Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Work or applications in progress
Good to knowRecent records on this lot: 25 176212 (1- Storm Water Services: Installation as shown in drawing 2265-001-25 L CIVIL 25-06-02..., 2026); 25 177724 (Proposal to place the temporary site trailers in the laydown area for the proposed Lawr..., 2025); 25 162910 (The proposed scope includes the installation of a lock-block retaining wall within the..., 2025).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications1 development application open within 300 m
Good to know1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
6 records on file: more than at 95% of Toronto houses (median 0).
- Building permit25 176212Permit Issued
1- Storm Water Services: Installation as shown in drawing 2265-001-25 L CIVIL 25-06-02 (R1), including underground storage tank (UGS), oil and grit separator (OGS), storm manholes, and catch basins in the laydown area.2- Sanitary Services: To capture discharge from the bentonite plant, dewatering activities, and site washrooms.3- Water Services: To provide temporary feed to the bentonite plant, site washrooms, and the STC trailer.
Mar 24, 2026 · 3091 LAWRENCE AVE E - Building permit25 177724Inspection
Proposal to place the temporary site trailers in the laydown area for the proposed Lawrence East station
Aug 13, 2025 · 3091 LAWRENCE AVE E - Building permit25 162910Inspection
The proposed scope includes the installation of a lock-block retaining wall within the construction laydown area to provide temporary earth retention and grade separation. The wall will consist of precast concrete lock blocks with keyed interlocking features.
Jun 3, 2025 · 3091 LAWRENCE AVE E - Zoning review23 216457 PRZClosedDec 1, 2023 · 3091 LAWRENCE AVE E
- Building permit22 238456Closed
Demolition of existing building structure for future station building for the Scarborough Subway Extension Project.
Jan 4, 2023 · 3091 LAWRENCE AVE E - Building permit19 174471Closed
INTERIOR FIT UP OF BANK BRANCH, MINOR ALTERATION OF EXISTING HVAC ROUTE IN TEAM LOUNGE AREA
Jul 17, 2019 · 3091 LAWRENCE AVE E
Check before you build
Site-specific exception 900.11.10(507)
Needs a closer look4 site-specific rules apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
The maximum gross floor area of all buildings , excluding any basements is 0.33 times the area of the lot
- Rule B
The minimum building setback from a lot line that abuts a street is: (i) the greater of 21.0 metres from the original centre line of Lawrence Ave. East or 3.0 metres from a lot line abutting Lawrence Ave. East; (ii) the greater of 16.5 metres from the original centre line of McCowan Rd. or 3.0 metres from a lot line abutting McCowan Rd.; and (iii) 3.0 metres from the lot line abutting any other street
- Rule C
The minimum building setback from a rear lot line is 7.5 metres
- Rule D
None of the provisions of By-law 569-2013 will apply to prevent the erection or use of a construction office for the purpose of constructing a transportation use .
Lot facts
- Area
- 1,552 m²
- Frontage
- 37.7 mestimated, irregular lot
- Depth
- 50.6 mestimated, irregular lot
- Street
- Lawrence Ave E
- Corner lot
- Yes, also on McCowan Rd50.6 m along it
- Public lane
- None
- House footprint
- Not showna new house or demolition permit since the City's 3D survey
- Max height
- 11 m
- Max lot coverage
- 33%
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
Around this lot
- Minor variances approved
- —no decisions on file
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 1
- Development applications
- 1
Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).
Latest activity nearby
- Building permit
The existing cancer care clinic at SHN General Hospital is expanding is footprint across existing level 1 clinical space. The demolition permit is required to reveal the existing conditions of the building prior to construction to assist the design consultants and contractor with the extent of the proposed renovation work. The demolition is proposed to remove all partitions, fixtures, services (where not serving other areas) in the area of work. NOTE: all existing fire and life safety systems and access to existing exits are to be maintained throughout the demolition phase.
