HousePrecheckCheck an address

309 George StToronto · zoning, lot size and permit records

Institutional · I (x4)6.3 × 42.4 m262 m²on George Stbacks onto Ln S Gerrard E George

Not a home

An institution

The zoning by-law sets this parcel aside for an institution. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • An institutionVisitors, traffic and parking in its busy hours.
  • Permits or applications open on this parcelRecent records on this lot: 25 239940 STE 13 OZ (Lift the Hold application related to a new 10-storey building, containing 80 emergency..., 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • 11 development applications open within 300 m, up to 60 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: CollegeThe City plans more homes around the station: good for transit, and more building over time.
N10 m
6.3 m frontage42.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: designated (Part IV)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • Work or applications in progress

    Good to know

    Recent records on this lot: 25 239940 STE 13 OZ (Lift the Hold application related to a new 10-storey building, containing 80 emergency..., 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 11 development applications open within 300 m

    Good to know

    11 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 60 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

3 records on file: more than at 81% of Toronto houses (median 0).

  • Development application25 239940 STE 13 OZUnder Review

    Lift the Hold application related to a new 10-storey building, containing 80 emergency shelter beds, 100 transitional shelter beds, 124 long-term care beds, 70 supportive housing units, and a 2,269 square metre community hub. The proposal would replace the existing Seaton House men's shelter. For more information about the proposal, go to: www.toronto.ca/george-street-revitalization

    Oct 15, 2025 · 309 GEORGE ST · City file
  • Development application25 112155 STE 13 OZClosed

    Proposed Amendment of Official Plan and Zoning By-law to permit a new 10-storey building, containing 80 emergency shelter beds, 100 transitional shelter beds, 124 long-term care beds, 70 supportive housing units, and a 2,269 square metre community hub. The proposal would replace the existing Seaton House men's shelter. For more information about the proposal, go to: www.toronto.ca/george-street-revitalization

    Feb 3, 2025 · 309 GEORGE ST · City file
  • Development application16 111311 STE 27 OZClosed

    Proposal for an Offical Plan and Rezoning Amendment to permit a 9 storey institutional building that will provide 378 bed long-term care, 130 bed transitional assisted living, 100 bed emergency shelter, and 21 units of affordable housing along with a 4,000 sq m community service hub

    Feb 1, 2016 · 309 GEORGE ST · City file

Check before you build

  • Site-specific exception 900.30.10(4)

    Needs a closer look

    22 site-specific rules and 22 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.30.10(4)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    On 295, 297, 299, 301A, 303, 305, 309, 311, 315, 339 and 349 George Street, none of the regulations of 80.10.20.10, 80.10.20.20, 80.10.20.100(12), 80.10.20.100(13), 80.10.20.100(14), 80.10.40.10(2), 80.10.40.60(2), 80.10.50.10(2), 150.20.30.1.1(A) and 150.22.30.1(1) prevent the erection or use of a building , structure , addition or enlargement permitted in compliance with

  2. Rule B

    to (T) below; (B) Despite 80.10.40.10(2), any building or structure erected on the lands must not exceed the height in metres specified by the numbers following the symbol "H" on Diagram 3a and Diagram 3b of By-law 1253-2017

  3. Rule C

    Despite regulation 80.5.40.10(1), height of a building or structure is the distance between the Canadian Geodetic Datum elevation of 91.58 metres and the elevation of the highest point of the building or structure

  4. Rule D

    Despite sections 150.15, 150.20 and 150.22, a crisis care shelter , residential care home and a municipal shelter are permitted to be in the same building

  5. Rule E

    Despite article 80.10.20, a maximum of 21 dwelling units in a mixed use building and an office are permitted uses

  6. Rule F

    Despite regulation 80.10.40.70(1), a building or structure erected on the lands must be located entirely within the area delineated by heavy lines on Diagram 3a and Diagram 3b of By-law 1253-2017

  7. Rule G

    Despite (F) above, enclosed building connections are permitted to extend beyond the heavy lines on Diagram 3a and Diagram 3b of By-law 1253-2017 if the height of the connection is no higher than the underside of the eaves of the heritage site

