HousePrecheckCheck an address

309 Mount Pleasant RdToronto · zoning, lot size and permit records

Residential · R (u4; d0.6) (x728)22.6 × 44.0 m983 m²on St Clair Ave Ecorner, also on Mount Pleasant Rd

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 3 storeys, 25 rental units, built 1960More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelStill open in the City's records: 20 233655 (Repair for unit due to fire damage, 2021, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
  • City upkeep score: 76 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
22.6 m frontage44.0 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2021

    Needs a closer look

    Still open in the City's records: 20 233655 (Repair for unit due to fire damage, 2021, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 2 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Property Standards): 26 172690 000 00 IR (Adequate Heat, 2026); 26 172689 000 00 IR (Property Standards, 2026).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Rental building evaluation: 76 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (3 storeys, 25 units, built 1960).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

4 records on file: more than at 88% of Toronto houses (median 0).

  • By-law investigation26 172690 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 309 MOUNT PLEASANT RD
  • By-law investigation26 172689 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 309 MOUNT PLEASANT RD
  • Building permit20 233655Inspection

    Repair for unit due to fire damage

    Feb 10, 2021 · 309 MOUNT PLEASANT RD
  • Building permit03 140334Closed

    repair underground parking garage slab.

    Jun 19, 2003 · 309 MOUNT PLEASANT RD

Check before you build

  • Site-specific exception 900.2.10(728)

    Needs a closer look

    3 site-specific rules and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(728)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    Any addition or extension above the first storey of a lawfully existing detached house must comply with the minimum building setbacks required by this By-law; [TO: 438-86; 12 (2) 193]

  2. Rule B

    The lands must comply with exception 900.2.10(5)

  3. Rule C

    The minimum lot frontage for a lot with one of the following residential building types is: (i) 9.0 metres for a detached house ; (ii) 7.5 metres for each dwelling unit in a semi-detached house ; and (iii) 9.0 metres for a duplex . [TO: 438-86; 6(3), Part VII, 1.(i) and Appendix 'B']

  4. Older by-law A

    Section 12(2) 262 of former City of Toronto By-law 438-86.

By-law 569-2013, Chapter 900

Lot facts

Area
983 m²
Frontage
22.6 m
Depth
44 m
Street
St Clair Ave E
Corner lot
Yes, also on Mount Pleasant Rd44 m along it
Public lane
None
House footprint
492 m²roof up to 31.8 m
Back yard
7.5 mhouse to rear lot line
Side yards
2.3 m and 3.2 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
12 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Yonge-St. Clair Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone R (u4; d0.6) (x728) (Residential). Chapter 10, section 10.10 of the by-law. Source
  • 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: linden (66 cm), lilac, japanese (8 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
91%39 of 43 decisions
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
4
Development applications
0

Within 300 m, last 10 years. 5 suite and multiplex permits: more than at 59% of Toronto houses (median 3). 43 variance decisions: more than at 78% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new one-storey ancillary building (shed and bicycle parking spaces) with a side (south) carport (canopy with green roof) in the rear yard. The existing rear detached ancillary building (garage) will be demolished.

    280 ST CLAIR AVE E · Nov 4, 2026 · 60 m away
  • Minor varianceApproved

    To legalize and to maintain the existing rear one-storey detached ancillary building (Cabana) with a canopy, which was constructed without an authorized building permit.

    28 GLENROSE AVE · Nov 4, 2026 · 223 m away
  • Minor varianceApproved

    To widen the existing front yard driveway and to construct a new side (east) retaining wall. The existing side (east) retaining wall will be demolished.

    144 HUDSON DR · Nov 4, 2026 · 465 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey detached dwelling by constructing a third storey north side dormer addition.

    67 WELLAND AVE · Oct 7, 2026 · 308 m away
  • Minor varianceRefused

    To construct a new three-storey detached dwelling (houseplex) with a front ground floor landing with stairs, a rear basement walkout, and three rear platforms (stair landings on all three levels) with rear exterior staircases (leading to all levels). Also, to construct a new rear two-storey detached ancillary building containing one garden suite, and a side (east) permeable paver walkway connecting the ancillary building with the front sidewalk. There will be a total of seven residential dwelling units on this lot (six units within the main building, and one unit within the ancillary building).

