HousePrecheckCheck an address

314 Parliament StToronto · zoning, lot size and permit records

Also 316A Parliament St, 316 Parliament St, 318A Parliament St, 318 Parliament St, 434 Dundas St E and 8 more

Commercial residential · CR 2.0 (c1.0; r1.5) SS2 (x2605)17.5 × 37.0 m631 m²on Parliament Stcorner, also on Dundas St Ebacks onto Heads Lane

Not a home

A commercial or mixed-use building

10 different civic addresses share this parcel, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelStill open in the City's records: 16 140739 (install fire alarm system throughout building, 3 floors & basement, 2016, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 4 development applications open within 300 m, up to 35 storeysNew buildings may go up around here in the next years. More change nearby than at 96% of Toronto houses.
N10 m
17.5 m frontage37.0 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2016

    Needs a closer look

    Still open in the City's records: 16 140739 (install fire alarm system throughout building, 3 floors & basement, 2016, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 4 development applications open within 300 m

    Good to know

    4 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 35 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

33 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 152870 GRA 00 IRClosed

    Graffiti

    Apr 30, 2026 · 314 PARLIAMENT ST
  • By-law investigation26 151336 SIN 00 IRClosed

    Signs

    Apr 28, 2026 · 314 PARLIAMENT ST
  • By-law investigation26 149818 GRA 00 IVClosed

    Notice Issued Graffiti

    Apr 16, 2026 · 314 PARLIAMENT ST
  • By-law investigation26 145338 GRA 00 IRClosed

    Graffiti

    Apr 16, 2026 · 314 PARLIAMENT ST
  • Zoning review24 124913 LTOClosed
    Mar 13, 2024 · 444 DUNDAS ST E
  • Zoning review22 205897 LTOClosed
    Sep 20, 2022 · 444 DUNDAS ST E
  • Building permit20 152450Closed

    install 3/4" DCVA backflow preventer

    Jul 8, 2020 · 314 PARLIAMENT ST
  • Zoning review19 153160 LTOClosed
    May 13, 2019 · 440 DUNDAS ST E
Show 25 older records
  • Zoning review19 150870 LTOClosed
    May 8, 2019 · 442 DUNDAS ST E
  • Zoning review19 105900 LTOClosed
    Jan 18, 2019 · 314 PARLIAMENT ST
  • Building permit16 140739Inspection

    install fire alarm system throughout building, 3 floors & basement

    May 25, 2016 · 314 PARLIAMENT ST
  • Zoning review09 133364 LTOClosed
    May 4, 2009 · 314 PARLIAMENT ST
  • Zoning review07 260306 LTOClosed
    Sep 11, 2007 · 314 PARLIAMENT ST
  • Zoning review07 246728 LTOClosed
    Jul 24, 2007 · 314 PARLIAMENT ST
  • Building permit07 240546Cancelled

    replace one kitchen exhaust system

    Jul 13, 2007 · 314 PARLIAMENT ST
  • Zoning review06 152366 LTOClosed
    Jun 30, 2006 · 314 PARLIAMENT ST
  • Zoning review04 157259 LTOClosed
    Jul 15, 2004 · 314 PARLIAMENT ST
  • Zoning review04 105604 LTOClosed
    Jan 28, 2004 · 314 PARLIAMENT ST
  • Zoning review02 189081 LTOClosed
    Nov 14, 2002 · 314 PARLIAMENT ST
  • Zoning review98 025501 LTOClosed
    Jan 9, 1998 · 438 DUNDAS ST E
  • Zoning review97 025922 LTOClosed
    Feb 13, 1997 · 444 DUNDAS ST E
  • Zoning review96 025733 LTOClosed
    Dec 2, 1996 · 438 DUNDAS ST E
  • Zoning review89 030456 LTOClosed
    Oct 25, 1989 · 436 DUNDAS ST E
  • Zoning review86 028203 LTOClosed
    Jun 23, 1986 · 436 DUNDAS ST E
  • Zoning review86 027976 LTOClosed
    Mar 20, 1986 · 442 DUNDAS ST E
  • Zoning review85 026327 LTOClosed
    Jan 18, 1985 · 444 DUNDAS ST E
  • Zoning review84 026629 LTOClosed
    Jul 6, 1984 · 316 PARLIAMENT ST
  • Zoning review84 027104 LTOClosed
    Apr 27, 1984 · 442 DUNDAS ST E
  • Zoning review83 026117 LTOClosed
    Jul 18, 1983 · 316 PARLIAMENT ST
  • Zoning review82 026718 LTOClosed
    Dec 10, 1982 · 316 PARLIAMENT ST
  • Zoning review82 026142 LTOClosed
    Jun 7, 1982 · 438 DUNDAS ST E
  • Zoning review81 030267 LTOClosed
    May 7, 1981 · 442 DUNDAS ST E
  • Zoning review81 030009 LTOClosed
    Mar 4, 1981 · 438 DUNDAS ST E

