HousePrecheckCheck an address

3050 Pharmacy AveToronto · zoning, lot size and permit records

Also 3030 Pharmacy Ave

Residential apartment · RA (d3.25) (x568)90.0 × 213.9 m17,016 m²on 44 Chester Le Blvdcorner, also on Pharmacy Ave

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 18 storeys, 252 rental units, built 1974More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelRecent records on this lot: 26 211757 (Two overhanging illumintated wall sign.***3050 PHARMACY***, 2026); 24 209832 (A new canopy to match existing canopy (replace the existing canopy) will be installed a..., 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • 4 development applications open within 300 m, up to 26 storeysNew buildings may go up around here in the next years. More change nearby than at 96% of Toronto houses.
  • 2 open by-law investigations at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 26 249580 PRS 00 IR (Property Standards, 2026, status Rescheduled); 26 234891 PRS 00 IR (Property Standards, 2026, status Rescheduled).
  • City upkeep score: 97 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N50 m
90.0 m frontage213.9 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 open by-law investigations

    Needs a closer look

    Not resolved in the City's records: 26 249580 PRS 00 IR (Property Standards, 2026, status Rescheduled); 26 234891 PRS 00 IR (Property Standards, 2026, status Rescheduled).

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 2 building permits open, the oldest since 2022

    Needs a closer look

    Still open in the City's records: 24 115794 (Garage Roof Slab and Ramp Repairs, 2024, status Inspection); 22 122566 (Proposal for building envelope and balcony repairs, 2022, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 10 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Property Standards, Zoning): 26 255335 PRS 00 IR (Property Standards, 2026); 26 245100 HEA 00 IR (Adequate Heat, 2026); 26 212833 HEA 00 IR (Adequate Heat, 2026); and 7 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 211757 (Two overhanging illumintated wall sign.***3050 PHARMACY***, 2026); 24 209832 (A new canopy to match existing canopy (replace the existing canopy) will be installed a..., 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 4 development applications open within 300 m

    Good to know

    4 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 26 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 97 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (18 storeys, 252 units, built 1974).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

32 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 255335 PRS 00 IRClosed

    Property Standards

    Oct 15, 2026 · 3050 PHARMACY AVE
  • By-law investigation26 249580 PRS 00 IRRescheduled

    Property Standards

    Oct 5, 2026 · 3050 PHARMACY AVE
  • By-law investigation26 245100 HEA 00 IRClosed

    Adequate Heat

    Sep 27, 2026 · 3050 PHARMACY AVE
  • By-law investigation26 234891 PRS 00 IRRescheduled

    Property Standards

    Sep 9, 2026 · 3050 PHARMACY AVE
  • Building permit26 211757Work Not Started

    Two overhanging illumintated wall sign.***3050 PHARMACY***

    Aug 5, 2026 · 3050 PHARMACY AVE
  • By-law investigation26 212833 HEA 00 IRClosed

    Adequate Heat

    Aug 1, 2026 · 3050 PHARMACY AVE
  • By-law investigation26 170426 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 3050 PHARMACY AVE
  • By-law investigation26 170425 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 3050 PHARMACY AVE
Show 24 older records
  • By-law investigation26 157041 ZON 00 IRClosed

    Zoning

    May 7, 2026 · 3050 PHARMACY AVE
  • By-law investigation26 110749 PRS 00 IRClosed

    Property Standards

    Jan 29, 2026 · 3050 PHARMACY AVE
  • By-law investigation25 261397 HEA 00 IRClosed

    Adequate Heat

    Dec 2, 2025 · 3050 PHARMACY AVE
  • By-law investigation25 243414 PRS 00 IRClosed

    Property Standards

    Oct 22, 2025 · 3050 PHARMACY AVE
  • By-law investigation25 229462 PRS 00 IRClosed

    Property Standards

    Sep 23, 2025 · 3050 PHARMACY AVE
  • Building permit24 209832Inspection

    A new canopy to match existing canopy (replace the existing canopy) will be installed at the rear entrance of the residential building.

    Mar 10, 2025 · 3050 PHARMACY AVE
  • Building permit24 185243Closed

    Fire alarm panel replacement.

    Jul 24, 2024 · 3050 PHARMACY AVE
  • Building permit24 160708Cancelled

    A new canopy will be installed at the rear entrance of the residential building.

