HousePrecheckCheck an address

3089 Bathurst StToronto · zoning, lot size and permit records

Also 3083 Bathurst St, 3085 Bathurst St, 3087 Bathurst St, 3091 Bathurst St, 3093 Bathurst St and 2 more

Commercial residential · CR 1.0 (c1.0; r1.0) SS3 (x90)61.3 × 71.4 m3,749 m²on Glengarry Avecorner, also on Bathurst St

Not a home

A commercial or mixed-use building

8 different civic addresses share this parcel, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelStill open in the City's records: 13 131525 (Ground floor - UPS Store, 2013, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 1 development application open within 300 m, up to 40 storeysNew buildings may go up around here in the next years. More change nearby than at 55% of Toronto houses.
N20 m
61.3 m frontage71.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2013

    Needs a closer look

    Still open in the City's records: 13 131525 (Ground floor - UPS Store, 2013, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 40 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

15 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit18 122425Closed

    Non-substantial alteration to an existing third party roof sign, seeking to reduce each of the two sign faces (of a two-faced v-shaped formation) from 10' x 40' to 10' x 20' static , consistent with the 1998 issued permit.**DS ONLY** **Pattison Outdoor**

    Mar 14, 2018 · 3089 BATHURST ST
  • Zoning review15 181374 LTOClosed
    Jun 26, 2015 · 3089 BATHURST ST
  • Zoning review14 209835 LTOClosed
    Aug 21, 2014 · 3091 BATHURST ST
  • Building permit13 154963Closed

    To erect and display an illuminated static copy wall sign at the westerly elevation of the building in conjunction with an existing parcel delivery business operating on the premises. **UPS**

    Sep 25, 2013 · 3093 BATHURST ST
  • Building permit13 131525Inspection

    Ground floor - UPS Store

    Apr 4, 2013 · 3093 BATHURST ST
  • Zoning review12 251967 LTOClosed
    Sep 24, 2012 · 3083 BATHURST ST
  • Building permit10 215139Closed

    Backflow prevention device

    Jul 28, 2010 · 3089 BATHURST ST
  • Zoning review09 197975 LTOClosed
    Dec 18, 2009 · 3083 BATHURST ST
Show 7 older records
  • Zoning review09 172744 LPRClosed
    Sep 24, 2009 · 3085 BATHURST ST
  • Building permit09 153088Closed

    Subway Restaurant

    Sep 1, 2009 · 3085 BATHURST ST
  • Zoning review09 128021 LTOClosed
    Apr 21, 2009 · 3093 BATHURST ST
  • Zoning review09 107828 LTOClosed
    Feb 9, 2009 · 3097 BATHURST ST
  • Zoning review07 263472 LTOClosed
    Sep 20, 2007 · 3097 BATHURST ST
  • Zoning review07 263444 LTOClosed
    Sep 20, 2007 · 3097 BATHURST ST
  • Building permit98 251367Closed

    PART/FIN ''MONEY MART''

    Aug 25, 1999 · 3083 BATHURST ST

Check before you build

  • Site-specific exception 900.11.10(90)

    Needs a closer look

    1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(90)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    Despite regulations to the contrary, the permitted uses do not include a hotel , custom workshop , vehicle dealership , car rental agency, vehicle fuel station , vehicle service shop , vehicle washing establishment and a funeral home . Prevailing By-laws and Prevailing Sections: (A) Schedule 'D' Airport Hazard Map from City of North York zoning by-law 7625.

  2. Older by-law A

    Despite regulations to the contrary, the permitted uses do not include a hotel , custom workshop , vehicle dealership , car rental agency, vehicle fuel station , vehicle service shop , vehicle washing establishment and a funeral home . Prevailing By-laws and Prevailing Sections: (A) Schedule 'D' Airport Hazard Map from City of North York zoning by-law 7625.

By-law 569-2013, Chapter 900

Lot facts

Area
3,749 m²
Frontage
61.3 m
Depth
71.4 m
Street
Glengarry Ave
Corner lot
Yes, also on Bathurst St71.4 m along it
Public lane
None
House footprint
1,241 m²roof up to 19.8 m
Back yard
7.4 mhouse to rear lot line
Side yards
16 m and 18.8 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
10.5 m
Max lot coverage
33%

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone CR 1.0 (c1.0; r1.0) SS3 (x90) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
  • 9 City trees in front of this lot. The City's street tree inventory lists 9 trees at this address: apple, sargents (30 cm), apple, sargents (25 cm), elm, siberian (16 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%28 of 28 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
2
Development applications
1

Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 28 variance decisions: more than at 60% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To help facilitate in the construction of a 9-storey building with 27 residential units, 1 office unit, and 1 retail unit. Please note, this application was previously deferred Thursday, June 12, 2025.

