HousePrecheckCheck an address

3179 Yonge StToronto · zoning, lot size and permit records

Commercial residential · CR 3.0 (c2.0; r2.5) SS2 (x2443)≈ 58.9 × 111.7 m4,037 m²on Yonge Stcorner, also on Ranleigh Ave

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 5 storeys, 110 rental units, built 1990More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelRecent records on this lot: 26 262312 (Solar Panel Installation on the Roof, 2026); 22 170570 NNY 15 SA (To convert the existing residential building into a four storey apartment building with..., 2022). Larger work can mean noise and trucks next door; read what each one is for.
  • 4 development applications open within 300 m, up to 14 storeysNew buildings may go up around here in the next years. More change nearby than at 88% of Toronto houses.
  • City upkeep score: 90 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: LawrenceThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
≈ 58.9 m frontage≈ 111.7 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 3 building permits open, the oldest since 2016

    Needs a closer look

    Still open in the City's records: 21 124819 (Localized concrete repairs and waterproofing application at slab topside of grade level..., 2021, status Permit Issued); 19 104594 (proposal for exterior uplifting which includes localize brick repairs, replacement of r..., 2019, status Inspection); 16 134681 (a/c system retrofit, 2016, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 7 by-law investigations closed in the last two years

    Good to know

    Closed files (Order Issued Property Standards, Property Standards): 26 249918 PRS 00 IR (Property Standards, 2026); 26 251558 PRS 00 IV (Order Issued Property Standards: Laundry room is not maintained in a clean and sanitary..., 2026); 26 248040 PRS 00 IR (Property Standards, 2026); and 4 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 262312 (Solar Panel Installation on the Roof, 2026); 22 170570 NNY 15 SA (To convert the existing residential building into a four storey apartment building with..., 2022).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 4 development applications open within 300 m

    Good to know

    4 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 14 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 90 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (5 storeys, 110 units, built 1990).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

18 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit26 262312Under Review

    Solar Panel Installation on the Roof

    Oct 29, 2026 · 3179 YONGE ST
  • By-law investigation26 249918 PRS 00 IRClosed

    Property Standards

    Oct 6, 2026 · 3179 YONGE ST
  • By-law investigation26 251558 PRS 00 IVClosed

    Order Issued Property Standards: Laundry room is not maintained in a clean and sanitary condition. Namely, the laundry room is not being maintanined clean.

    Oct 2, 2026 · 3179 YONGE ST
  • By-law investigation26 248040 PRS 00 IRClosed

    Property Standards

    Oct 2, 2026 · 3179 YONGE ST
  • By-law investigation26 234566 PRS 00 IRClosed

    Property Standards

    Sep 9, 2026 · 3179 YONGE ST
  • By-law investigation26 205843 PRS 00 IRClosed

    Property Standards

    Jul 21, 2026 · 3179 YONGE ST
  • By-law investigation26 100648 PRS 00 IRClosed

    Property Standards

    Jan 5, 2026 · 3179 YONGE ST
  • By-law investigation25 114342 PRS 00 IRClosed

    Property Standards

    Feb 7, 2025 · 3179 YONGE ST
Show 10 older records
  • Development application22 170570 NNY 15 SANOAC Issued

    To convert the existing residential building into a four storey apartment building with a height of 12.95 metres and a total of 16 dwelling units. Rezoning application for this site 21 176276 NNY 15 OZ is also being reviewed together with this application.

    Jun 30, 2022 · 47 RANLEIGH AVE · City file
  • Development application21 176276 NNY 15 OZClosed

    Application to demolish the existing two-storey residential building with three dwelling units and construct a new four-storey apartment building with a height of 12.95 metres and 16 dwelling units.

    Jun 26, 2021 · 47 RANLEIGH AVE · City file
  • Building permit21 124819Permit Issued

    Localized concrete repairs and waterproofing application at slab topside of grade level storage room

    May 4, 2021 · 3179 YONGE ST
  • Building permit19 182999Closed

    Proposal to replace the fire alarm panel and voice communication system and modifications to existing system (End of line resistors, additional supervisory valves, fire pump running and generator monitor points.)