    Jun 6, 2024 · 3050 PHARMACY AVE
  • Building permit24 115794Inspection

    Garage Roof Slab and Ramp Repairs

    Mar 25, 2024 · 3050 PHARMACY AVE
  • Building permit21 131292Closed

    Drain - Construct 2 residential apartment buildings, 5 storey podium, 3 storey underground parking garage

    Oct 13, 2022 · 3050 PHARMACY AVE
  • Building permit22 122566Permit Issued

    Proposal for building envelope and balcony repairs.

    Apr 1, 2022 · 3050 PHARMACY AVE
  • Building permit21 174269Closed

    Water discharge trench existing slab on grade within P1 for construction of 2 residential apartment buildings, 5 storey podium, 3 storey underground parking garage

    Dec 31, 2021 · 3050 PHARMACY AVE
  • Building permit21 227962Closed

    Proposal for interior alterations to basement converting storage room, washroom, meeting room to party room, craft area and yoga room, and renovate laundry room for existing residential apartment building

    Nov 16, 2021 · 3050 PHARMACY AVE
  • Building permit21 170377Approved

    Alternative solution to address the standpipe system to be installed in a new sprinklered residential apartment project in the south portion of the property at 3050 Pharmacy Ave. No hose cabinets will be provided from the ground floor upwards where only 65mm dia. hose connections will be provided. However, fire hose stations will be provided in the new basement levels in consideration that hose stations are installed in the basement of the existing tower.

    Jun 14, 2021 · 3050 PHARMACY AVE
  • Zoning review19 253427 PSPClosed
    Jun 3, 2021 · 3050 PHARMACY AVE
  • Zoning review20 214765 LTOCancelled
    Nov 4, 2020 · 3050 PHARMACY AVE
  • Development application19 253427 ESC 22 SAClosed

    Two residential buildings (15 and 16-storeys) connected by a 5 storey podium with shared underground parking which will be connected to the existing rental apartment building.

    Nov 25, 2019 · 3050 PHARMACY AVE · City file
  • Zoning review18 272965 PRZClosed
    Jan 9, 2019 · 3050 PHARMACY AVE
  • Development application18 272965 ESC 22 OZClosed

    New 16 storey, two tower building with 5 storey podium residential building (rental).

    Dec 31, 2018 · 3050 PHARMACY AVE · City file
  • Building permit15 190105Closed

    Replacement of existing dry sprinkler systems in the parking garage level

    Aug 10, 2015 · 3050 PHARMACY AVE
  • Building permit10 110970Closed

    Install 2 backflow preventers

    Mar 1, 2010 · 3050 PHARMACY AVE
  • Building permit01 171916Closed

    Install three antennas to penthouse.

    Sep 10, 2001 · 3050 PHARMACY AVE
  • Building permit01 163436Closed

    To repair fire damage

    Aug 8, 2001 · 3050 PHARMACY AVE
  • Building permit00 335324Closed

    FIRE ALARM,SPRINKLER AND VOICE COM

    Sep 14, 2000 · 3050 PHARMACY AVE

Check before you build

  • Site-specific exception 900.7.10(568)

    Needs a closer look

    18 site-specific rules and 18 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.7.10(568)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    On 3050 Pharmacy Avenue, if the requirements of Section 5 and Schedule A are complied with, a building or structure may be erected and used in compliance with

  2. Rule B

    to (R) below; (B) The buildings and structures permitted on the lot include the "Existing Building" and the "New Building" as shown on Diagram 3 to By-law 48-2021 as follows: (i) for the purposes of this Regulation, "Existing Building" means the existing apartment building municipally known as 3050 Pharmacy Avenue and ancillary structures , including an underground parking garage and enclosed garage entry ramp located on the lands in the year 2020 as shown on Diagram 3; and (ii) for the purposes of this Regulation, "New Building" means the proposed apartment building on the lands as shown on Diagram 3.

