Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 302 Yonge St
302 Yonge St is on a 15.6 m by 30.7 m lot on Yonge St in Yonge-Bay Corridor. This lot is not covered by Toronto's city-wide zoning by-law 569-2013, so a by-law of the former city or borough most likely still applies. Toronto Building can confirm which one. The lot also fronts Dundas St W. The property is designated under Part IV of the Ontario Heritage Act, so changes to its heritage features need a City heritage permit.
The City has 9 records on this lot since 2007. That is more than at 99% of Toronto houses. In 2019, a building permit was filed: "To erect and display two overhanging structure signs and two projecting signs, all illuminated and displaying static copy. eected on the south, east and south…". Status: closed. In 2019, a building permit was filed: "To erect and display three illuminated electronic roof signs displaying electronic moving copy located on the roof of the building, ****rogers****". Status: closed. In 2019, a building permit was filed: "Rev01; changes as per cover letter". Status: closed. Nothing on file is open right now.
Within 300 m, 20 development applications are open (the tallest up to 85 storeys). Within 300 m, the Committee of Adjustment decided 13 minor variance applications in the last 10 years and approved 100%. TMU station is a 1-minute walk.
Summary
What the City's records show on this house
- Heritage property: designated (Part IV)Moderate
- Zoning not in By-law 569-2013Moderate
- 20 development applications open within 300 mLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- No open orders or by-law investigations
- No permits left open for years
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
City files on this lot
9 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2019-12-10 | Building permit19 239842 | To erect and display two overhanging structure signs and two projecting signs, all illuminated and displaying static copy. Eected on the south, east and south east elevations of the building. All on the first storey.*****ROGERS**** | Closed | |
| 2019-11-25 | Building permit19 206269 | To erect and display three illuminated electronic roof signs displaying electronic moving copy located on the roof of the building, ****ROGERS**** | Closed | |
| 2019-10-21 | Building permit19 186363 | rev01; changes as per cover letter | Closed | |
| 2019-09-10 | Zoning review19 219166 ZMP | No description on file | Closed | |
| 2019-07-24 | Building permit19 187158 | Proposal for exterior alterations to restore the building back to the original facade as request by Toronto Heritage - refer to attached letter | Closed | |
| 2014-01-22 | Building permit14 106579 | Proposal to upgrade Fire alarm in "Forever 21" | Closed | |
| 2010-01-22 | Zoning review10 108000 LTO | No description on file | Closed | |
| 2007-05-09 | Building permit07 182871 | Relocate/add sprinkler heads in retail unit. | Closed | |
| 2007-03-08 | Building permit07 110446 | Interior alterations to existing retail store - change store from GAP to "Forever 21" | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Heritage property: designated (Part IV)
- Zoning not in By-law 569-2013
What this part means for this house, in plain EnglishUnlock
Heritage property: designated (Part IV)
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Zoning not in By-law 569-2013
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto Heritage RegisterWhat this means: Toronto zoning by address
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- —
- Height limit
- —
- Corner lot
- Yes, also on Dundas St W
- Public lane
- None
- House footprint
- 415 m²
- Back yard
- 3.5 m
- Buildings on the lot
- 3
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 20 development applications open within 300 m, up to 85 storeys
- 13 minor variance decisions within 300 m, 100% approved
What this part means for this house, in plain EnglishUnlock
20 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 1 of 8 categories
- Assault: 5.3 times the Toronto median
- Theft over $5,000: 4.6 times the Toronto median
- Robbery: 4.3 times the Toronto median
- Break and enter: 3.2 times the Toronto median
- Homicide: 2.3 times the Toronto median
- Theft from vehicles: 2.1 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Yonge-Bay Corridor neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- TMU StationNearest station1 min walk
- Yonge St at Dundas St West - TMU StationNearest TTC stop1 min walk
- Bay StNearest cycling route3 min walk
- Toronto Metropolitan University - Entr To Business School LobbySchool2 min walk
- Tmu - Heaslip HouseSchool3 min walk
- Toronto Metropolitan University - School of Image ArtsSchool3 min walk
- Tmu - Heidelberg Centre School of Graphic Comm'ns MgmtSchool4 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.33361.1
- Robberycity median 69.5300.1
- Homicidecity median 5.312
- Shootingscity median 10.512
- Auto theftcity median 192.6162.1
- Theft over $5,000city median 46.1210.1
- Break and entercity median 172.8552.2
- Theft from vehiclescity median 188.1402.1
Ready emails
Copy and send as they are.
1 question for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist