HousePrecheckCheck an address

31 Rolph RdToronto · zoning, lot size and permit records

106.5 × 213.9 m20,103 m²on Rolph Rdcorner, also on Randolph Rd

Not a home

Rolph Road Elementary School

The City's school locations place Rolph Road Elementary School on this parcel. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • A school next doorDrop-off traffic around 8 to 9 am and 3 to 4 pm on school days, children walking; a short walk for a family.
  • Permits or applications open on this parcelStill open in the City's records: 17 161093 (Proposal to demolish existing concrete landing at front (stair to remain) and concrete..., 2017, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
106.5 m frontage213.9 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2017

    Needs a closer look

    Still open in the City's records: 17 161093 (Proposal to demolish existing concrete landing at front (stair to remain) and concrete..., 2017, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

13 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation25 164761 WST 00 IRClosed

    Waste

    May 26, 2025 · 31 ROLPH RD
  • Building permit24 230652Closed

    INTERIOR ALTERATIONS TO LIBRARY . STRUCTURAL ALTERATIONS TO ROOF FRAMING,AND EXTERIOR ALTERATIONS FOR ROOF TOP MECHANICAL INSTALLATION

    Nov 26, 2024 · 31 ROLPH RD
  • Building permit21 228534Closed

    PROPOSAL TO REPLACE EXISTING PORTABLE CLASSROOM (1) ON EXISTING ELEMENTARY SCHOOL SITE

    Dec 16, 2021 · 31 ROLPH RD
  • Building permit17 161093Inspection

    Proposal to demolish existing concrete landing at front (stair to remain) and concrete repair to existing elementary school "Rolph Road School"

    Jul 17, 2017 · 31 ROLPH RD
  • Zoning review14 168898 ZPRClosed
    Jun 5, 2014 · 31 ROLPH RD
  • Building permit13 264849Closed

    Proposal for 1 one-storey kindergarten classroom addition (for FDK5) to the north-east side of existing elementary school (Rolph Road Elementary School).(133m2) Sprinklers are charged on this permit.

    Dec 2, 2013 · 31 ROLPH RD
  • Zoning review13 237121 ZPRClosed
    Sep 17, 2013 · 31 ROLPH RD
  • Building permit11 170989Closed

    Install one back flow preventer

    Apr 15, 2011 · 31 ROLPH RD
Show 5 older records
  • Building permit08 187933Closed - Dormant

    Installing two new portables

    Nov 3, 2008 · 31 ROLPH RD
  • Building permit07 262528Closed - Dormant

    Install two new portables.

    Oct 19, 2007 · 31 ROLPH RD
  • Zoning review03 184479 ZPRClosed
    Oct 8, 2003 · 31 ROLPH RD
  • Building permit97 207029Closed

    INT ALT & GYM VENTLTN

    Jul 24, 1997 · 31 ROLPH RD
  • Building permit96 207030Closed

    INT ALT-GYM & CORRIDOR

    Sep 30, 1996 · 31 ROLPH RD

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
20,103 m²
Frontage
106.5 m
Depth
213.9 m
Street
Rolph Rd
Corner lot
Yes, also on Randolph Rd213.9 m along it
Public lane
None
House footprint
922 m²roof up to 18.5 m
Back yard
160 mhouse to rear lot line
Side yards
25.9 m and 29.8 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 5 City trees in front of this lot. The City's street tree inventory lists 5 trees at this address: maple, norway (75 cm), maple, norway (71 cm), maple, norway (68 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
88%45 of 51 decisions
Garden suite permits
2
Laneway suite permits
0
Multiplex permits
4
Development applications
0

Within 300 m, last 10 years. 6 suite and multiplex permits: more than at 64% of Toronto houses (median 3). 51 variance decisions: more than at 86% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing two storey detached dwelling by constructing a second storey rear addition, a new front porch and ancillary structure in the rear yard.