  8. Rule H

    Despite regulation 80.10.40.60(1), no portion of any building or structure above-grade may extend beyond the heavy lines of the area identified as Area A on Diagram 4a of By-law 1253-2017, with the exception of: (i) canopies on the west elevation up to maximum height of up to 5.0 metre above average grade may encroach a maximum of 5.6 metres into the minimum required building setback

  9. Rule I

    Despite (F) above, on the west elevation of the area identified as Area B on Diagram 4a of By-law 1253-2017: (i) for the portion of any building between a height of 12.0 metres and 31.99 metres above average grade : (a) a minimum of 53 percent of the length of the main wall must be set back at least 2.0 metres from the exterior face of the main wall of the storey directly below it; (b) a minimum of 29 percent of the length of the main wall must be set back at least 1.0 metre from the exterior face of the main wall of the storey directly below it, and (c) a maximum of 18 percent of the length of the main wall may be set back at least 0.5 metres from the exterior face of the main wall of the storey directly below it; (ii) for the portion of any building with a height equal to or greater than 32.0 metres above average grade : (a) a minimum of 60 percent of the length of the main wall must be set back at least 4.5 metres from the exterior face of the main wall of the highest storey directly below it; (iii) any parapet wall for a green roof must be set back at least 2.0 metres from the exterior face of the main wall of the storey directly below it

  10. Rule J

    Despite clause 80.10.40.70, on the east elevation of the area identified as Area C on Diagram 4a of By-law 1253-2017: (i) for the portion of any building between 12.0 metres and 31.99 metres above average grade : (a) a minimum of 40 percent of the length of the main wall must be set back at least 3.2 metres from the exterior face of the main wall of the storey directly below it; (b) a minimum of 20 percent of the length of the main wall must be set back at least 2.75 metres from the exterior face of the main wall of the storey directly below it; and (c) a maximum of 40 percent of the length of the main wall may be set back at least 1.5 metres from the exterior face of the main wall of the storey directly below it

  11. Rule K

    Any parapet wall for a green roof in the area identified as Area D on Diagram 4a and Diagram 4b must be set back at least 2.0 metres from the exterior face of the main wall of the storey directly below it

  12. Rule L

    Balconies and terraces are not permitted to extend beyond the areas identified as Area E, Area G and Area H on Diagram 4b of By-law 1253-2017

  13. Rule M

    Balconies or terraces in the area identified as Area F on Diagram 4b of By-law 1253-2017 may extend a maximum of 1.5 metres beyond the lines delineating Area F if the balcony or terrace is at least 12.86 metres above average grade

  14. Rule N

    Despite clause 80.10.40.60, architectural projections in the area identified as Area G on Diagram 4b of By-law 1253-2017 may extend a maximum of 1.2 metres beyond the lines delineating Area G if they are at least 12.3 metres above average grade

  15. Rule O

    Despite clause 80.10.40.60, balconies or terraces on the east elevation of the area identified as Area I on Diagram 4b of By-law 1253-2017: (i) may not exceed a maximum length of 9.0 metres per storey ; and (ii) may extend beyond the lines delineating Area I, if they are set back at least 1.5 metres from the rear lot line and are at least 5.5 metres above average grade

  16. Rule P

    Despite regulations 80.5.40.10(2) and 80.5.75.1(2), no structure or element of a building permitted in said regulations may be located in Area A, Area C, Area E, Area F, Area G, Area H or Area I on Diagram 4a or Diagram 4b of By-law 1253-2017

  17. Rule Q

    Despite (F) above and clause 80.10.40.60, shading devices, eaves, cornices, lighting fixtures, window sills, landscape planters, trellises, stairs, stair enclosures, railings and other minor architectural projections are permitted to extend a maximum of 0.6 metres beyond the heavy lines on Diagram 3a and Diagram 4a of By-law 1253-2017

  18. Rule R

    Despite clause 80.10.40.60, a solar energy device is permitted to extend a maximum of 1.2 metres beyond the heavy lines on Diagram 3a and Diagram 4a of By-law 1253-2017 if it has a height of at least 5.0 metres above average grade

