HousePrecheckCheck an address

31 Queens Quay EToronto · zoning, lot size and permit records

Also 35 Queens Quay E, 37 Queens Quay E

49.7 × 52.2 m2,516 m²on Queens Quay Ecorner, also on Freeland St

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • Permits or applications open on this parcelRecent records on this lot: 21 143747 STE 10 OZ (Proposal to modify previously approved Buildings A and F. Building A is proposed with a..., 2021). Larger work can mean noise and trucks next door; read what each one is for.
  • 8 development applications open within 300 m, up to 95 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
N20 m
49.7 m frontage52.2 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Work or applications in progress

    Good to know

    Recent records on this lot: 21 143747 STE 10 OZ (Proposal to modify previously approved Buildings A and F. Building A is proposed with a..., 2021).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. B0046/25TEY (To obtain consent to a stratified severance and to create new easements/rights-of-way, 2025).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 8 development applications open within 300 m

    Good to know

    8 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 95 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

2 records on file: more than at 72% of Toronto houses (median 0).

  • Consent (lot split)B0046/25TEYApproved

    To obtain consent to a stratified severance and to create new easements/rights-of-way.

    Oct 22, 2025 · 35 QUEENS QUAY E
  • Development application21 143747 STE 10 OZOMB Appeal

    Proposal to modify previously approved Buildings A and F. Building A is proposed with a revised height of 11 storeys containing 136 residential dwelling units (previously approved for 13 storeys containing 132 units). Building F is proposed with a revised height of 45 storeys containing 449 residential dwelling units (previously approved for 13 storeys containing 139 units). In total, an additional 314 residential units are proposed. Please note that OPA/Rezoning File No. 21 143747 STE 10 OZ is being reviewed at the same time as Site Plan Control File No. 21 143750 STE 10 SA. OPA/Rezoning must be approved prior to site plan approval.

    Apr 21, 2021 · 37 QUEENS QUAY E · City file

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
2,516 m²
Frontage
49.7 m
Depth
52.2 m
Street
Queens Quay E
Corner lot
Yes, also on Freeland St52.2 m along it
Public lane
None
Max height
—
Max lot coverage
—
  • 4 City trees in front of this lot. The City's street tree inventory lists 4 trees at this address: oak, red (18 cm), oak, red (14 cm), oak, red (9 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%6 of 6 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
22

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 6 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the development standards for the 21-storey mixed-use building (as approved under Site Specific Zoning By-law 411-2021 (LPAT)) by permitting the increase of the maximum permitted number of compact parking spaces from 19 compact parking spaces to 23 compact parking spaces (including one accessible compact parking space). There will be a total of 463 residential dwelling units on this lot, as well as retail space at-grade, and a total of 190 parking spaces within a 4-level below grade parking garage.

    162 QUEENS QUAY E · Sep 3, 2025 · 483 m away
  • Minor varianceApproved

    To alter the development standards for a 92-storey mixed-use building (Tower 2), as approved under Site Specific Zoning By-law 1250-2023 (By-law 249-2020(LPAT)), by increasing the number of storeys and building height from 92-storeys (289 m) to 95-storeys (306.4 m). There will be a total of 1,014 residential dwelling units within this tower.

    7 YONGE ST · Sep 3, 2025 · 232 m away
  • Minor varianceApproved

    To alter the development standards for a 105-storey mixed-use building (as approved under Site Specific Zoning By-law 1250-2023) by increasing the building height and to permit an emergency generator on the roof of the building to exceed the maximum permitted building height. The new 106-storey mixed-use building will contain a total of 958 residential dwelling units, retail uses located on the ground floor, and a hotel use located on the 1st to 12th levels.

    7 YONGE ST · Apr 23, 2025 · 232 m away
  • Minor varianceApproved

    To alter the existing 25-storey building (Unit 108/108A and Unit 109) by permitting a side (north) ground level patio and associated structures (tables and planters) within the colonnade.

    20 BAY ST · Jan 15, 2025 · 439 m away
  • Minor varianceApproved

    To permit the reduction of residential parking spaces and types, residential amenity space provided, and tower heights to the 85 ,78, and 70-storey buildings, currently under review by Site Plan Control Application (File Number 20 19218252 STE 10 SA). There will be a total of 2,640 residential dwelling units (with 188 affordable units) within this block (Block4).

    55 LAKE SHORE BLVD E · Oct 23, 2024 · 275 m away

Latest activity nearby

  • Building permit

    Alternative solution to provide specific design features engineered to protect and secure the building's floor openings and stairway.