  3. Rule C

    The total residential gross floor area of the New Building must not exceed 28,750 square metres

  4. Rule D

    The total gross floor area of the Existing Building shall not exceed the gross floor area existing therein as of December 1, 2019

  5. Rule E

    A maximum of 305 dwelling units are permitted in the New Building

  6. Rule F

    A maximum of 252 dwelling units are permitted in the Existing Building

  7. Rule G

    Despite Clauses 15.10.40.70 and 15.10.40.80, the required minimum building setbacks and the required minimum separation distances between main walls of buildings or structures above ground level are shown in metres on Diagram 3 of By-law 48-2021

  8. Rule H

    Despite Regulation 5.10.40.70(1), Clause 15.5.40.60 and Regulation (G) above, the following elements of a building or structure may encroach into a required minimum building setback and a required minimum main wall separation distance shown in metres on Diagram 3 of By-law 48-2021 as follows: (i) Lighting fixtures, cornices, sills, eaves, parapets, balustrades, ornamental and architectural features, bay windows, gas and hydro metres, and window washing equipment attached to a building or structure may project a maximum distance of 3.0 metres; (ii) Lighting fixtures, railings, privacy screens, balustrades, bollards, stairs and related enclosures, underground garage ramps and associated structures , walls and safety railings, wind mitigation elements, trellises, guards, guardrails, retaining walls, wheelchair ramps, air intakes and vents, ventilating equipment, bike share facilities, outdoor amenity space elements, ornamental or architectural features, including planters, green energy and renewable energy elements, gas and hydro meters, and art installations may be located at ground level beyond the minimum building setback and required minimum main wall separation distance shown on Diagram 3; (iii) Canopies and awnings may project to a maximum of 3.0 metres; (iv) Balconies may project to a maximum of 2.0 metres; and (v) Structures , elements and enclosures permitted by Regulation

  9. Rule I

    below; (I) Despite Clauses 15.5.40.10 and 15.10.40.10, the height of each portion of a building or structure on the lot, is measured as the vertical distance between the Canadian Geodetic Datum elevation of 183.65 metres, and the highest point of the building or structure , and must not exceed the height in metres as specified by the numbers following the symbol H as shown on Diagram 3 to By-law 48-2021, with the exception of the following: (i) Structures , elements and enclosures permitted by Regulation (H) above; (ii) Parapets to a maximum height of 1.5 metres above the height limits specified on Diagram 3; (iii) Window washing equipment to a maximum projection of 3.0 metres above the height limits specified on Diagram 3; (iv) Structures on any roof used for mechanical equipment, chimneys, vents, stacks, mechanical fans, cooling towers, elevators and related structural elements, roof assemblies, and structures and elements associated with green energy and renewable energy facilities located on any roof, which may have a maximum projection above the permitted height limits specified of Diagram 3 of 1.5 metres; (v) Structures on any roof used for maintenance, safety, wind or green roof purposes, including architectural screens, stairs and related enclosures, and lightning rods, provided that the maximum height of such elements is no higher than 3.0 metres above the height limits specified on Diagram 3; (vi) Structures at ground level, including bollards, guards, guardrails, wheel chair ramps, gas and hydro meters, green energy and renewable energy facilities, air intakes and vents, and ventilating equipment provided that the maximum height of such elements is no higher than 1.2 metres above ground level; (vii) Structures at ground level, including underground garage ramps and associated structures , walls and safety railings, privacy screens, retaining walls, balustrades, stairs and related enclosures, fences, bike share facilities, outdoor amenity space elements, and safety railings, provided that the maximum height of such elements is no higher than 2.0 metres above ground level; (viii) Structures at ground level, including lighting fixtures, ornamental, architectural or landscape features, including planters, wind mitigation elements, trellises, and art installations provided that the maximum height of such elements is no higher than 4.0 metres above ground level; and (ix) The height of the Existing Building shall not exceed the height of such building as it existed on the lot on December 1, 2019

  10. Rule J

    Despite Regulation 15.10.40.50(1), amenity space must be provided and maintained in accordance with the following: (i) A minimum of 2.0 square metres per dwelling unit in the New Building must be provided as indoor amenity space ; (ii) A minimum of 2.0 square metres of per dwelling unit in the New Building must be provided as outdoor amenity space of which a minimum of 40 square metres must be provided in a location directly adjacent to an area containing indoor amenity space ; and (iii) The amenity space provided in accordance with Regulations (i) and (ii) above must be available and accessible to the residents of the Existing Building.