3050 LAWRENCE AVE E · Sep 25, 2026 · 230 m away - Building permit
Sump pump installation
614 MCCOWAN RD · Aug 7, 2026 · 220 m away - Building permit
REV 02: for the relocation of sanitary (SAN) and storm (STM) works at the Scarborough Health Network. Please refer to Revision C04 for details of the changes. Due to insufficient horizontal separation between the storm and sanitary sewers (only 70 cm), installing two separate manholes was not possible.so MH 18 is now proposed as a dual manhole.Revision 01 - relocation of the sanitary and storm works at the SHN (Scarborough Health Network- General Hospital) for the SSEThe existing 250 - 300MMØ SAN and 300-400MMØ STM near the CKD building are currently in conflict with the SOE footprint. In this scope, these pipes will be re-routed to the north running along the west D-Wall and be connected to ex. SAN and STM lines running along McCowan
3030 LAWRENCE AVE E · Apr 28, 2026 · 282 m away - Building permit
1- Storm Water Services: Installation as shown in drawing 2265-001-25 L CIVIL 25-06-02 (R1), including underground storage tank (UGS), oil and grit separator (OGS), storm manholes, and catch basins in the laydown area.2- Sanitary Services: To capture discharge from the bentonite plant, dewatering activities, and site washrooms.3- Water Services: To provide temporary feed to the bentonite plant, site washrooms, and the STC trailer.
3091 LAWRENCE AVE E · Mar 24, 2026 · 5 m away - Zoning review
Closed
3050 LAWRENCE AVE E · Mar 12, 2026 · 230 m away - Building permit
Revision 01: Revised DesignProposal to alter the existing sprinkler system for tenant renovation in an existing hospital - Satellite Diagnostic Imaging
3050 LAWRENCE AVE E · Mar 4, 2026 · 230 m away - Building permit
To remove the requirement for standard prescriptive provisions (full-height access, emergency lighting, and additional passive fire separations) within a 1 m high crawl space underneath each platform, as the inclusion of such in a space with limited height access may be impractical.
3051 LAWRENCE AVE E · Dec 9, 2025 · 88 m away - Building permit
The proposed alternative solution required for OBC Div. B 3.13.3.3 (4) - Service Rooms and Ancillary Spaces demonstrates compliance with the minimum performance level and objectives, as outlined in the assessment presented.
3051 LAWRENCE AVE E · Dec 9, 2025 · 88 m away - Building permit
It is proposed to extend the prescribed 45 m travel distance to an exit from a floor area by 25m, to a total of 70m.
3051 LAWRENCE AVE E · Dec 9, 2025 · 88 m away - Building permit
It is proposed to permit the separation between the Licensed Tenant Space (3.060) and Bus Plaza (1.170) at L1 Street Level - Southern Entrance spaces within the station public area to be a non-combustible downstand with provision of sprinkler protection and retail smoke extract system.
3051 LAWRENCE AVE E · Dec 9, 2025 · 88 m away
Neighbourhood: Bendale South
About the area around the lot, not the lot itself.
- Nearest station
- Eglinton GO Station31 min walk
- Nearest TTC stop
- McCowan Rd at Lawrence Ave East Scarborough General Hospital1 min walk
- Nearest cycling route
- West Highland Creek Trl/Thompson Memorial Park TrlMulti-Use Trail, 3 min walk
- Nearest traffic count
- 25,691 vehicles in 8 hMcCowan Rd / Lawrence Ave E, 50 m away, Feb 9, 2023
- Serious collisions within 500 m
- 12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
- Parks
- Bendale Park1 min walk
- Hague Park2 min walk
- Thomson Memorial Park6 min walk
Schools within 1 km
- ST ROSE OF LIMA CATHOLIC ELEMENTARY SCHOOL English Separate 7 min walk
- SIMRA ACADEMY PRIVATE SCHOOL Private 9 min walk
- BENDALE JR PUBLIC SCHOOL English Public 13 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Bendale South | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $90,000 | $84,500 |
| Households that own their home | 67% | 54% |
| Population (2021) | 10,725 | 16,813 |
| Homes built in 1960 or before | 54% | 29% |
| Homes needing major repairs | 9% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Bendale South | City median |
|---|---|---|
| Assault | 684.6 | 636.3 |
| Robbery | 95.3 | 69.5 |
| Shootings | 8.7 | 10.5 |
| Auto theft | 294.7 | 192.6 |
| Theft over $5,000 | 8.7 | 46.1 |
| Break and enter | 78 | 172.8 |
| Theft from vehicles | 329.3 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.