    99 GLENROSE AVE · Oct 7, 2026 · 101 m away

Latest activity nearby

  • Zoning review

    Not Started

    131 ROSE PARK DR · Nov 13, 2026 · 126 m away
  • Minor varianceApproved

    To construct a new one-storey ancillary building (shed and bicycle parking spaces) with a side (south) carport (canopy with green roof) in the rear yard. The existing rear detached ancillary building (garage) will be demolished.

    280 ST CLAIR AVE E · Nov 4, 2026 · 60 m away
  • Minor varianceApproved

    To legalize and to maintain the existing rear one-storey detached ancillary building (Cabana) with a canopy, which was constructed without an authorized building permit.

    28 GLENROSE AVE · Nov 4, 2026 · 223 m away
  • Building permit

    Interior renovation to the ground and second floor and small two storey rear addition

    61 CLIFTON RD · Oct 21, 2026 · 92 m away
  • Building permit

    Permit the existing front porch with stairs, the front driveway, and the rear third storey balcony of the existing three-storey detached dwelling, which were constructed beyond the limits of an authorized building permit (20 21 217760 BLD 00 SR). and a basement bar sink

    101 GLENROSE AVE · Oct 19, 2026 · 98 m away
  • Building permit

    Proposal for new fire alarm system and garbage chute sprinkler.

    171 ST CLAIR AVE E · Oct 14, 2026 · 259 m away
  • Building permit

    REV 03: Revisions as per bubbled changes to banquette.REV02: Proposed revision to bathroom in basementREV01 : Drawings Revision for 25140683 BLDProposal for additions and interior alterations.

    42 GARFIELD AVE · Oct 13, 2026 · 261 m away
  • Minor varianceRefused

    To construct a new three-storey detached dwelling (houseplex) with a front ground floor landing with stairs, a rear basement walkout, and three rear platforms (stair landings on all three levels) with rear exterior staircases (leading to all levels). Also, to construct a new rear two-storey detached ancillary building containing one garden suite, and a side (east) permeable paver walkway connecting the ancillary building with the front sidewalk. There will be a total of seven residential dwelling units on this lot (six units within the main building, and one unit within the ancillary building).

    99 GLENROSE AVE · Oct 7, 2026 · 101 m away
  • Building permit

    Proposal for a rear third storey addition and renovation of 2nd floor existing bathrrom.

    323 MOUNT PLEASANT RD · Oct 7, 2026 · 92 m away
  • Building permitsecondary suite

    Proposed interior alterations to create a basement suite.

    325 MOUNT PLEASANT RD · Oct 2, 2026 · 97 m away

Neighbourhood: Rosedale-Moore Park

About the area around the lot, not the lot itself.

Nearest station
St Clair Station14 min walk
Nearest TTC stop
St Clair Ave East at Mt Pleasant Rd West Side1 min walk
Nearest cycling route
Inglewood DrSharrows - Wayfinding, 3 min walk
Nearest traffic count
37,636 vehicles in 14 hMount Pleasant Rd / St Clair Ave E, 40 m away, Oct 30, 2024
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Loring - Wyle Parkette1 min walk
Moorevale Park5 min walk
David A. Balfour Park5 min walk

Schools within 1 km

  • OUR LADY OF PERPETUAL HELP CATHOLIC ELEMENTARY SCHOOL English Separate 6 min walk
  • WHITNEY JR PUBLIC SCHOOL English Public 8 min walk
  • DEER PARK JR & SR PUBLIC SCHOOL English Public 11 min walk
  • THE LINDEN SCHOOL Private 14 min walk
  • SUNNYBROOK SCHOOL Private 16 min walk
  • THE YORK SCHOOL - JR CAMPUS Private 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureRosedale-Moore ParkMedian neighbourhood
Median household income (2020)$122,000$84,500
Households that own their home58%54%
Population (2021)20,08016,813
Homes built in 1960 or before46%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleRosedale-Moore ParkCity median
Assault1080.4636.3
Robbery86.869.5
Auto theft199.6192.6
Theft over $5,00065.146.1
Break and enter455.6172.8
Theft from vehicles182.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.