  19. Rule S

    Despite clause 200.5.10.1, at least 161 parking spaces must be provided and maintained

  20. Rule T

    Despite clause 220.5.10.1, at least five loading spaces are required, of which: (i) one Type G loading space must be provided and maintained; (ii) two Type B loading spaces must be provided and maintained; and two Type B loading spaces must be provided and maintained; and (iii) two Type C loading spaces must be provided and maintained

  21. Rule U

    Despite regulation 80.10.50.10(2), a minimum of 2 percent of the area of the lot not covered by a building or structure must be soft landscaping

  22. Rule V

    Despite regulation 80.10.40.40(1), the maximum permitted floor space index is 5.66. Prevailing By-laws and Prevailing Sections: (None Apply)

  23. Older by-law A

    On 295, 297, 299, 301A, 303, 305, 309, 311, 315, 339 and 349 George Street, none of the regulations of 80.10.20.10, 80.10.20.20, 80.10.20.100(12), 80.10.20.100(13), 80.10.20.100(14), 80.10.40.10(2), 80.10.40.60(2), 80.10.50.10(2), 150.20.30.1.1(A) and 150.22.30.1(1) prevent the erection or use of a building , structure , addition or enlargement permitted in compliance with

  24. Older by-law B

    to (T) below; (B) Despite 80.10.40.10(2), any building or structure erected on the lands must not exceed the height in metres specified by the numbers following the symbol "H" on Diagram 3a and Diagram 3b of By-law 1253-2017

  25. Older by-law C

    Despite regulation 80.5.40.10(1), height of a building or structure is the distance between the Canadian Geodetic Datum elevation of 91.58 metres and the elevation of the highest point of the building or structure

  26. Older by-law D

    Despite sections 150.15, 150.20 and 150.22, a crisis care shelter , residential care home and a municipal shelter are permitted to be in the same building

  27. Older by-law E

    Despite article 80.10.20, a maximum of 21 dwelling units in a mixed use building and an office are permitted uses

  28. Older by-law F

    Despite regulation 80.10.40.70(1), a building or structure erected on the lands must be located entirely within the area delineated by heavy lines on Diagram 3a and Diagram 3b of By-law 1253-2017

  29. Older by-law G

    Despite (F) above, enclosed building connections are permitted to extend beyond the heavy lines on Diagram 3a and Diagram 3b of By-law 1253-2017 if the height of the connection is no higher than the underside of the eaves of the heritage site

  30. Older by-law H

    Despite regulation 80.10.40.60(1), no portion of any building or structure above-grade may extend beyond the heavy lines of the area identified as Area A on Diagram 4a of By-law 1253-2017, with the exception of: (i) canopies on the west elevation up to maximum height of up to 5.0 metre above average grade may encroach a maximum of 5.6 metres into the minimum required building setback

  31. Older by-law I

    Despite (F) above, on the west elevation of the area identified as Area B on Diagram 4a of By-law 1253-2017: (i) for the portion of any building between a height of 12.0 metres and 31.99 metres above average grade : (a) a minimum of 53 percent of the length of the main wall must be set back at least 2.0 metres from the exterior face of the main wall of the storey directly below it; (b) a minimum of 29 percent of the length of the main wall must be set back at least 1.0 metre from the exterior face of the main wall of the storey directly below it, and (c) a maximum of 18 percent of the length of the main wall may be set back at least 0.5 metres from the exterior face of the main wall of the storey directly below it; (ii) for the portion of any building with a height equal to or greater than 32.0 metres above average grade : (a) a minimum of 60 percent of the length of the main wall must be set back at least 4.5 metres from the exterior face of the main wall of the highest storey directly below it; (iii) any parapet wall for a green roof must be set back at least 2.0 metres from the exterior face of the main wall of the storey directly below it