Check before you build

  • Site-specific exception 900.11.10(2605)

    Needs a closer look

    4 site-specific rules and 4 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2605)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    On a lot , a building or structure that has assisted housing has a parking rate of 0.3 spaces per dwelling unit ; and [TO: 438-86; 12(2) 207]

  2. Rule B

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(1) 66 of former City of Toronto By-law 438-86; (B) Section 12(2) 132 of former City of Toronto By-law 438-86

  3. Rule C

    Section 12(2) 239 of former City of Toronto By-law 438-86

  4. Rule D

    Section 12(2) 270(a) of former City of Toronto By-law 438-86.

  5. Older by-law A

    On a lot , a building or structure that has assisted housing has a parking rate of 0.3 spaces per dwelling unit ; and [TO: 438-86; 12(2) 207]

  6. Older by-law B

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(1) 66 of former City of Toronto By-law 438-86; (B) Section 12(2) 132 of former City of Toronto By-law 438-86

  7. Older by-law C

    Section 12(2) 239 of former City of Toronto By-law 438-86

  8. Older by-law D

    Section 12(2) 270(a) of former City of Toronto By-law 438-86.

By-law 569-2013, Chapter 900

Lot facts

Area
631 m²
Frontage
17.5 m
Depth
37 m
Street
Parliament St
Corner lot
Yes, also on Dundas St E37 m along it
Public lane
Heads Lane, 25.4 m along it
House footprint
491 m²roof up to 12.4 m
Back yard
0.1 mhouse to rear lot line
Side yards
0 m and 0 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
4house, garage, sheds
Max height
14 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Priority retail street: Dundas Street East, Parliament Street. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 2.0 (c1.0; r1.5) SS2 (x2605) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
95%35 of 37 decisions
Garden suite permits
1
Laneway suite permits
1
Multiplex permits
9
Development applications
11

Within 300 m, last 10 years. 11 suite and multiplex permits: more than at 77% of Toronto houses (median 3). 37 variance decisions: more than at 71% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing three-storey mixed-use building by converting the storage room on the second and third levels into seven additional hostel suites (three on the second level, and four on the third level). The existing pharmacy and cafeteria on the ground level, 19 hostel suites on the second level, and 20 hostel suites on the third level will be maintained and unaltered.

    311 SHERBOURNE ST · Jun 3, 2026 · 490 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 141-2005 (as amended by By-laws 1325-2023 and 1392-2024)) for a mixed-use building encompassing Tower D and including a podium/base building on the lands between Dreamer¿s Way and Street G, in regards to the phasing requirements (the construction of Street G, and Sackville Street) and by increasing the height of the mechanical penthouse. A Site Plan Control application (File No. 25 103941 STE 13 SA) is currently under review and consideration. This building will contain 271 affordable rental housing units, and 33,161 m² of residential gross floor area, 913 m² of ground floor retail space, and 1,160 m² of ground floor community space.

    325 GERRARD ST E · Oct 1, 2025 · 327 m away
  • Minor varianceApproved

    To alter the existing three-storey commercial building (containing office uses) by converting the west half of the first storey, and the second and third storeys into a hotel use with a common use area located on the ground floor. The existing east half of the building and the existing pharmacy (located on the ground floor) will be maintained. There will be a total of 39 hotel rooms within this mixed-use building.

    311 SHERBOURNE ST · May 7, 2025 · 490 m away
  • Minor varianceApproved

    To continue to permit the use of the existing rear second storey rooftop deck/terrace as part of the existing restaurant.