  11. Rule K

    Despite Regulation 220.5.10.1(2), a minimum of one Type "G" loading space is required for the New Building

  12. Rule L

    Despite Regulation 220.5.1.10(8) any loading spaces existing on the lands as of December 1, 2019 may be maintained and are deemed to comply with the requirements of By-law 569-2013

  13. Rule M

    Despite Regulation 200.5.10.1(1) parking spaces must be provided in accordance with the following: (i) 0.85 parking spaces for each dwelling unit for residents; and (ii) 0.15 parking spaces for each dwelling unit for residential visitors

  14. Rule N

    Despite Regulation 200.15.1(1) an accessible parking space must have the following minimum dimensions: (i) length of 5.6 metres; (ii) width of 3.4 metres; (iii) vertical clearance of 2.1 metres; and (iv) a 1.5 metre wide accessible barrier-free aisle or path is required along the entire length of one side of an accessible parking space , and such aisle or path may be shared by 2 accessible parking spaces .

  15. Rule O

    Despite Regulation 200.15.10(1)(C) if the total number of required parking spaces in regulation (M) above is more than 100, a minimum of four (4) parking spaces plus one (1) parking space for every 50 parking spaces or part thereof in excess of 100 parking spaces , must comply with the minimum dimensions for an accessible parking space set out in regulation (N) above

  16. Rule P

    Despite any provision of this Exception or By-law 569-2013, as amended, to the contrary, any parking spaces , drive aisles , driveways and ramps existing on the lot , as of December 1, 2019 may be maintained and are deemed to comply with the requirements of By-law 569-2013

  17. Rule Q

    Despite Regulation 230.5.10.1(5), bicycle parking spaces required for the New Building must be provided as follows: (i) A minimum of 0.68 bicycle parking spaces for each dwelling unit , allocated as "long-term" bicycle parking spaces ; and (ii) A minimum of 0.07 bicycle parking spaces for each dwelling unit allocated as "short-term" bicycle parking spaces .

  18. Rule R

    Despite Section 230.5 any bicycle parking spaces existing on the lot as of December 1, 2019 are deemed to comply with the requirements of By-law 569-2013. Prevailing By-laws and Prevailing Sections: (None Apply)

  19. Older by-law A

    On 3050 Pharmacy Avenue, if the requirements of Section 5 and Schedule A are complied with, a building or structure may be erected and used in compliance with

  20. Older by-law B

    to (R) below; (B) The buildings and structures permitted on the lot include the "Existing Building" and the "New Building" as shown on Diagram 3 to By-law 48-2021 as follows: (i) for the purposes of this Regulation, "Existing Building" means the existing apartment building municipally known as 3050 Pharmacy Avenue and ancillary structures , including an underground parking garage and enclosed garage entry ramp located on the lands in the year 2020 as shown on Diagram 3; and (ii) for the purposes of this Regulation, "New Building" means the proposed apartment building on the lands as shown on Diagram 3.

  21. Older by-law C

    The total residential gross floor area of the New Building must not exceed 28,750 square metres

  22. Older by-law D

    The total gross floor area of the Existing Building shall not exceed the gross floor area existing therein as of December 1, 2019

  23. Older by-law E

    A maximum of 305 dwelling units are permitted in the New Building

  24. Older by-law F

    A maximum of 252 dwelling units are permitted in the Existing Building

  25. Older by-law G

    Despite Clauses 15.10.40.70 and 15.10.40.80, the required minimum building setbacks and the required minimum separation distances between main walls of buildings or structures above ground level are shown in metres on Diagram 3 of By-law 48-2021

  26. Older by-law H

    Despite Regulation 5.10.40.70(1), Clause 15.5.40.60 and Regulation (G) above, the following elements of a building or structure may encroach into a required minimum building setback and a required minimum main wall separation distance shown in metres on Diagram 3 of By-law 48-2021 as follows: (i) Lighting fixtures, cornices, sills, eaves, parapets, balustrades, ornamental and architectural features, bay windows, gas and hydro metres, and window washing equipment attached to a building or structure may project a maximum distance of 3.0 metres; (ii) Lighting fixtures, railings, privacy screens, balustrades, bollards, stairs and related enclosures, underground garage ramps and associated structures , walls and safety railings, wind mitigation elements, trellises, guards, guardrails, retaining walls, wheelchair ramps, air intakes and vents, ventilating equipment, bike share facilities, outdoor amenity space elements, ornamental or architectural features, including planters, green energy and renewable energy elements, gas and hydro meters, and art installations may be located at ground level beyond the minimum building setback and required minimum main wall separation distance shown on Diagram 3; (iii) Canopies and awnings may project to a maximum of 3.0 metres; (iv) Balconies may project to a maximum of 2.0 metres; and (v) Structures , elements and enclosures permitted by Regulation

