HousePrecheckCheck an address

3159 Birchmount RdToronto · zoning, lot size and permit records

Open space · OR157.2 × 399.3 m60,213 m²on Birchmount Rdcorner, also on McNicoll Ave

Not a home

L'Amoreaux Park

The City of Toronto's real estate inventory lists L'Amoreaux Park here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Permits or applications open on this parcelStill open in the City's records: 15 230368 (Proposal for a new shade structure for Kidstown Park- City of Toronto, 2015, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
157.2 m frontage399.3 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (21% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (20% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Building permit open since 2015

    Needs a closer look

    Still open in the City's records: 15 230368 (Proposal for a new shade structure for Kidstown Park- City of Toronto, 2015, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Natural Heritage System (90% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

5 records on file: more than at 93% of Toronto houses (median 0).

  • Building permit24 108389Closed

    Proposal to renovate existing park amenity building with upgrades to layouts and finishing; new extended roof

    Mar 27, 2024 · 3159 BIRCHMOUNT RD
  • Building permit24 108383Cancellednew building

    Proposal to construct new open air changing pavillion.

    Jan 25, 2024 · 3159 BIRCHMOUNT RD
  • Building permit15 230368Inspectionnew building

    Proposal for a new shade structure for Kidstown Park- City of Toronto

    Oct 30, 2015 · 3159 BIRCHMOUNT RD
  • Building permit01 183239Closed

    HVAC - Expansion of water splash pad and covert a portion of changeroom to washrooms - Interior Alterations

    Apr 27, 2012 · 3159 BIRCHMOUNT RD
  • Building permit10 226976Closed - Dormant

    To install one (1) new backflow prevention device

    Aug 12, 2010 · 3159 BIRCHMOUNT RD

Lot facts

Area
60,213 m²
Frontage
157.2 m
Depth
399.3 m
Street
Birchmount Rd
Corner lot
Yes, also on McNicoll Ave399.3 m along it
Public lane
None
Max height
—
Max lot coverage
—
  • Zone OR (Open Space Recreation). Chapter 90, section 90.30 of the by-law. Source
  • 31 City trees in front of this lot. The City's street tree inventory lists 31 trees at this address: linden, littleleaf (57 cm), linden, littleleaf (47 cm), basswood, american (45 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
—no decisions on file
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Proposal to renovate existing park amenity building with upgrades to layouts and finishing; new extended roof

    3159 BIRCHMOUNT RD · Mar 27, 2024 · 185 m away
  • Building permitnew building

    Proposal to construct new open air changing pavillion.

    3159 BIRCHMOUNT RD · Jan 25, 2024 · 185 m away
  • Building permitsecondary suite

    NEW SECOND DWELLING UNIT WITH TWO BEDROOMS IN BASEMENT W/ NEW BELOW GRADE STAIRWELL IN REAR YARD

    52 STALEY TER · Oct 13, 2023 · 275 m away
  • Building permit

    Proposed interior alterations on first floor.

    28 LAPWORTH CRES · Apr 8, 2019 · 254 m away
  • Building permit

    Proposal to repair/reconstruct front portion of dwelling and porch due to vehicle impact damage.

    5 MORBANK DR · Jul 17, 2018 · 149 m away
  • Building permit

    Proposed solar voltaic panels on roof top.

    55 STALEY TER · Aug 23, 2017 · 284 m away
  • Building permitsecondary suite

    Interior alterations to an existing basement to legalize an existing basement apartment and create an additional bed and storage area (80m2)

    32 LAPWORTH CRES · Apr 19, 2017 · 273 m away
  • Building permit

    new rear deck - existing deck to be demolished

    5 MORBANK DR · Dec 16, 2016 · 149 m away
  • Minor varianceApproved

    The applicant is seeking relief from the provisions of the Zoning By-law to permit the rear deck built without a building permit.

    5 MORBANK DR · Sep 8, 2016 · 149 m away
  • Building permit

    Proposed basement walkout at rear of dwelling.

    6 LAPWORTH CRES · Mar 17, 2016 · 142 m away

Neighbourhood: East L'Amoreaux

About the area around the lot, not the lot itself.

Nearest TTC stop
McNicoll Ave at Morbank Dr1 min walk
Nearest cycling route
West Highland Creek TrlMulti-Use Trail - Entrance, 1 min walk
Nearest traffic count
15,347 vehicles in 8 hMcNicoll Ave / Morbank Dr, 100 m away, Mar 29, 2018
Serious collisions within 500 m
22021–2026, killed or seriously injured: 1 fatal, 0 with pedestrians, 0 with cyclists
Parks
L'Amoreaux Hydro1 min walk
L'Amoreaux Sports Complex1 min walk
L'Amoreaux North Park2 min walk

Schools within 1 km

  • ST SYLVESTER CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk
  • SILVER SPRINGS PUBLIC SCHOOL English Public 11 min walk
  • TCDSB PROGRAM AND SPECIALS SERVICES - EAST BUILDING English Separate 11 min walk
  • DAVID LEWIS PUBLIC SCHOOL English Public 13 min walk
  • MARY WARD CATHOLIC SECONDARY SCHOOL English Separate 14 min walk
  • BROOKMILL BOULEVARD JR PUBLIC SCHOOL English Public 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureEast L'AmoreauxMedian neighbourhood
Median household income (2020)$85,000$84,500
Households that own their home75%54%
Population (2021)21,49516,813
Homes built in 1960 or before8%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleEast L'AmoreauxCity median
Assault288.6636.3
Robbery87.869.5
Auto theft167.3192.6
Theft over $5,00016.746.1
Break and enter234.2172.8
Theft from vehicles79.5188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.