  32. Older by-law J

    Despite clause 80.10.40.70, on the east elevation of the area identified as Area C on Diagram 4a of By-law 1253-2017: (i) for the portion of any building between 12.0 metres and 31.99 metres above average grade : (a) a minimum of 40 percent of the length of the main wall must be set back at least 3.2 metres from the exterior face of the main wall of the storey directly below it; (b) a minimum of 20 percent of the length of the main wall must be set back at least 2.75 metres from the exterior face of the main wall of the storey directly below it; and (c) a maximum of 40 percent of the length of the main wall may be set back at least 1.5 metres from the exterior face of the main wall of the storey directly below it

  33. Older by-law K

    Any parapet wall for a green roof in the area identified as Area D on Diagram 4a and Diagram 4b must be set back at least 2.0 metres from the exterior face of the main wall of the storey directly below it

  34. Older by-law L

    Balconies and terraces are not permitted to extend beyond the areas identified as Area E, Area G and Area H on Diagram 4b of By-law 1253-2017

  35. Older by-law M

    Balconies or terraces in the area identified as Area F on Diagram 4b of By-law 1253-2017 may extend a maximum of 1.5 metres beyond the lines delineating Area F if the balcony or terrace is at least 12.86 metres above average grade

  36. Older by-law N

    Despite clause 80.10.40.60, architectural projections in the area identified as Area G on Diagram 4b of By-law 1253-2017 may extend a maximum of 1.2 metres beyond the lines delineating Area G if they are at least 12.3 metres above average grade

  37. Older by-law O

    Despite clause 80.10.40.60, balconies or terraces on the east elevation of the area identified as Area I on Diagram 4b of By-law 1253-2017: (i) may not exceed a maximum length of 9.0 metres per storey ; and (ii) may extend beyond the lines delineating Area I, if they are set back at least 1.5 metres from the rear lot line and are at least 5.5 metres above average grade

  38. Older by-law P

    Despite regulations 80.5.40.10(2) and 80.5.75.1(2), no structure or element of a building permitted in said regulations may be located in Area A, Area C, Area E, Area F, Area G, Area H or Area I on Diagram 4a or Diagram 4b of By-law 1253-2017

  39. Older by-law Q

    Despite (F) above and clause 80.10.40.60, shading devices, eaves, cornices, lighting fixtures, window sills, landscape planters, trellises, stairs, stair enclosures, railings and other minor architectural projections are permitted to extend a maximum of 0.6 metres beyond the heavy lines on Diagram 3a and Diagram 4a of By-law 1253-2017

  40. Older by-law R

    Despite clause 80.10.40.60, a solar energy device is permitted to extend a maximum of 1.2 metres beyond the heavy lines on Diagram 3a and Diagram 4a of By-law 1253-2017 if it has a height of at least 5.0 metres above average grade

  41. Older by-law S

    Despite clause 200.5.10.1, at least 161 parking spaces must be provided and maintained

  42. Older by-law T

    Despite clause 220.5.10.1, at least five loading spaces are required, of which: (i) one Type G loading space must be provided and maintained; (ii) two Type B loading spaces must be provided and maintained; and two Type B loading spaces must be provided and maintained; and (iii) two Type C loading spaces must be provided and maintained

  43. Older by-law U

    Despite regulation 80.10.50.10(2), a minimum of 2 percent of the area of the lot not covered by a building or structure must be soft landscaping

  44. Older by-law V

    Despite regulation 80.10.40.40(1), the maximum permitted floor space index is 5.66. Prevailing By-laws and Prevailing Sections: (None Apply)

By-law 569-2013, Chapter 900

Lot facts

Area
262 m²
Frontage
6.3 m
Depth
42.4 m
Street
George St
Corner lot
No
Public lane
Ln S Gerrard E George, 6.1 m along it
House footprint
78 m²
Back yard
6.6 mhouse to rear lot line
Side yards
0 m and 0.1 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
5house, garage, sheds
Max height
12 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: College. The lot is inside the College Major Transit Station Area approved by the Province (Site and Area Specific Policy 603). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone I (x4) (Institutional). Chapter 80, section 80.10 of the by-law. Source

Around this lot

Minor variances approved
95%19 of 20 decisions
Garden suite permits
1
Laneway suite permits
1
Multiplex permits
10
Development applications
30

Within 300 m, last 10 years. 12 suite and multiplex permits: more than at 78% of Toronto houses (median 3). 20 variance decisions: more than at 51% of Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Installation of new vertical condensate drain risers to collect condensate from existing piping outlets at the balconies

    145 MUTUAL ST · Nov 20, 2026 · 206 m away
  • Building permit

    Proposal for interior alterations of existing commercial unit to a medical clinic and prescription pharmacy with Level B compounding room.

