Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Building permit open since 2016
Needs a closer lookStill open in the City's records: 16 140739 (install fire alarm system throughout building, 3 floors & basement, 2016, status Inspection).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)4 development applications open within 300 m
Good to know4 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 35 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
33 records on file: more than at 100% of Toronto houses (median 0).
- By-law investigation26 152870 GRA 00 IRClosed
Graffiti
Apr 30, 2026 · 314 PARLIAMENT ST - By-law investigation26 151336 SIN 00 IRClosed
Signs
Apr 28, 2026 · 314 PARLIAMENT ST - By-law investigation26 149818 GRA 00 IVClosed
Notice Issued Graffiti
Apr 16, 2026 · 314 PARLIAMENT ST - By-law investigation26 145338 GRA 00 IRClosed
Graffiti
Apr 16, 2026 · 314 PARLIAMENT ST - Zoning review24 124913 LTOClosedMar 13, 2024 · 444 DUNDAS ST E
- Zoning review22 205897 LTOClosedSep 20, 2022 · 444 DUNDAS ST E
- Building permit20 152450Closed
install 3/4" DCVA backflow preventer
Jul 8, 2020 · 314 PARLIAMENT ST - Zoning review19 153160 LTOClosedMay 13, 2019 · 440 DUNDAS ST E
Show 25 older records
- Zoning review19 150870 LTOClosedMay 8, 2019 · 442 DUNDAS ST E
- Zoning review19 105900 LTOClosedJan 18, 2019 · 314 PARLIAMENT ST
- Building permit16 140739Inspection
install fire alarm system throughout building, 3 floors & basement
May 25, 2016 · 314 PARLIAMENT ST - Zoning review09 133364 LTOClosedMay 4, 2009 · 314 PARLIAMENT ST
- Zoning review07 260306 LTOClosedSep 11, 2007 · 314 PARLIAMENT ST
- Zoning review07 246728 LTOClosedJul 24, 2007 · 314 PARLIAMENT ST
- Building permit07 240546Cancelled
replace one kitchen exhaust system
Jul 13, 2007 · 314 PARLIAMENT ST - Zoning review06 152366 LTOClosedJun 30, 2006 · 314 PARLIAMENT ST
- Zoning review04 157259 LTOClosedJul 15, 2004 · 314 PARLIAMENT ST
- Zoning review04 105604 LTOClosedJan 28, 2004 · 314 PARLIAMENT ST
- Zoning review02 189081 LTOClosedNov 14, 2002 · 314 PARLIAMENT ST
- Zoning review98 025501 LTOClosedJan 9, 1998 · 438 DUNDAS ST E
- Zoning review97 025922 LTOClosedFeb 13, 1997 · 444 DUNDAS ST E
- Zoning review96 025733 LTOClosedDec 2, 1996 · 438 DUNDAS ST E
- Zoning review89 030456 LTOClosedOct 25, 1989 · 436 DUNDAS ST E
- Zoning review86 028203 LTOClosedJun 23, 1986 · 436 DUNDAS ST E
- Zoning review86 027976 LTOClosedMar 20, 1986 · 442 DUNDAS ST E
- Zoning review85 026327 LTOClosedJan 18, 1985 · 444 DUNDAS ST E
- Zoning review84 026629 LTOClosedJul 6, 1984 · 316 PARLIAMENT ST
- Zoning review84 027104 LTOClosedApr 27, 1984 · 442 DUNDAS ST E
- Zoning review83 026117 LTOClosedJul 18, 1983 · 316 PARLIAMENT ST
- Zoning review82 026718 LTOClosedDec 10, 1982 · 316 PARLIAMENT ST
- Zoning review82 026142 LTOClosedJun 7, 1982 · 438 DUNDAS ST E
- Zoning review81 030267 LTOClosedMay 7, 1981 · 442 DUNDAS ST E
- Zoning review81 030009 LTOClosedMar 4, 1981 · 438 DUNDAS ST E
Check before you build
Site-specific exception 900.11.10(2605)
Needs a closer look4 site-specific rules and 4 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
On a lot , a building or structure that has assisted housing has a parking rate of 0.3 spaces per dwelling unit ; and [TO: 438-86; 12(2) 207]
- Rule B
These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(1) 66 of former City of Toronto By-law 438-86; (B) Section 12(2) 132 of former City of Toronto By-law 438-86
- Rule C
Section 12(2) 239 of former City of Toronto By-law 438-86
- Rule D
Section 12(2) 270(a) of former City of Toronto By-law 438-86.