    Jul 16, 2019 · 3179 YONGE ST
  • Building permit19 104594Inspection

    proposal for exterior uplifting which includes localize brick repairs, replacement of railing on balconies and roof membrane for existing retirement building.

    Feb 25, 2019 · 3179 YONGE ST
  • Building permit18 269500Closed

    New premise isolation backflow preventer installation.

    Jan 15, 2019 · 3179 YONGE ST
  • Building permit16 149633Closed

    Proposal to replace heating and hot water boilers in existing apartment building.

    May 11, 2016 · 3179 YONGE ST
  • Building permit16 134681Permit Issued

    a/c system retrofit

    Apr 25, 2016 · 3179 YONGE ST
  • Building permit15 244109Closed

    Replacement of two existing MUA with new more efficeient make up air unit on roof

    Nov 12, 2015 · 3179 YONGE ST
  • Zoning review85 026933 LTOClosed
    Sep 12, 1985 · 3179 YONGE ST

Check before you build

  • Site-specific exception 900.11.10(2443)

    Needs a closer look

    5 site-specific rules and 5 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2443)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 107 of former City of Toronto By-law 438-86

  2. Rule B

    Section 12(2) 108 of former City of Toronto By-law 438-86

  3. Rule C

    Section 12(2) 269 of former City of Toronto By-law 438-86

  4. Rule D

    Section 12(2) 270(a) of former City of Toronto By-law 438-86

  5. Rule F

    On 3179 Yonge St., former City of Toronto by-law 809-87.

  6. Older by-law A

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 107 of former City of Toronto By-law 438-86

  7. Older by-law B

    Section 12(2) 108 of former City of Toronto By-law 438-86

  8. Older by-law C

    Section 12(2) 269 of former City of Toronto By-law 438-86

  9. Older by-law D

    Section 12(2) 270(a) of former City of Toronto By-law 438-86

  10. Older by-law F

    On 3179 Yonge St., former City of Toronto by-law 809-87.

2 parts for other addresses
  • E On 18 Wanless Ave., City of Toronto by-law 902-99
  • E On 18 Wanless Ave., City of Toronto by-law 902-99
By-law 569-2013, Chapter 900

Lot facts

Area
4,037 m²
Frontage
58.9 mestimated, irregular lot
Depth
111.7 mestimated, irregular lot
Street
Yonge St
Corner lot
Yes, also on Ranleigh Ave111.7 m along it
Public lane
None
House footprint
1,700 m²roof up to 24 m
Back yard
6.8 mhouse to rear lot line
Side yards
7.5 m and 17.5 mhouse to side lot lines
Buildings on the lot
6house, garage, sheds
Max height
16 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Site and Area Specific Policy 165. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Major Transit Station Area: Lawrence. The lot is inside the Lawrence Major Transit Station Area approved by the Province (Site and Area Specific Policy 724). Source
  • Zone CR 3.0 (c2.0; r2.5) SS2 (x2443) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
69%22 of 32 decisions
Garden suite permits
0
Laneway suite permits
1
Multiplex permits
8
Development applications
6

Within 300 m, last 10 years. 9 suite and multiplex permits: more than at 72% of Toronto houses (median 3). 32 variance decisions: more than at 65% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To facilitate in the development of a 15-storey mixed use building by seeking to permit a mix of rental units ranging from studio to three bedrooms for a total of 157 rental units and non-residential use at grade. Previous Committee of Adjustment Applications A0312/24NY. Related Planning Applications: 20 214204 NNY 08 OZ & 21 162972 NNY 08 SA.

    3180 YONGE ST · Oct 15, 2026 · 127 m away
  • Minor varianceApproved

    Proposal to construct a three-storey addition and a three-storey rear addition.

    3309 YONGE ST · May 29, 2025 · 365 m away
  • Minor varianceRefused

    To facilitate in the development of the already approved 11-storey building by seeking to permit four (4) additional storeys, plus a mechanical amenity level, for a total height of 15-storeys, including 49 additional dwelling units, increasing the total number dwelling units to 153 units. Related Planning Applications: 20 214204 NNY 08 OZ & 21 162972 NNY 08 SA.