    231 DUNDAS ST E · Nov 19, 2026 · 173 m away
  • Building permit

    Proposal to construct pedestrian ramp.

    117 PEMBROKE ST · Oct 27, 2026 · 165 m away
  • Minor varianceApproved

    To construct a new four-storey apartment building with a west side courtyard area at the centre of the building, a front (north) green roof, and a maintenance equipment storage area on the roof level. There will be a total of 17 bicycle parking spaces on the lot and no vehicular parking spaces will be provided. Also, to construct a rear one-storey detached ancillary building (waste storage enclosure) on the southwest corner on the lot. There will be a total of 15 residential dwelling units (12 studio units and 3 one bedroom units) on the lot.

    185 GERRARD ST E · Oct 14, 2026 · 207 m away
  • Building permit

    Proposal for replacement of existing 1-1/2" Watts 375XL reduced pressure (RP) backflow prevention device serving existing high-rise condominium building. Device located in PH mechanical room.

    181 DUNDAS ST E · Oct 8, 2026 · 234 m away
  • Building permit

    Proposal to replace existing make-up air unit and associated structural reinforcement work.

    192 JARVIS ST · Oct 2, 2026 · 293 m away
  • Building permit

    Proposal to replace roof top mounted mechanical units.

    311 JARVIS ST · Oct 1, 2026 · 89 m away
  • Building permit

    Proposal for interior alterations to retail unit (alterations to interior finishes, accessibity upgrades, replacement of exterior doors and mechanical system upgrades).

    310 DUNDAS ST E · Sep 28, 2026 · 258 m away
  • Building permit

    Balcony Remedial work - Isolated conc. repair and brick masonry repair, Installation of new waterproofing system, Replace existing balcony guardrail with new.Convenience address is 279 Jarvis St

    257 JARVIS ST · Sep 25, 2026 · 162 m away
  • Building permit

    Proposal to replace existing make-up air unit and associated structural reinforcement work.

    192 JARVIS ST · Sep 16, 2026 · 293 m away

Neighbourhood: Moss Park

About the area around the lot, not the lot itself.

Nearest station
TMU Station10 min walk
Nearest TTC stop
Sherbourne St at Dundas St East North Side4 min walk
Nearest cycling route
Sherbourne StCycle Track, 3 min walk
Nearest traffic count
14,566 vehicles in 8 hJarvis St: Dundas St E - Gerrard St E, 120 m away, Jun 17, 2010
Serious collisions within 500 m
222021–2026, killed or seriously injured: 3 fatal, 17 with pedestrians, 2 with cyclists
Parks
Allan Gardens3 min walk
Arena Gardens6 min walk
Moss Park7 min walk

Schools within 1 km

  • ECOLE ELEMENTAIRE GABRIELLE ROY French Public 5 min walk
  • TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 6 min walk
  • TMU - HEIDELBERG CENTRE SCHOOL OF GRAPHIC COMM'NS MGMT University 7 min walk
  • TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF IMAGE ARTS University 8 min walk
  • TORONTO METROPOLITAN UNIVERSITY - THEATRE SCHOOL University 8 min walk
  • ST MICHAEL'S CHOIR SCHOOL - SECONDARY English Separate 8 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMoss ParkMedian neighbourhood
Median household income (2020)$65,000$84,500
Households that own their home35%54%
Population (2021)21,49016,813
Homes built in 1960 or before17%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMoss ParkCity median
Assault2226.8636.3
Robbery166.669.5
Homicide3.45.3
Shootings3.410.5
Auto theft81.6192.6
Theft over $5,00064.646.1
Break and enter350.2172.8
Theft from vehicles275.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.