TRCA regulated area (100% of lot)
Needs a closer lookPart of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.
What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.
How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details
Ontario Regulation 41/24, TRCA Regulation Limit1 Committee of Adjustment file on this lot
Good to know0 approved. B0037/15TEY (2015).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)8 development applications open within 300 m
Good to know8 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 53 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
6 records on file: more than at 95% of Toronto houses (median 0).
- Building permit16 216124Cancelled
Proposal to construct a 5 storey self storage building with designers studios on the ground floor and an enclosed loading area.
Sep 16, 2019 · 300 COMMISSIONERS ST - Consent (lot split)B0037/15TEYPendingMay 5, 2015 · 300 COMMISSIONERS ST
- Zoning review15 129557 PSPClosedMar 25, 2015 · 300 COMMISSIONERS ST
- Development application15 129557 STE 30 SAClosed
Revised Application Submitted on December 15, 2017: The Applicant, Belleterre Real Estate Partners Limited, has submitted a revised application for Site Plan Control, which proposes the development of a 5-storey, 13,447 m2, self-storage warehouse (Storage Warehouse, Class A) over two phases of construction. Loading docks for the proposed storage use will be provided and will be located internal to the proposed building. A 371 m2 Designer's Studio is proposed to be located on the ground floor of the 5-storey building. A total of 40 parking spaces, 6 bicycle parking spaces, and 4 loading spaces are proposed to serve the development. The site has a total area of 18,245 m2; however, the development will be located only on the northern portion of the site, which maintains an area of 6,638 m2. Please note that the site is subject to the Lower Don Special Policy Area. Also note that the approval for this site plan now rests with the Ontario Municipal Board (OMB). The OMB issued a decision on July 4, 2016 (Case # MM150067) allowing the development to proceed in its proposed location, and issued a subsequent oral decision on July 27, 2017, requesting to resolve this matter within 20 business days of final site plan submission to City staff. As Planning and Legal staff have been directed to respond to the OMB with a full and final NOAC, please ensure your comments include final pre- and post-approval conditions.
Mar 19, 2015 · 300 COMMISSIONERS ST · City file - Zoning review15 107877 ZPRClosedJan 23, 2015 · 300 COMMISSIONERS ST
- Zoning review03 186867 ZPRClosedOct 20, 2003 · 300 COMMISSIONERS ST
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 9,272 m²
- Frontage
- 96 m
- Depth
- 96.6 m
- Street
- Bouchette St
- Corner lot
- Yes, also on Commissioners St96.6 m along it
- Public lane
- None
- House footprint
- 2,047 m²
- Back yard
- 25.9 mhouse to rear lot line
- Side yards
- 9.5 m and 48.8 mhouse to side lot lines
- Buildings on the lot
- 1house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- 3 City trees in front of this lot. The City's street tree inventory lists 3 trees at this address: maple, norway emerald queen (46 cm), maple, norway emerald queen (41 cm), maple, norway emerald queen (39 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 100%1 of 1 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 8
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-Law 1281-2018), by modifying Schedules A, B, and C of this by-law.
30 BOOTH AVE · Sep 25, 2024 · 406 m away - Minor varianceApproved
To convert the vacant industrial building into a distillery with a bar and retail area.
20 LOGAN AVE · Oct 24, 2018 · 439 m away - Minor varianceApproved
To permit a communications and broadcasting establishment.
29 BASIN ST · May 17, 2018 · 231 m away - Minor varianceApproved
This site incorporates a large tract of land on the south side of Commissioners Street in the Portlands district and presently contains a fuel tank distribution terminal, storage Warehouse Class "A" and vacant land. Relief from the provisions of Zoning By-law No. 438-86, as amended, is being requested to develop these lands with a communications and broadcasting establishment and associated uses. An accompanying application (C of A File No. B0063/05TEY) seeks the consent of the Committee of Adjustment to allow the owner of these lands, City of Toronto Economic Development Corporation (TEDCO), to enter into a long-term lease with Toronto Film Studios for a portion of the lands identified as No. 101 Commissioners Street and 1 and 17 Basin Street.
101 COMMISSIONERS ST · Jun 15, 2005 · 311 m away - Minor varianceApproved
Maintain a trailer and storage shed having dimensions of 3.05 by 12.19 metres on the existing vacant land, for use as a sales and hire garage.
1 BASIN ST · Aug 22, 2001 · 384 m away
Latest activity nearby
- Zoning review
Application On Hold
120 BOUCHETTE ST · Jun 25, 2026 · 179 m away - Building permit
Proposal to two shipping containers on steel flatbed trailer to be used as freezers in side yard adjacent to main building
115 SAULTER ST S · Oct 14, 2025 · 136 m away - Building permit
Proposal for construction of a domed winter salt storage bunker with concrete base.
400 COMMISSIONERS ST · Jul 28, 2025 · 188 m away - Zoning review
Closed
115 SAULTER ST S · May 15, 2025 · 136 m away - Development application
Proposed two connected bar buildings of five and six storeys are proposed, each containing a tower element of 53 and 47 storeys respectively. The proposed total residential gross floor area is 69,335 m2. Residential uses are located within the podiums and towers. The non-residential gross floor area is 6,123 m2, of which 1,489 m2 is for ground floor retail and 4,643 m2 is for PIC uses located on Level 2. This results in a total gross floor area of 75,781 m2 (12.85 FSI for the net site area).
115 SAULTER ST S · Apr 30, 2025 · 178 m away · City file - Building permit
Proposal of construction of a domed winter salt storage bunker with concrete base.
400 COMMISSIONERS ST · Mar 18, 2025 · 188 m away - Building permit
1 Wall Sign**createTO**
29 BASIN ST · Feb 7, 2025 · 231 m away - Building permit
1 Wall Sign**createTO**
29 BASIN ST · Jan 20, 2025 · 231 m away - Development application
Official Plan Amendment for a 40 and 45-storey mixed-use buildings containing 937 residential dwellings, including 42 affordable units, retail, self-storage and a PIC / data centre uses.
280 COMMISSIONERS ST · Dec 4, 2024 · 116 m away · City file - Building permit
1 wall sign**Create TO**
29 BASIN ST · Nov 28, 2024 · 231 m away
Neighbourhood: South Riverdale
About the area around the lot, not the lot itself.
- Nearest station
- King Station48 min walk
- Nearest TTC stop
- Commissioners St at Bouchette St1 min walk
- Nearest cycling route
- Commissioners StCycle Track, 1 min walk
- Nearest traffic count
- 6,296 vehicles in 14 hBouchette St / Commissioners St, 90 m away, Oct 6, 2026
- Serious collisions within 500 m
- 02021–2026, killed or seriously injured
- Parks
- McCleary Park2 min walk
- Biidaasige Park6 min walk
- Morse Street Playground10 min walk
2021 Census
| Figure | South Riverdale | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $100,000 | $84,500 |
| Households that own their home | 57% | 54% |
| Population (2021) | 27,815 | 16,813 |
| Homes built in 1960 or before | 52% | 29% |
| Homes needing major repairs | 7% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | South Riverdale | City median |
|---|---|---|
| Assault | 828.7 | 636.3 |
| Robbery | 69.3 | 69.5 |
| Shootings | 3.2 | 10.5 |
| Auto theft | 217.4 | 192.6 |
| Theft over $5,000 | 88.2 | 46.1 |
| Break and enter | 264.7 | 172.8 |
| Theft from vehicles | 349.8 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.