    33 RUMSEY RD · Mar 26, 2026 · 287 m away
  • Minor varianceApproved

    To alter the existing detached dwelling by converting the existing attic space into habitable space.

    2 MALCOLM RD · Mar 5, 2026 · 492 m away
  • Minor varianceApproved

    To construct a new dwelling.

    10 ASTOR AVE · Dec 4, 2025 · 275 m away
  • Minor varianceApproved

    Proposal for a rear addition to existing one-storey dwelling with integral garage, side door, deck and full second floor.

    111 SUTHERLAND DR · Jun 12, 2025 · 154 m away
  • Minor varianceApproved

    To construct a new deck and a two storey rear addition to the existing house

    24 ROLPH RD · May 15, 2025 · 133 m away

Latest activity nearby

  • Building permit

    Proposal to install backwater valve and cleanout

    83 SOUTHVALE DR · Nov 16, 2026 · 122 m away
  • Building permit

    Proposal for interior alterations on the ground floor.

    80 AIRDRIE RD · Nov 12, 2026 · 236 m away
  • Building permit

    Proposal for interior alterations to main floor of SFD.

    117 SUTHERLAND DR · Oct 22, 2026 · 173 m away
  • Building permitgarden suite

    Proposal for a 1 storey garden suite

    66 SOUTHVALE DR · Sep 14, 2026 · 89 m away
  • Zoning review

    Closed

    115 LEACREST RD · Aug 25, 2026 · 226 m away
  • Building permit

    Proposal to construct rear addition, carryout interior alterations and new ancillary structure.

    33 RUMSEY RD · Aug 24, 2026 · 287 m away
  • Building permit

    CONSTRUCT A TWO STOREY ADDITION TO EXISTING SINGLE FAMILY DWELLING

    26 SOUTHVALE DR · Aug 13, 2026 · 261 m away
  • Building permit

    EX. WOODEN PORCH & STEPS TO BE REMOVED AND REPLACED WITH STONE LANDSCAPING

    75 SUTHERLAND DR · Jul 3, 2026 · 98 m away
  • Building permit

    install backwater valve

    110 SOUTHVALE DR · Jun 17, 2026 · 223 m away
  • Building permitmultiplex, secondary suite

    REV 01 - rear yard landscapingProposal for a 3rd floor & 3 storey rear addition (248 m2) and alteration to existing single family dwelling to convert to detached houseplex (duplex) . (128 sqm)

    10 ASTOR AVE · Jun 4, 2026 · 275 m away

Neighbourhood: Leaside-Bennington

About the area around the lot, not the lot itself.

Nearest station
Laird Station24 min walk
Nearest TTC stop
Sutherland Dr at Hanna Rd2 min walk
Nearest cycling route
Moore AveBike Lane, 10 min walk
Nearest traffic count
1,997 vehicles in 8 hRolph Rd / Sutherland Dr, 140 m away, Mar 9, 2022
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Lower Don Parklands6 min walk
Sandy Bruce Park7 min walk
Trace Manes Park8 min walk

Schools within 1 km

  • ROLPH ROAD ELEMENTARY SCHOOL English Public 1 min walk
  • BENNINGTON HEIGHTS ELEMENTARY SCHOOL English Public 12 min walk
  • ST ANSELM CATHOLIC ELEMENTARY SCHOOL English Separate 12 min walk
  • BESSBOROUGH DRIVE ELEMENTARY SCHOOL English Public 14 min walk
  • POLARIS LEARNING CENTRE SCHOOL Private 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureLeaside-BenningtonMedian neighbourhood
Median household income (2020)$148,000$84,500
Households that own their home72%54%
Population (2021)16,53516,813
Homes built in 1960 or before67%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleLeaside-BenningtonCity median
Assault212.9636.3
Robbery10.669.5
Auto theft298.1192.6
Theft over $5,00047.946.1
Break and enter181172.8
Theft from vehicles234.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.