    454 PARLIAMENT ST · Feb 19, 2025 · 471 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 770-2023), for a new 14-storey mixed-use building, by increasing the gross floor area, and building height.

    401 DUNDAS ST E · Jun 19, 2024 · 127 m away

Latest activity nearby

  • Minor variancePending

    To alter the development standards (as approved under Site Specific Zoning By-law 770-2023), for the 10-storey (39.95 m, including the mechanical penthouse) approved mixed-use building with a two-level underground parking garage, by increasing the building height to 16-storeys (58.4 m, including the mechanical penthouse), resulting in increased residential gross floor area, and modified setbacks. There will be a total of 32 vehicular parking spaces, including three obstructed resident parking spaces. There will be a total of 150 purpose-built rental residential dwelling units on this lot. A related Site Plan Control application (File Number 21 227303 STE 13 SA) is currently under review. This application is necessitated to further increase the building height (14-storeys and 51.65 m), and residential gross floor area approved in Minor Variance Decision A0395/24TEY.

    401 DUNDAS ST E · Nov 25, 2026 · 127 m away
  • Zoning review

    Not Started

    290 SHUTER ST · Nov 17, 2026 · 289 m away
  • Building permit

    Proposal to lower the existing basement via underpinning, interior alterations unfinished basement renovation in single family dwelling

    231 SEATON ST · Nov 10, 2026 · 287 m away
  • Building permit

    REVISION-01Propose to relocate washer/dryer from ground floor to second-floor mechanical room, convert existing ground-floor enclosure into a washroom, and add a capped plumbing rough-in for a future kitchenette sink.

    29 OAK ST · Oct 28, 2026 · 172 m away
  • Zoning review

    Under Review

    20 REGENT ST · Oct 27, 2026 · 252 m away
  • Building permit

    Basement underpinning

    321 ONTARIO ST · Oct 22, 2026 · 198 m away
  • Zoning review

    Closed

    234 PARLIAMENT ST · Oct 8, 2026 · 244 m away
  • Building permit

    Proposed Fire Damage Restoration - BLD & HVA - To restore the unit to pre-loss conditions, complete removal and replacement of the unit interior finishes will be required. Selective removal and replacement of the fire damaged floor joists shall be conducted. Following the reinstallation of the floor joists, the jack posts must be installed to the underside of the roof joists.

    401 PARLIAMENT ST · Sep 28, 2026 · 291 m away
  • Building permit

    1 wall sign**1 OAK DENTAL**

    1 OAK ST · Sep 23, 2026 · 128 m away
  • Building permit

    Proposed Interior Alterations Bank - see 26 178115 BLD 00 BA

    365 PARLIAMENT ST · Sep 11, 2026 · 166 m away

Neighbourhood: Moss Park

About the area around the lot, not the lot itself.

Nearest station
TMU Station20 min walk
Nearest TTC stop
Parliament St at Dundas St East1 min walk
Nearest cycling route
Gerrard St EBike Lane, 4 min walk
Nearest traffic count
18,060 vehicles in 14 hDundas St E / Parliament St, 40 m away, Oct 15, 2025
Serious collisions within 500 m
142021–2026, killed or seriously injured: 3 fatal, 9 with pedestrians, 2 with cyclists
Parks
Oak Street Parkette3 min walk
Ontario Street Parkette4 min walk
Anniversary Park5 min walk

Schools within 1 km

  • LORD DUFFERIN JR & SR PUBLIC SCHOOL English Public 2 min walk
  • NELSON MANDELA PARK PUBLIC SCHOOL English Public 8 min walk
  • LIBERTY PREP SCHOOL Private 8 min walk
  • ECOLE ELEMENTAIRE GABRIELLE ROY French Public 9 min walk
  • ST PAUL CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk
  • SPRUCECOURT JR PUBLIC SCHOOL English Public 10 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMoss ParkMedian neighbourhood
Median household income (2020)$65,000$84,500
Households that own their home35%54%
Population (2021)21,49016,813
Homes built in 1960 or before17%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMoss ParkCity median
Assault2226.8636.3
Robbery166.669.5
Homicide3.45.3
Shootings3.410.5
Auto theft81.6192.6
Theft over $5,00064.646.1
Break and enter350.2172.8
Theft from vehicles275.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.