- Older by-law A
On a lot , a building or structure that has assisted housing has a parking rate of 0.3 spaces per dwelling unit ; and [TO: 438-86; 12(2) 207]
- Older by-law B
These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(1) 66 of former City of Toronto By-law 438-86; (B) Section 12(2) 132 of former City of Toronto By-law 438-86
- Older by-law C
Section 12(2) 239 of former City of Toronto By-law 438-86
- Older by-law D
Section 12(2) 270(a) of former City of Toronto By-law 438-86.
Lot facts
- Area
- 631 m²
- Frontage
- 17.5 m
- Depth
- 37 m
- Street
- Parliament St
- Corner lot
- Yes, also on Dundas St E37 m along it
- Public lane
- Heads Lane, 25.4 m along it
- House footprint
- 491 m²roof up to 12.4 m
- Back yard
- 0.1 mhouse to rear lot line
- Side yards
- 0 m and 0 mhouse to side lot lines; 0 is a shared wall
- Buildings on the lot
- 4house, garage, sheds
- Max height
- 14 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Priority retail street: Dundas Street East, Parliament Street. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 2.0 (c1.0; r1.5) SS2 (x2605) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
Around this lot
- Minor variances approved
- 95%35 of 37 decisions
- Garden suite permits
- 1
- Laneway suite permits
- 1
- Multiplex permits
- 9
- Development applications
- 11
Within 300 m, last 10 years. 11 suite and multiplex permits: more than at 77% of Toronto houses (median 3). 37 variance decisions: more than at 71% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the existing three-storey mixed-use building by converting the storage room on the second and third levels into seven additional hostel suites (three on the second level, and four on the third level). The existing pharmacy and cafeteria on the ground level, 19 hostel suites on the second level, and 20 hostel suites on the third level will be maintained and unaltered.
311 SHERBOURNE ST · Jun 3, 2026 · 490 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 141-2005 (as amended by By-laws 1325-2023 and 1392-2024)) for a mixed-use building encompassing Tower D and including a podium/base building on the lands between Dreamer¿s Way and Street G, in regards to the phasing requirements (the construction of Street G, and Sackville Street) and by increasing the height of the mechanical penthouse. A Site Plan Control application (File No. 25 103941 STE 13 SA) is currently under review and consideration. This building will contain 271 affordable rental housing units, and 33,161 m² of residential gross floor area, 913 m² of ground floor retail space, and 1,160 m² of ground floor community space.
325 GERRARD ST E · Oct 1, 2025 · 327 m away - Minor varianceApproved
To alter the existing three-storey commercial building (containing office uses) by converting the west half of the first storey, and the second and third storeys into a hotel use with a common use area located on the ground floor. The existing east half of the building and the existing pharmacy (located on the ground floor) will be maintained. There will be a total of 39 hotel rooms within this mixed-use building.
311 SHERBOURNE ST · May 7, 2025 · 490 m away - Minor varianceApproved
To continue to permit the use of the existing rear second storey rooftop deck/terrace as part of the existing restaurant.
454 PARLIAMENT ST · Feb 19, 2025 · 471 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 770-2023), for a new 14-storey mixed-use building, by increasing the gross floor area, and building height.
401 DUNDAS ST E · Jun 19, 2024 · 127 m away
Latest activity nearby
- Minor variancePending
To alter the development standards (as approved under Site Specific Zoning By-law 770-2023), for the 10-storey (39.95 m, including the mechanical penthouse) approved mixed-use building with a two-level underground parking garage, by increasing the building height to 16-storeys (58.4 m, including the mechanical penthouse), resulting in increased residential gross floor area, and modified setbacks. There will be a total of 32 vehicular parking spaces, including three obstructed resident parking spaces. There will be a total of 150 purpose-built rental residential dwelling units on this lot. A related Site Plan Control application (File Number 21 227303 STE 13 SA) is currently under review. This application is necessitated to further increase the building height (14-storeys and 51.65 m), and residential gross floor area approved in Minor Variance Decision A0395/24TEY.
401 DUNDAS ST E · Nov 25, 2026 · 127 m away - Zoning review
Not Started
290 SHUTER ST · Nov 17, 2026 · 289 m away - Building permit
Proposal to lower the existing basement via underpinning, interior alterations unfinished basement renovation in single family dwelling
231 SEATON ST · Nov 10, 2026 · 287 m away - Building permit
REVISION-01Propose to relocate washer/dryer from ground floor to second-floor mechanical room, convert existing ground-floor enclosure into a washroom, and add a capped plumbing rough-in for a future kitchenette sink.
29 OAK ST · Oct 28, 2026 · 172 m away - Zoning review
Under Review
20 REGENT ST · Oct 27, 2026 · 252 m away - Building permit
Basement underpinning
321 ONTARIO ST · Oct 22, 2026 · 198 m away - Zoning review
Closed
234 PARLIAMENT ST · Oct 8, 2026 · 244 m away - Building permit
Proposed Fire Damage Restoration - BLD & HVA - To restore the unit to pre-loss conditions, complete removal and replacement of the unit interior finishes will be required. Selective removal and replacement of the fire damaged floor joists shall be conducted. Following the reinstallation of the floor joists, the jack posts must be installed to the underside of the roof joists.
401 PARLIAMENT ST · Sep 28, 2026 · 291 m away - Building permit
1 wall sign**1 OAK DENTAL**
1 OAK ST · Sep 23, 2026 · 128 m away - Building permit
Proposed Interior Alterations Bank - see 26 178115 BLD 00 BA
365 PARLIAMENT ST · Sep 11, 2026 · 166 m away
Neighbourhood: Moss Park
About the area around the lot, not the lot itself.
- Nearest station
- TMU Station20 min walk
- Nearest TTC stop
- Parliament St at Dundas St East1 min walk
- Nearest cycling route
- Gerrard St EBike Lane, 4 min walk
- Nearest traffic count
- 18,060 vehicles in 14 hDundas St E / Parliament St, 40 m away, Oct 15, 2025
- Serious collisions within 500 m
- 142021–2026, killed or seriously injured: 3 fatal, 9 with pedestrians, 2 with cyclists
- Parks
- Oak Street Parkette3 min walk
- Ontario Street Parkette4 min walk
- Anniversary Park5 min walk
Schools within 1 km
- LORD DUFFERIN JR & SR PUBLIC SCHOOL English Public 2 min walk
- NELSON MANDELA PARK PUBLIC SCHOOL English Public 8 min walk
- LIBERTY PREP SCHOOL Private 8 min walk
- ECOLE ELEMENTAIRE GABRIELLE ROY French Public 9 min walk
- ST PAUL CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk
- SPRUCECOURT JR PUBLIC SCHOOL English Public 10 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Moss Park | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $65,000 | $84,500 |
| Households that own their home | 35% | 54% |
| Population (2021) | 21,490 | 16,813 |
| Homes built in 1960 or before | 17% | 29% |
| Homes needing major repairs | 8% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Moss Park | City median |
|---|---|---|
| Assault | 2226.8 | 636.3 |
| Robbery | 166.6 | 69.5 |
| Homicide | 3.4 | 5.3 |
| Shootings | 3.4 | 10.5 |
| Auto theft | 81.6 | 192.6 |
| Theft over $5,000 | 64.6 | 46.1 |
| Break and enter | 350.2 | 172.8 |
| Theft from vehicles | 275.4 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.