Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Heritage property: in a Heritage Conservation District (Part V)
Needs a closer lookOn the City's Heritage Register. Demolition and exterior changes need heritage review.
What it means. Renovations, additions and demolition can take longer, cost more or be refused.
How to confirm. Heritage Planning at the City confirms the status and what it covers. Details
City of Toronto Heritage RegisterWork or applications in progress
Good to knowRecent records on this lot: SYS 5952850 (2026); 26 167772 STE 13 SA (Site Plan Approval for an 11-storey mixed-use building containing 228 market and afford..., 2026).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications3 development applications open within 300 m
Good to know3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 26 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
10 records on file: more than at 99% of Toronto houses (median 0).
- Minor varianceSYS 5952850PendingNov 10, 2026 · 306 GERRARD ST E
- Zoning review26 167772 PSPClosedOct 7, 2026 · 306 GERRARD ST E
- Zoning review26 240222 ZAPNotice SentSep 18, 2026 · 306 GERRARD ST E
- Zoning review26 238968 ZAPCancelledSep 17, 2026 · 306 GERRARD ST E
- Development application26 167772 STE 13 SAUnder Review
Site Plan Approval for an 11-storey mixed-use building containing 228 market and affordable residential units, plus office and community program space.
May 26, 2026 · 306 GERRARD ST E · City file - Zoning review22 106814 POZClosedFeb 23, 2022 · 306 GERRARD ST E
- Development application22 106814 STE 13 OZClosed
Official Plan and zoning by-law amendment application to facilitate the redevelopment of the site for a 10-storey mixed-use building having a non-residential gross floor area of 4190 square metres and a residential gross floor area of 14,420 square metres. 194 rental dwelling units are proposed.
Jan 24, 2022 · 306 GERRARD ST E · City file - Building permit09 103050Closed
Proposal for the installation of a single zone fire alarm on the ground floor.
Feb 2, 2009 · 306 GERRARD ST E
Show 2 older records
- Building permit08 198031Closed
HVAC - Interior alterations to entire building, convert from 'Goodwill' retail to Offices. New side entrance and canopy.
Oct 6, 2008 · 306 GERRARD ST E - Building permit97 014757Closed
MAKE INTERIOR ALTERATIONS FOR RETAIL USE
Apr 24, 1997 · 306 GERRARD ST E
Check before you build
Site-specific exception 900.11.10(2362)
Needs a closer look2 site-specific rules and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 132 of former City of Toronto By-law 438-86
- Rule B
Section 12(2) 270(a) of former City of Toronto By-law 438-86
- Older by-law A
These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 132 of former City of Toronto By-law 438-86
- Older by-law B
Section 12(2) 270(a) of former City of Toronto By-law 438-86
2 parts for other addresses
- C On 520 Parliament St., the even numbered addresses of 44-46 Winchester St., City of Toronto by-law 548-87.
- C On 520 Parliament St., the even numbered addresses of 44-46 Winchester St., City of Toronto by-law 548-87.
Lot facts
- Area
- 1,470 m²
- Frontage
- 31.7 mestimated, irregular lot
- Depth
- 63.6 mestimated, irregular lot
- Street
- Gerrard St E
- Corner lot
- No
- Public lane
- None
- House footprint
- 1,047 m²roof up to 9.8 m
- Back yard
- 10.9 mhouse to rear lot line
- Side yards
- 0.8 m and 0.9 mhouse to side lot lines
- Buildings on the lot
- 1house, garage, sheds
- Max height
- 14 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 2.0 (c1.0; r2.0) SS2 (x2362) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
Around this lot
- Minor variances approved
- 100%35 of 35 decisions
- Garden suite permits
- 1
- Laneway suite permits
- 3
- Multiplex permits
- 13
- Development applications
- 8
Within 300 m, last 10 years. 17 suite and multiplex permits: more than at 85% of Toronto houses (median 3). 35 variance decisions: more than at 69% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the existing two-and-one-half semi-detached building (houseplex), which is currently under construction (Building Permit 25 258356 BLD), by constructing a side (east) basement walkout with a flat roof canopy. Also, to maintain the existing rear second storey roof deck with stairs, and third storey roof deck. There will be two existing units and two new units for a total of four residential dwelling units on this lot (one unit occupying the basement level, two units occupying the first level, and one unit occupying the second and third levels).
183 CARLTON ST · Jul 22, 2026 · 391 m away - Minor varianceApproved
To alter the existing three-storey mixed-use building by converting the storage room on the second and third levels into seven additional hostel suites (three on the second level, and four on the third level). The existing pharmacy and cafeteria on the ground level, 19 hostel suites on the second level, and 20 hostel suites on the third level will be maintained and unaltered.
311 SHERBOURNE ST · Jun 3, 2026 · 449 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 141-2005 (as amended by By-laws 1325-2023 and 1392-2024)) for a mixed-use building encompassing Tower D and including a podium/base building on the lands between Dreamer¿s Way and Street G, in regards to the phasing requirements (the construction of Street G, and Sackville Street) and by increasing the height of the mechanical penthouse. A Site Plan Control application (File No. 25 103941 STE 13 SA) is currently under review and consideration. This building will contain 271 affordable rental housing units, and 33,161 m² of residential gross floor area, 913 m² of ground floor retail space, and 1,160 m² of ground floor community space.
