, 2014 · 980 LANSDOWNE AVE
  • Zoning review13 257952 PRZClosed
    Oct 29, 2013 · 980 LANSDOWNE AVE
  • Building permit10 165045Closed

    REVISION - Hot water heater for lower units revisedHVAC - to construct 24 new three storey townhouse units BLOCK D

    Aug 2, 2013 · 980 LANSDOWNE AVE
  • Building permit10 165023Revision Issued

    REVSION - Hot water heater for lower units revisedHVAC - to construct 28 new three storey stacked townhouse units BLOCK A

    Aug 2, 2013 · 980 LANSDOWNE AVE
  • Zoning review13 115926 PSPClosed
    Feb 5, 2013 · 980 LANSDOWNE AVE
  • Building permit10 165127Closed

    HVAC - Construct a common garage under 128 stacked townhouse (Block A, B. C.D ,E & F)Partial Occupancy for grid lines 1-9 / A-R granted for vehicle parking only. Conditions apply. See notes.

    Jun 6, 2012 · 980 LANSDOWNE AVE
  • Building permit10 165049Closed

    HVAC - to construct 24 new stacked townhouse units in 2 Blocks: BLOCK E (8 units);BLOCK F (16 units)

    May 23, 2012 · 980 LANSDOWNE AVE
  • Building permit10 165044Closed

    Plumbing - to construct 24 new three storey stacked townhouse unit BLOCK C

    May 23, 2012 · 980 LANSDOWNE AVE
  • Building permit10 165039Closed

    Plumbing - to construct new threey storey 28 stacked townhouse units BLOCK B

    May 23, 2012 · 980 LANSDOWNE AVE
  • Zoning review10 146483 PSPClosed
    Oct 26, 2010 · 980 LANSDOWNE AVE
  • Zoning review10 146473 PRZClosed
    Apr 7, 2010 · 980 LANSDOWNE AVE
  • Zoning review08 217942 PLOClosed
    Oct 31, 2008 · 980 LANSDOWNE AVE
  • Building permit08 117628Closeddemolition

    To demolish a one storey warehouse/office building with a mezzanine (building 24) and to make good existing building presently located adjacent to Building 24

    Oct 28, 2008 · 980 LANSDOWNE AVE

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
20 m²
Frontage
1.3 mestimated, irregular lot
Depth
25.3 mestimated, irregular lot
Street
Foundry Ave
Corner lot
Yes, also on Powerhouse St25.3 m along it
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    93%14 of 15 decisions
    Garden suite permits
    2
    Laneway suite permits
    5
    Multiplex permits
    9
    Development applications
    3

    Within 300 m, last 10 years. 16 suite and multiplex permits: more than at 84% of Toronto houses (median 3). 15 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To construct a new three-storey mixed-use building with three rooftop mezzanines and three rooftop terraces. There will be a total of one commercial unit (located on the first level), and eight residential dwelling units on this lot (two units occupying the basement and first levels, three units occupying the second level, and three units occupying the third level).

      1859 DAVENPORT RD · Jun 3, 2026 · 382 m away
    • Minor varianceApproved

      To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition with a ground floor deck and stairs. The existing rear one-storey addition will be demolished.

      113 LIGHTBOURN AVE · Feb 18, 2026 · 494 m away
    • Minor varianceApproved

      To alter the existing three-storey (7-unit) detached apartment building by constructing one additional residential dwelling unit within the basement. There will be a total of 9 residential dwelling units on this lot (8 units within the main building and one unit within the two-storey detached ancillary building (two-car garage, and one laneway suite). There will be a total of six bicycle parking spaces (4 long-term spaces for the main dwelling, and 2 spaces for the laneway suite), located along the south wall of the ancillary building.

      871 ST CLARENS AVE · Nov 26, 2025 · 219 m away
    • Minor varianceApproved

      To alter the existing three-storey mixed-use building by converting two office units into two residential dwelling units.