  27. Older by-law I

    below; (I) Despite Clauses 15.5.40.10 and 15.10.40.10, the height of each portion of a building or structure on the lot, is measured as the vertical distance between the Canadian Geodetic Datum elevation of 183.65 metres, and the highest point of the building or structure , and must not exceed the height in metres as specified by the numbers following the symbol H as shown on Diagram 3 to By-law 48-2021, with the exception of the following: (i) Structures , elements and enclosures permitted by Regulation (H) above; (ii) Parapets to a maximum height of 1.5 metres above the height limits specified on Diagram 3; (iii) Window washing equipment to a maximum projection of 3.0 metres above the height limits specified on Diagram 3; (iv) Structures on any roof used for mechanical equipment, chimneys, vents, stacks, mechanical fans, cooling towers, elevators and related structural elements, roof assemblies, and structures and elements associated with green energy and renewable energy facilities located on any roof, which may have a maximum projection above the permitted height limits specified of Diagram 3 of 1.5 metres; (v) Structures on any roof used for maintenance, safety, wind or green roof purposes, including architectural screens, stairs and related enclosures, and lightning rods, provided that the maximum height of such elements is no higher than 3.0 metres above the height limits specified on Diagram 3; (vi) Structures at ground level, including bollards, guards, guardrails, wheel chair ramps, gas and hydro meters, green energy and renewable energy facilities, air intakes and vents, and ventilating equipment provided that the maximum height of such elements is no higher than 1.2 metres above ground level; (vii) Structures at ground level, including underground garage ramps and associated structures , walls and safety railings, privacy screens, retaining walls, balustrades, stairs and related enclosures, fences, bike share facilities, outdoor amenity space elements, and safety railings, provided that the maximum height of such elements is no higher than 2.0 metres above ground level; (viii) Structures at ground level, including lighting fixtures, ornamental, architectural or landscape features, including planters, wind mitigation elements, trellises, and art installations provided that the maximum height of such elements is no higher than 4.0 metres above ground level; and (ix) The height of the Existing Building shall not exceed the height of such building as it existed on the lot on December 1, 2019

  28. Older by-law J

    Despite Regulation 15.10.40.50(1), amenity space must be provided and maintained in accordance with the following: (i) A minimum of 2.0 square metres per dwelling unit in the New Building must be provided as indoor amenity space ; (ii) A minimum of 2.0 square metres of per dwelling unit in the New Building must be provided as outdoor amenity space of which a minimum of 40 square metres must be provided in a location directly adjacent to an area containing indoor amenity space ; and (iii) The amenity space provided in accordance with Regulations (i) and (ii) above must be available and accessible to the residents of the Existing Building.

  29. Older by-law K

    Despite Regulation 220.5.10.1(2), a minimum of one Type "G" loading space is required for the New Building

  30. Older by-law L

    Despite Regulation 220.5.1.10(8) any loading spaces existing on the lands as of December 1, 2019 may be maintained and are deemed to comply with the requirements of By-law 569-2013

  31. Older by-law M

    Despite Regulation 200.5.10.1(1) parking spaces must be provided in accordance with the following: (i) 0.85 parking spaces for each dwelling unit for residents; and (ii) 0.15 parking spaces for each dwelling unit for residential visitors

  32. Older by-law N

    Despite Regulation 200.15.1(1) an accessible parking space must have the following minimum dimensions: (i) length of 5.6 metres; (ii) width of 3.4 metres; (iii) vertical clearance of 2.1 metres; and (iv) a 1.5 metre wide accessible barrier-free aisle or path is required along the entire length of one side of an accessible parking space , and such aisle or path may be shared by 2 accessible parking spaces .

  33. Older by-law O

    Despite Regulation 200.15.10(1)(C) if the total number of required parking spaces in regulation (M) above is more than 100, a minimum of four (4) parking spaces plus one (1) parking space for every 50 parking spaces or part thereof in excess of 100 parking spaces , must comply with the minimum dimensions for an accessible parking space set out in regulation (N) above

  34. Older by-law P

    Despite any provision of this Exception or By-law 569-2013, as amended, to the contrary, any parking spaces , drive aisles , driveways and ramps existing on the lot , as of December 1, 2019 may be maintained and are deemed to comply with the requirements of By-law 569-2013

  35. Older by-law Q

    Despite Regulation 230.5.10.1(5), bicycle parking spaces required for the New Building must be provided as follows: (i) A minimum of 0.68 bicycle parking spaces for each dwelling unit , allocated as "long-term" bicycle parking spaces ; and (ii) A minimum of 0.07 bicycle parking spaces for each dwelling unit allocated as "short-term" bicycle parking spaces .

