HousePrecheckCheck an address

301 St Clair Ave WToronto · zoning, lot size and permit records

Open space · OR (x84)≈ 253.1 × 500.3 m86,846 m²on St Clair Ave Wcorner, also on Russell Hill Rd

Not a home

A park or open space

The zoning by-law sets this parcel aside for parks and open space. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Permits or applications open on this parcelRecent records on this lot: 26 122518 STE 12 CD (Draft Plan of Condominium for with 4 POTLS in the form of 4 townhouse units, 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • 1 development application open within 300 mNew buildings may go up around here in the next years. More change nearby than at 91% of Toronto houses.
N50 m
≈ 253.1 m frontage≈ 500.3 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: listed

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused. A listing is not registered on title, so a title search will not show it.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • TRCA regulated area (53% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (51% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Environmentally Significant Area: Nordheimer Ravine

    Needs a closer look

    The lot touches an Environmentally Significant Area shown on Official Plan Map 12.

    What it means. Development in or next to the area needs an impact study and may be limited.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 12
  • 2 building permits open, the oldest since 2013

    Needs a closer look

    Still open in the City's records: 15 231337 (Proposal for concrete repairs and water proofing, removing and replace 3 stair structur..., 2015, status Permit Issued); 13 190205 (Proposal for foundation reinforcement, antenna additions, and HFC pad addition to exist..., 2013, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Natural Heritage System (56% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 122518 STE 12 CD (Draft Plan of Condominium for with 4 POTLS in the form of 4 townhouse units, 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

12 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 259696 ELS 00 IRClosed

    Election Signs

    Oct 23, 2026 · 301 ST CLAIR AVE W
  • Development application26 122518 STE 12 CDDraft Plan Approved

    Draft Plan of Condominium for with 4 POTLS in the form of 4 townhouse units

    Feb 27, 2026 · 206 RUSSELL HILL RD · City file
  • Development application26 122516 STE 12 PLClosed

    for 4 lots

    Feb 27, 2026 · 206 RUSSELL HILL RD · City file
  • Building permit24 217825Cancelled

    Proposal for installation of temporary stage for fundraising event

    Sep 25, 2024 · 301 ST CLAIR AVE W
  • Building permit20 192610Closed

    Proposal to install one 30' by 60' certified tents (certified # 14-240257), installed September 19th, 20th and 28th of September 2020(3 days of September).

    Sep 14, 2020 · 301 ST CLAIR AVE W
  • Building permit20 156261Closed

    Proposed installation of a new plumbing fixture in an existing tennis club.

    Aug 25, 2020 · 301 ST CLAIR AVE W
  • Development application18 161483 STE 22 OZClosed

    Zoning By-law Amendment Application proposing four 3-storey townhouse units with a total residential gross floor area of 1663m2. A total of 8 vehicular parking spaces will be provided in a below-grade garage.

    May 18, 2018 · 206 RUSSELL HILL RD · City file
  • Development application18 161486 STE 22 SAClosed

    Proposal to construct four 3-storey townhouse dwelling units including underground parking containing a total of 1,663.6 m2 appealed to the Ontario Land Tribunal.

    May 18, 2018 · 206 RUSSELL HILL RD · City file
Show 4 older records
  • Building permit15 231337Permit Issued

    Proposal for concrete repairs and water proofing, removing and replace 3 stair structures, and new water service to existing water reservoir - "City of Toronto"

    Nov 10, 2015 · 301 ST CLAIR AVE W
  • Building permit13 190205Inspection

    Proposal for foundation reinforcement, antenna additions, and HFC pad addition to existing Toronto Police radio communications tower

    Jul 5, 2013 · 301 ST CLAIR AVE W
  • Building permit12 203019Closed

    Proposal to install one certified tent #11-143297 (measuring 30' x 135') on September 14, 2012 and to be dismantled on September 15, 2011 for "Toronto 5K" on north side of Winston Churchilll Park.

    Jul 5, 2012 · 301 ST CLAIR AVE W
  • Building permit11 250273Closed

    Proposal to install one certified tent #11-143297 (measuring 30' x 150') on September 16, 2011, and to be dismantled on September 17, 2011 for "Toronto 5K" on north side of Winston Churchilll Park.