    1 YONGE ST · Nov 10, 2026 · 137 m away
  • Building permit

    Proposed alternative solution regarding the extent of pool deck serving the following pools/spas for the mixed-use project as 1 Yonge - Phase 2, located at 1-7 Yonge Street

    7 YONGE ST · Nov 5, 2026 · 232 m away
  • Zoning review

    Notice Sent

    1 YONGE ST · Oct 19, 2026 · 137 m away
  • Building permit

    Proposed Alternative Solution for providing 655 mmdiameter standpipe hose connections with the exit stairs (and as required on the floor areas for coverage purposes) in lieu of traditional fire hose cabinets (containing 38 mm and 65 mm diameter hose connections as well as 30 m of fire hose) fot the proposed mixed-use project know as One Yonge Condos - Phase 2, located 1 - 7 Yonge Street.This correspondence has been prepared with respect the fire and lefe safety requirements in Part 3 of the 2012 OBC (OBC, O.Reg. 332/12 as amended to O.Reg 209/20 - 1.2. Code of record as well as the Alternative Solution Proposal requirements in Division C. Article 2.1.1.1 of the OBC

    7 YONGE ST · Sep 25, 2026 · 232 m away
  • Building permitnew building

    Revision to permit 25-182922 BLD for adjustment of elevation to include roof top HVAC unit on E-House #3Proposal to construct three new electrical houses (sheds) that contain electrical equipment for the new electric ferries - City of Toronto, "Jack Layton Ferry Terminal"See also 25 125348 ZAP.

    9 QUEENS QUAY W · Aug 24, 2026 · 291 m away
  • Building permit

    REV 03: REVISION PER BUBBLE DRAWINGSREV02: CANCELLED - Proposed revision to layout as per drawingsRevision 01 to permit 25 116964 BLD 00 BAProposal for interior alterations including 4 new washrooms, 1 new universal washroom, a new kitchenette and new offices. See related permit no. 25 197884 BLD 00 BA.

    100 QUEENS QUAY E · Aug 24, 2026 · 196 m away
  • Building permit

    Toronto Star Building Renovation (Phase 2) includes proposed parking structural (Level 2-4), and gounod level retails

    1 YONGE ST · Aug 17, 2026 · 137 m away
  • Building permit

    REV03: Scope of revision related to plumbing work for the mop sink.Revision 01 to permit 25 197884 BLD 00 BA: addition of a low wall near mop sink.Proposal for interior alterations to existing storage room to convert to office unit. See related permit no. 25 116964 BLD 00 BA

    100 QUEENS QUAY E · Aug 10, 2026 · 196 m away
  • Building permit

    Installation of a 20 ft x8 ft prefabricated coffee container, to be temporary placed on existing asphalt surface, for take out beverage service, including electrical connection, plumbing fixtures, hand wash sink, fresh water tank,grey water tank and beverages preparation equipment.Erect date 2026/July/01, Tear down date 2026/November/01

    7 QUEENS QUAY E · Jul 16, 2026 · 130 m away
  • Building permit

    PROPOSED HVAC SCOPE FOR FIT-OUT FOR MEETING ROOMS, OPEN OFFICE & SERVERY - SEE PERMIT 25 234244

    100 QUEENS QUAY E · Jun 25, 2026 · 196 m away

Neighbourhood: St Lawrence-East Bayfront-The Islands

About the area around the lot, not the lot itself.

Nearest station
Queens Quay/Ferry Docks Station6 min walk
Nearest TTC stop
Queens Quay East at Freeland St1 min walk
Nearest cycling route
Martin Goodman TrlMulti-Use Trail - Boulevard, 1 min walk
Nearest traffic count
12,888 vehicles in 14 hQueens Quay E / Freeland St, 60 m away, Sep 9, 2026
Serious collisions within 500 m
122021–2026, killed or seriously injured: 3 fatal, 7 with pedestrians, 3 with cyclists
Parks
50 Queens Quay East Park1 min walk
Pier 27 Promenade Park2 min walk
Harbour Square Park Lands5 min walk

Schools within 1 km

  • GEORGE BROWN COLLEGE - WATERFRONT CAMPUS College 10 min walk
  • DOWNTOWN ALTERNATIVE SCHOOL English Public 10 min walk
  • ST MICHAEL CATHOLIC ELEMENTARY SCHOOL - BLDG 1 English Separate 11 min walk
  • KEYSTONE INTERNATIONAL SCHOOLS Private 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureSt Lawrence-East Bayfront-The IslandsMedian neighbourhood
Median household income (2020)$87,000$84,500
Households that own their home40%54%
Population (2021)31,28516,813
Homes built in 1960 or before3%29%
Homes needing major repairs3%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleSt Lawrence-East Bayfront-The IslandsCity median
Assault1059.7636.3
Robbery96.369.5
Shootings4.510.5
Auto theft24.6192.6
Theft over $5,00078.446.1
Break and enter163.5172.8
Theft from vehicles163.5188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.