      31 POWERHOUSE ST · Oct 15, 2025 · 30 m away
    • Minor varianceApproved

      To construct a new two-storey detached ancillary building (containing a one-car garage on the ground floor and one garden suite on the second storey with the second storey cantilevered on the south side) in the rear yard of the lot. There will be a total of two residential dwelling units on this lot (one unit within the main three-storey detached dwelling and one unit within the ancillary building).

      953 ST CLARENS AVE · Sep 10, 2025 · 299 m away

    Latest activity nearby

    • Minor variancePending

      In Process

      881 ST CLARENS AVE · Nov 18, 2026 · 203 m away
    • Building permitmultiplex

      Second & Third Floor Interior Alterations

      819 ST CLARENS AVE · Nov 10, 2026 · 285 m away
    • Building permitmultiplex

      Secont & Third Floor Interior Alterations

      817 ST CLARENS AVE · Nov 10, 2026 · 290 m away
    • Building permitmultiplex

      Second & Third Floor Interior Alterations

      815 ST CLARENS AVE · Nov 10, 2026 · 295 m away
    • Building permitmultiplex

      Second & Third Floor Interior Alterations

      813 ST CLARENS AVE · Nov 10, 2026 · 300 m away
    • Building permitmultiplex

      Major renovation of an existing Triplex building. The work includes addition to the rear, addition of one more floor (full third floor) and interior alteration of the existing triplex.**** ( increasing no of unit to 5 - Fiveplex) ****

      429 SYMINGTON AVE · Oct 20, 2026 · 297 m away
    • Building permit

      Proposal to construct a rear walkout and deck

      92 PRIMROSE AVE · Oct 7, 2026 · 258 m away
    • Building permit

      Administrative permit for the shared centre porch column located on the mutual property line between41 and 43 Brandon Ave, associated with the proposed porch work under Building Permit ApplicationNo. 26 193822 BLD 00 SR for 41 Brandon Ave

      143 BRANDON AVE · Sep 21, 2026 · 279 m away
    • Zoning review

      Closed

      881 ST CLARENS AVE · Aug 25, 2026 · 203 m away
    • Building permit

      PROPOSED TO UNDERPIN BASEMENT.

      92 PRIMROSE AVE · Aug 6, 2026 · 258 m away

    Neighbourhood: Junction-Wallace Emerson

    About the area around the lot, not the lot itself.

    Nearest station
    Lansdowne Station21 min walk
    Nearest TTC stop
    Lansdowne Ave at Brandon Ave2 min walk
    Nearest cycling route
    Davenport RdBike Lane, 3 min walk
    Nearest traffic count
    8,888 vehicles in 8 hLansdowne Ave / Brandon Ave, 170 m away, Jan 15, 2015
    Serious collisions within 500 m
    32021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 0 with cyclists
    Parks
    Davenport Village Park1 min walk
    Earlscourt Park3 min walk
    Primrose Avenue Parkette3 min walk

    Schools within 1 km

    • ECOLE ELEMENTAIRE CHARLES SAURIOL French Public 10 min walk
    • ST MARY OF THE ANGELS CATHOLIC ELEMENTARY SCHOOL English Separate 12 min walk
    • ST RITA CATHOLIC ELEMENTARY SCHOOL & MSGR FRASER SOUTHWEST English Separate 12 min walk
    • LORETTO COLLEGE SCHOOL English Separate 13 min walk
    • ST LUIGI CATHOLIC ELEMENTARY SCHOOL English Separate 13 min walk
    • REGAL ROAD JR PUBLIC SCHOOL English Public 13 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureJunction-Wallace EmersonMedian neighbourhood
    Median household income (2020)$84,000$84,500
    Households that own their home50%54%
    Population (2021)23,18016,813
    Homes built in 1960 or before40%29%
    Homes needing major repairs7%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleJunction-Wallace EmersonCity median
    Assault720636.3
    Robbery3669.5
    Shootings3.610.5
    Auto theft108192.6
    Theft over $5,00032.446.1
    Break and enter230.4172.8
    Theft from vehicles201.6188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.