    3180-3182 YONGE ST · Aug 29, 2024 · 127 m away
  • Minor varianceApproved

    Proposal to convert ground floor residentail unit to office space, and a new enclosed Exist stair. The conversion is focused on the rear (west) portion of the building.

    3264 YONGE ST · Nov 9, 2023 · 342 m away
  • Minor varianceApproved

    Proposal for interior alterations to convert existing ground floor to a Place of Worship and to replace existing store front.

    3281 YONGE ST · Nov 10, 2020 · 290 m away

Latest activity nearby

  • Building permit

    Interior alteration of existing restaurant on ground floor to dental clinic office with new plumbing and HVAC proposed.

    3231 YONGE ST · Nov 9, 2026 · 148 m away
  • Building permitsecondary suite

    Preparation of As-Built drawings and Existing condition documentation in response to Order to Comply

    17 CRANBROOKE AVE · Nov 4, 2026 · 231 m away
  • Building permit

    Proposed interior alterations to existing dental office for new urology medical office.

    3080 YONGE ST · Nov 3, 2026 · 234 m away
  • Building permit

    Proposal to remove two existing rooftop units and install new carrier replacements on custom curb adapters, with structural opening reinforcement, gas and electrical reconnection, new thermostats and controls, and balancing and commissioning.

    3224 YONGE ST · Oct 29, 2026 · 221 m away
  • Building permit

    Solar Panel Installation on the Roof

    3179 YONGE ST · Oct 29, 2026 · 34 m away
  • Minor varianceApproved

    To facilitate in the development of a 15-storey mixed use building by seeking to permit a mix of rental units ranging from studio to three bedrooms for a total of 157 rental units and non-residential use at grade. Previous Committee of Adjustment Applications A0312/24NY. Related Planning Applications: 20 214204 NNY 08 OZ & 21 162972 NNY 08 SA.

    3180 YONGE ST · Oct 15, 2026 · 127 m away
  • Building permitnew building, new house

    New 3-storey detached single-family dwelling with an attached garage

    14 ROSLIN AVE · Oct 15, 2026 · 275 m away
  • Zoning review

    Closed

    43 WANLESS AVE · Oct 13, 2026 · 110 m away
  • Building permit

    The proposed work consists of an optical center providing professional services including contact lens fitting, hearing assessments and hearing aid services, lens edging and fitting for ophthalmic frames, and the retail sale of eyewear products.

    3281 YONGE ST · Oct 7, 2026 · 290 m away
  • Building permit

    1 Projecting sign***TRANSCEND***

    3229 YONGE ST · Oct 1, 2026 · 146 m away

Neighbourhood: Lawrence Park North

About the area around the lot, not the lot itself.

Nearest station
Lawrence Station4 min walk
Nearest TTC stop
Yonge St at Ranleigh Ave2 min walk
Nearest cycling route
Jedburgh RdSigned Route (No Pavement Markings), 6 min walk
Nearest traffic count
890 vehicles in 8 hWanless Ave / Leith Pl, 110 m away, Nov 17, 2003
Serious collisions within 500 m
62021–2026, killed or seriously injured: 0 fatal, 4 with pedestrians, 0 with cyclists
Parks
Ranleigh Park2 min walk
George Milbrandt Parkette4 min walk
Jaye Robinson Park4 min walk

Schools within 1 km

  • BEDFORD PARK PUBLIC SCHOOL English Public 2 min walk
  • BLESSED SACRAMENT CATHOLIC ELEMENTARY SCHOOL English Separate 3 min walk
  • THE DUNBLAINE SCHOOL Private 12 min walk
  • JOHN WANLESS JR PUBLIC SCHOOL English Public 14 min walk
  • LAWRENCE PARK COLLEGIATE INSTITUTE English Public 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureLawrence Park NorthMedian neighbourhood
Median household income (2020)$168,000$84,500
Households that own their home75%54%
Population (2021)14,67516,813
Homes built in 1960 or before66%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleLawrence Park NorthCity median
Assault265.5636.3
Robbery42.269.5
Auto theft96.5192.6
Theft over $5,00018.146.1
Break and enter235.3172.8
Theft from vehicles175188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.