  36. Older by-law R

    Despite Section 230.5 any bicycle parking spaces existing on the lot as of December 1, 2019 are deemed to comply with the requirements of By-law 569-2013. Prevailing By-laws and Prevailing Sections: (None Apply)

By-law 569-2013, Chapter 900

Lot facts

Area
17,016 m²
Frontage
90 m
Depth
213.9 m
Street
44 Chester Le Blvd
Corner lot
Yes, also on Pharmacy Ave213.9 m along it
Public lane
None
House footprint
1,588 m²roof up to 58.6 m
Back yard
117.8 mhouse to rear lot line
Side yards
31.5 m and 34 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
54 m
Max lot coverage
33%

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Site and Area Specific Policy 347. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Zone RA (d3.25) (x568) (Residential Apartment). Chapter 15, section 15.10 of the by-law. Source
  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: honey locust sunburst (12 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%1 of 1 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
1
Development applications
11

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Minor variancePending

    Cancelled

    2575 PHARMACY AVE · Oct 6, 2026 · 247 m away
  • Consent (lot split)Pending

    Accepted

    2575 PHARMACY AVE · Oct 6, 2026 · 247 m away
  • Building permit

    Two overhanging illumintated wall sign.***3050 PHARMACY***

    3050 PHARMACY AVE · Aug 5, 2026 · 35 m away
  • Zoning review

    Notice Sent

    2575 PHARMACY AVE · Jul 24, 2026 · 247 m away
  • Zoning review

    Closed

    2575 PHARMACY AVE · Jul 22, 2026 · 247 m away
  • Building permit

    HVAC - Proposed interior alterations to convert unfinished space for new cannabis store. Adding general sales area with millwork, secured storage room and universal washroom - Commercial unit 3

    3051-3077 PHARMACY AVE · Jul 17, 2026 · 114 m away
  • Zoning review

    Not Started

    2930 FINCH AVE E · Jun 26, 2026 · 273 m away
  • Building permit

    Proposed localized concrete repairs, demolition of the existing pool structure, and installation of new site finishes.

    100 SPRUCEWOOD CRT · Jun 25, 2026 · 290 m away
  • Building permit

    Proposal for interior alterations to take-out restaurant with seating and full kitchen

    2930 FINCH AVE E · Jun 5, 2026 · 273 m away
  • Building permit

    Proposed interior alteration for retail - convenience store and vape store

    3051-3077 PHARMACY AVE · May 27, 2026 · 114 m away

Neighbourhood: L'Amoreaux West

About the area around the lot, not the lot itself.

Nearest station
Don Mills Station44 min walk
Nearest TTC stop
Pharmacy Ave at Finch Ave East North Side1 min walk
Nearest cycling route
Corinthian BlvdSigned Route (No Pavement Markings), 10 min walk
Nearest traffic count
8,509 vehicles in 14 hChester Le Blvd / Huntingdale Blvd / Pharmacy Ave, 120 m away, Oct 26, 2025
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Beverly Glen Park5 min walk
Chester Le Park8 min walk
Birchcrest Park9 min walk

Schools within 1 km

  • EPIPHANY OF OUR LORD CATHOLIC ACADEMY English Separate 7 min walk
  • MARY WARD LINC AND ESL CENTRE English Separate 7 min walk
  • CHESTER LE JR PUBLIC SCHOOL English Public 8 min walk
  • BEVERLY GLEN JR PUBLIC SCHOOL English Public 8 min walk
  • J B TYRRELL SR PUBLIC SCHOOL English Public 12 min walk
  • ERNEST PUBLIC SCHOOL English Public 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureL'Amoreaux WestMedian neighbourhood
Median household income (2020)$72,500$84,500
Households that own their home54%54%
Population (2021)21,54516,813
Homes built in 1960 or before7%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleL'Amoreaux WestCity median
Assault398636.3
Robbery87.169.5
Shootings4.110.5
Auto theft228192.6
Theft over $5,00041.546.1
Break and enter161.7172.8
Theft from vehicles128.5188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.