HousePrecheckCheck an address

32 Humberline DrToronto · zoning, lot size and permit records

Open space · OR≈ 152.5 × 103.3 m10,525 m²on Humberline Dr

Not a home

Humberline Park

The City of Toronto's real estate inventory lists Humberline Park here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • 1 development application open within 300 m, up to 16 storeysNew buildings may go up around here in the next years. More change nearby than at 55% of Toronto houses.
N50 m
≈ 152.5 m frontage≈ 103.3 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (35% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (26% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Natural Heritage System (88% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 16 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

1 records on file: more than at 53% of Toronto houses (median 0).

  • Building permit17 114982Closednew building

    New unheated public washroom to *Humberline Park*

    Mar 8, 2017 · 32 HUMBERLINE DR

Lot facts

Area
10,525 m²
Frontage
152.5 mestimated, irregular lot
Depth
103.3 mestimated, irregular lot
Street
Humberline Dr
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—
  • Zone OR (Open Space Recreation). Chapter 90, section 90.30 of the by-law. Source
  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: honey locust (6 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
—no decisions on file
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
0
Development applications
1

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    localized concrete and waterproofing repairs to the underground parking garage

    20 HUMBERLINE DR · Nov 3, 2026 · 182 m away
  • Building permit

    Proposal for basement walk out in rear yard

    11 WOODLOT CRES · Jun 22, 2026 · 255 m away
  • Zoning review

    Closed

    20 HUMBERLINE DR · Sep 23, 2025 · 182 m away
  • Development application

    Proposal to permit the redevelopment of the underutilized eastern portion of the subject site with a 16-storey rental apartment building with a total of 164 units.

    30 HUMBERLINE DR · Jul 21, 2025 · 100 m away · City file
  • Building permitsecondary suite

    Proposed secondary unit in the basement, basement walkout and new windows.

    17 WOODLOT CRES · Dec 12, 2024 · 273 m away
  • Building permitgarden suite

    PROPOSED CONSTRUCTION OF NEW 1-STOREY GARDEN SUITE

    60 WOODLOT CRES · Dec 11, 2024 · 140 m away
  • Building permitsecondary suite

    Proposed multiple projects to convert existing single family dwelling into two-unit dwelling and construct new below grade staircase from the garage.

    69 WOODLOT CRES · Nov 5, 2024 · 220 m away
  • Building permitsecondary suite

    Proposed multiple projects to convert existing single family dwelling into two-unit dwelling and construct new below grade staircase from the garage.

    69 WOODLOT CRES · Oct 15, 2024 · 220 m away
  • Zoning review

    Application On Hold

    60 WOODLOT CRES · Oct 8, 2024 · 140 m away
  • Building permit

    Temporary tent is going to be put up for the duration of 1 week (July 21, 2024 - July 28th, 2024). The tent will be used for wedding events throughout the week. The location of the tent would be the area behind the backyard fence - which is the property of the City of Toronto.

    73 WOODLOT CRES · Apr 6, 2024 · 196 m away

Neighbourhood: West Humber-Clairville

About the area around the lot, not the lot itself.

Nearest station
Humber College Station19 min walk
Nearest TTC stop
Humberline Dr at Woodlot Cres (West) East Side2 min walk
Nearest cycling route
West Humber TrlMulti-Use Trail, 3 min walk
Nearest traffic count
12,523 vehicles in 14 hHumberwood Blvd / Humberline Dr, 270 m away, Oct 1, 2024
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
Parks
Humberline Park1 min walk
Finch - Humberline Sportsfields1 min walk
Humber Arboretum1 min walk

Schools within 1 km

  • HUMBERWOOD DOWNS JR MDL ACADEMY English Public 6 min walk
  • HOLY CHILD CATHOLIC ELEMENTARY SCHOOL English Separate 6 min walk
  • HUMBER COLLEGE SCHOOL - NORTH CAMPUS College 13 min walk
  • SOLID ROCK ACADEMY Private 15 min walk
  • HUMBER COLLEGE SCHOOL - UNIVERSITY OF GUELPH BLDG College 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureWest Humber-ClairvilleMedian neighbourhood
Median household income (2020)$92,000$84,500
Households that own their home65%54%
Population (2021)33,30016,813
Homes built in 1960 or before13%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleWest Humber-ClairvilleCity median
Assault933636.3
Robbery152.469.5
Homicide2.75.3
Shootings26.710.5
Auto theft1320.6192.6
Theft over $5,000245.946.1
Break and enter347.5172.8
Theft from vehicles545.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.