    2989 BATHURST ST · Jan 22, 2026 · 388 m away
  • Minor varianceApproved

    To provide fire rated accessible recycling & organic garbage room in Under Ground Parking Garage in order to comply with fire code notice. The proposed Garbage Room will take three existing parking spaces in the Under Ground Parking Lot. NOTE: This application was previously deferred at the Committee of Adjustment hearing on June 20, 2024.

    3036-3050 BATHURST ST · Apr 3, 2025 · 224 m away
  • Minor varianceApproved

    Proposal for a 5-storey mixed-use building with ground floor retail and office uses. Please note, the application was deferred on January 18, 2024, to allow the applicant to discuss with Transportation Services.

    3177-3179 BATHURST ST · Nov 21, 2024 · 251 m away
  • Minor varianceApproved

    To construct a one storey addition to the rear of the existing retail store (plaza)

    3011 BATHURST ST · Dec 10, 2015 · 292 m away

Latest activity nearby

  • Zoning review

    Not Started

    3193 BATHURST ST · Nov 25, 2026 · 294 m away
  • Building permit

    INTERIOR ALTERATION OF EXISTING MEDICAL OFFICE

    491 LAWRENCE AVE W · Oct 27, 2026 · 162 m away
  • Building permit

    backwater valve installation

    625 BEDFORD PARK AVE · Oct 8, 2026 · 257 m away
  • Building permitsecondary suite

    SECOND FLOOR ADDITION (219.73sq.m); GROUND FLOOR ADDITION (68.21sq.m); BASEMENT INTERIOR ALTERATIONS (100sq.m); GROUND FLOOR INTERIOR ALTERATIONS (80sq.m); NEW SECONDARY SUITE IN THE BASEMENT

    68 STORMONT AVE · Aug 31, 2026 · 241 m away
  • Zoning review

    Closed

    507 LAWRENCE AVE W · Jul 7, 2026 · 187 m away
  • Building permit

    Proposed interior alterations to include interior partitions, window replacement and additional plumbing fixtures.

    473 LAWRENCE AVE W · Jul 3, 2026 · 198 m away
  • Zoning review

    Closed

    491 GLENCAIRN AVE · Jun 17, 2026 · 282 m away
  • Building permit

    Proposed interior alterations to existing restaurant - United Bakers

    506 LAWRENCE AVE W · Jun 5, 2026 · 146 m away
  • Minor varianceApproved

    To construct a second storey addition to the existing dwelling, a two-storey addition to the rear of the dwelling and a secondary suite in the basement in conjunction with other interior and exterior alterations.

    68 STORMONT AVE · Jun 4, 2026 · 241 m away
  • Building permitdemolition, multiplex

    TO DEMOLISH EXISTING 1.STOREY SINGLE FAMILY HOME AND TO BUILD A NEW TWO STOREY DUPLEX DWELLING WITH INTEGRAL GARAGE

    511 DOUGLAS AVE · Jun 4, 2026 · 256 m away

Neighbourhood: Bedford Park-Nortown

About the area around the lot, not the lot itself.

Nearest station
Lawrence West Station21 min walk
Nearest TTC stop
Bathurst St at Douglas Ave1 min walk
Nearest cycling route
Prince Charles DrSigned Route (No Pavement Markings), 8 min walk
Nearest traffic count
24,514 vehicles in 14 hBathurst St / Covington Rd / Douglas Ave, 60 m away, May 9, 2026
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 1 with cyclists
Parks
Woburn Park - North York4 min walk
Dell Park8 min walk
Prince Charles Park8 min walk

Schools within 1 km

  • YESHIVA NACHALAS ZVI SCHOOL Private 3 min walk
  • BAIS YAAKOV ELEMENTARY SCHOOL Private 3 min walk
  • TIFERES BAIS YAAKOV HIGH SCHOOL Private 4 min walk
  • YESHIVAS NEFESH DOVID SCHOOL Private 4 min walk
  • CLOVER SCHOOL MIDTOWN - ELEMENTARY CAMPUS Private 5 min walk
  • YESHIVA YESODEI HATORAH SCHOOL Private 7 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureBedford Park-NortownMedian neighbourhood
Median household income (2020)$135,000$84,500
Households that own their home68%54%
Population (2021)22,14516,813
Homes built in 1960 or before33%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleBedford Park-NortownCity median
Assault230.1636.3
Robbery59.569.5
Auto theft150.8192.6
Theft over $5,00067.446.1
Break and enter250172.8
Theft from vehicles198.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.