    Sep 1, 2011 · 301 ST CLAIR AVE W

Check before you build

  • Site-specific exception 900.42.10(84)

    Needs a closer look

    2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.42.10(84)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Section 12(1) 55 of former City of Toronto By-law 438-86

  2. Older by-law B

    Section 12(2) 323 of former City of Toronto By-law 438-86.

By-law 569-2013, Chapter 900

Lot facts

Area
86,846 m²
Frontage
253.1 mestimated, irregular lot
Depth
500.3 mestimated, irregular lot
Street
St Clair Ave W
Corner lot
Yes, also on Russell Hill Rd500.3 m along it
Public lane
None
House footprint
226 m²roof up to 15.9 m
Back yard
409.1 mhouse to rear lot line
Side yards
63.1 m and 180 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone OR (x84) (Open Space Recreation). Chapter 90, section 90.30 of the by-law. Source
  • 19 City trees in front of this lot. The City's street tree inventory lists 19 trees at this address: maple, norway (76 cm), maple, norway (74 cm), maple, norway (70 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
89%17 of 19 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
2
Development applications
7

Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 19 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Proposed rooftop solar (PV) installation

    34 WARREN RD · Nov 12, 2026 · 263 m away
  • Building permit

    Proposal to alter rear detached garage with interior alterations

    394 WALMER RD · Oct 21, 2026 · 273 m away
  • Building permit

    Proposal to alter rear detached garage with interior alterations

    394 WALMER RD · Sep 28, 2026 · 273 m away
  • Building permit

    Rooftop solar panel installation

    370 WALMER RD · Aug 31, 2026 · 284 m away
  • Building permit

    Plumbing - Proposed interior cosmetic upgrades including washer & dryer addition.No changes to existing HVAC system.

    265 RUSSELL HILL RD · Jul 22, 2026 · 295 m away
  • Building permit

    Plumbing - Interior cosmetic upgrade including stacked laundry closet addition.No changes to existing HVAC system.

    265 RUSSELL HILL RD · Jun 25, 2026 · 295 m away
  • Building permit

    Proposal for a partial second storey & full third storey addition, interior alterations, new deck & porch.

    249 RUSSELL HILL RD · Jun 15, 2026 · 209 m away
  • Building permit

    Proposal to replace the existing subway ventilation equipment and all associated services including ventilation fans, shaft dampers and silencers as applicable at the existing TTC Russell Hill Emergency Service Building.

    324 R SPADINA RD · May 4, 2026 · 174 m away
  • Building permit

    Proposed interior cosmetic upgrade including stacked laundry closet addition. No changes to existing HVAC system - Unit # 106

    263 RUSSELL HILL RD · Apr 16, 2026 · 283 m away
  • Building permit

    Proposal for multiple projects (multiple additions on to existing dwelling, interior alterations and rear patio with steps).

    111 RUSSELL HILL RD · Mar 25, 2026 · 296 m away

Neighbourhood: Casa Loma

About the area around the lot, not the lot itself.

Nearest station
St Clair West Station10 min walk
Nearest TTC stop
St Clair Ave West at Spadina Rd East Side4 min walk
Nearest cycling route
Sir Winston Churchill Park TrlMulti-Use Trail, 1 min walk
Nearest traffic count
7,990 vehicles in 8 hSpadina Rd / Russell Hill Dr / Nordheimer Ravine Trl, 150 m away, Jun 8, 2006
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
Parks
Sir Winston Churchill Park1 min walk
Nordheimer Ravine2 min walk
Spadina Road Park3 min walk

Schools within 1 km

  • ARROWSMITH SCHOOL - BLDG 1 Private 6 min walk
  • ARROWSMITH SCHOOL - BLDG 2 Private 6 min walk
  • CITY HIGH SCHOOL Private 8 min walk
  • HOLY ROSARY CATHOLIC ELEMENTARY SCHOOL English Separate 8 min walk
  • THE MABIN SCHOOL Private 10 min walk
  • WALDORF ACADEMY ELEMENTARY SCHOOL Private 10 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureCasa LomaMedian neighbourhood
Median household income (2020)$103,000$84,500
Households that own their home44%54%
Population (2021)11,35016,813
Homes built in 1960 or before44%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleCasa LomaCity median
Assault564.9636.3
Robbery29.369.5
Shootings14.710.5
Auto theft73.4192.6
Theft over $5,00036.746.1
Break and enter322.8172.8
Theft from vehicles102.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.