325 GERRARD ST E · Oct 1, 2025 · 140 m away - Minor varianceApproved
To alter the existing three-storey semi-detached building (currently vacant and with the front and rear portion of the building, abutting Doctor O Lane, attached below grade) by converting it to a mixed-use building (service hub for the Indigenous community) with four dwelling units and community and office space on the basement, first, and second floors, by constructing front and side (west) basement additions, an enlarged ground floor terrace (at the west portion of the building), three new dormers at the rear portion of the second floor, and a rear second floor balcony at the east portion of the building. There will be a total of four residential dwelling units within this building.
209 CARLTON ST · Jul 30, 2025 · 304 m away - Minor varianceApproved
To alter the existing three-storey commercial building (containing office uses) by converting the west half of the first storey, and the second and third storeys into a hotel use with a common use area located on the ground floor. The existing east half of the building and the existing pharmacy (located on the ground floor) will be maintained. There will be a total of 39 hotel rooms within this mixed-use building.
311 SHERBOURNE ST · May 7, 2025 · 449 m away
Latest activity nearby
- Minor variancePending
To alter the existing three-storey semi-detached dwelling by constructing a rear third storey addition with a deck (above the second storey portion of the dwelling).
309 CARLTON ST · Nov 25, 2026 · 283 m away - Zoning review
Not Started
405 PARLIAMENT ST · Nov 23, 2026 · 42 m away - Building permit
CONSTRUCT 1 HOUR FRR WALL IN BASEMENT TO SEPARATE FIRST FLOOR UNIT FROM BASEMENT UNIT [Basement & first floor separate commercial and 2nd & 3rd Residential)
440 PARLIAMENT ST · Nov 20, 2026 · 142 m away - Building permit
Proposed fire damages repair
223 CARLTON ST · Nov 18, 2026 · 255 m away - Building permit
Proposal to construct a new laneway suite (Unit # R)
9 SPRUCE ST · Nov 12, 2026 · 88 m away - Minor variancePending
In Progress
306 GERRARD ST E · Nov 10, 2026 · 2 m away - Building permit
Minor renovations involving, Installing a 12-foot-wide patio door/screen assembly in an enlarged opening on the second floor; Removing a small section of the partition wall on the ground floor; andRelocating a fire exit door within the existing wall. - Unit A
223 CARLTON ST · Oct 28, 2026 · 255 m away - Building permit
REVISION-01Propose to relocate washer/dryer from ground floor to second-floor mechanical room, convert existing ground-floor enclosure into a washroom, and add a capped plumbing rough-in for a future kitchenette sink.
29 OAK ST · Oct 28, 2026 · 202 m away - Zoning review
Closed
457 PARLIAMENT ST · Oct 12, 2026 · 157 m away - Zoning review
Closed
252 1/2 CARLTON ST · Oct 5, 2026 · 270 m away
Neighbourhood: Cabbagetown-South St.James Town
About the area around the lot, not the lot itself.
- Nearest station
- Castle Frank Station21 min walk
- Nearest TTC stop
- Gerrard St East at Parliament St1 min walk
- Nearest cycling route
- Gerrard St EBike Lane, 1 min walk
- Nearest traffic count
- 18,435 vehicles in 14 hGerrard St E / Parliament St (South), 70 m away, Jul 9, 2024
- Serious collisions within 500 m
- 42021–2026, killed or seriously injured: 1 fatal, 4 with pedestrians, 0 with cyclists
- Parks
- Anniversary Park1 min walk
- Oak Street Parkette3 min walk
- Regent Park5 min walk
Schools within 1 km
- LORD DUFFERIN JR & SR PUBLIC SCHOOL English Public 3 min walk
- SPRUCECOURT JR PUBLIC SCHOOL English Public 5 min walk
- MONSIGNOR FRASER - ST MARTIN CAMPUS English Separate 9 min walk
- WINCHESTER JR & SR PUBLIC SCHOOL English Public 9 min walk
- NELSON MANDELA PARK PUBLIC SCHOOL English Public 11 min walk
- OUR LADY OF LOURDES CATHOLIC ELEMENTARY SCHOOL English Separate 13 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Cabbagetown-South St.James Town | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $76,500 | $84,500 |
| Households that own their home | 45% | 54% |
| Population (2021) | 11,020 | 16,813 |
| Homes built in 1960 or before | 42% | 29% |
| Homes needing major repairs | 9% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Cabbagetown-South St.James Town | City median |
|---|---|---|
| Assault | 1078.6 | 636.3 |
| Robbery | 145.3 | 69.5 |
| Auto theft | 91.8 | 192.6 |
| Theft over $5,000 | 22.9 | 46.1 |
| Break and enter | 321.3 | 172.8 |
| Theft from vehicles | 229.5 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.