Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
3 development applications open within 300 m
Good to know3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 71 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
4 records on file: more than at 88% of Toronto houses (median 0).
- Zoning review93 024779 LTOClosedFeb 22, 1993 · 300 BREMNER BLVD
- Zoning review93 024780 LTOClosedFeb 22, 1993 · 300 BREMNER BLVD
- Zoning review92 025400 LTOClosedApr 15, 1992 · 300 BREMNER BLVD
- Zoning review91 025984 LTOClosedJan 15, 1991 · 300 BREMNER BLVD
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 26,186 m²
- Frontage
- 210.6 mestimated, irregular lot
- Depth
- 219.6 mestimated, irregular lot
- Street
- Blue Jays Way
- Corner lot
- Yes, also on Bremner Blvd219.6 m along it
- Public lane
- None
- House footprint
- 25,356 m²roof up to 88.1 m
- Back yard
- 0.3 mhouse to rear lot line
- Side yards
- 0 m and 0.3 mhouse to side lot lines; 0 is a shared wall
- Buildings on the lot
- 1house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- 6 City trees in front of this lot. The City's street tree inventory lists 6 trees at this address: oak, red (16 cm), oak, red (14 cm), oak, red (14 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 100%2 of 2 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 4
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 2 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 493-2024) for the 21-storey mixed-use building (located at the northwest corner of the lot, municipally known as 396 Queens Quay West) by increasing the height of the mechanical penthouse, reducing the width of 32 parking spaces, and reducing the indoor amenity space (which will be used for storage space for outdoor furniture).
350 QUEENS QUAY W · Jun 17, 2026 · 333 m away - Minor varianceApproved
To alter the development standards, as approved under Site Specific Zoning By-law 135-2026 (OLT), for the 60-storey mixed-use building by converting the office spaces into residential units from floors 3 to 7, and to increase the number of storeys to 65-storeys; the building height from 202.5 m to 214 m (including the mechanical penthouse); and the maximum gross floor area. This is currently under the review of Site Plan Control (File No. 20 233433 STE 10 SA). There will be a total of 807 residential dwelling units on this lot.
277 WELLINGTON ST W · Apr 15, 2026 · 388 m away - Minor varianceApproved
To convert the existing commercial space (located on the first floor lobby, and second levels of the building, municipally known as 350 Queens Quay West) into a hotel use, and to expand the permitted hotel use areas (on the second level of the building, municipally known as 390 Queens Quay West). Also, to alter the existing building municipally known as 396 Queens Quay West, by constructing a seventh level shaft on the roof area.
350 QUEENS QUAY W · Apr 9, 2025 · 333 m away - Minor varianceApproved
To construct two new storage sheds in the north courtyard of the existing 27 storey government office building to supplement the relocation of Metro Hall Early Learning Child Care Centre from the intersection of Wellington Street and John Street (south side) to the plaza at the intersection of King Street and John Street (north side). The existing shed on the south courtyard will be demolished.
55 JOHN ST · Jan 24, 2024 · 500 m away - Minor varianceApproved
To permit the increase of gaming machines within the existing entertainment complex building (The Rec Room).
255 BREMNER BLVD · Nov 22, 2023 · 268 m away
Latest activity nearby
- Building permit
Rev 01 - Renovation of existing club/suite spaces at level 400 - Phase 5Proposed renovation of existing club/suite spaces at level 400.
1 BLUE JAYS WAY · Nov 12, 2026 · 79 m away - Building permit
Proposal to construct a new storage room within the P1 level garage area
5 MARINER TER · Nov 10, 2026 · 243 m away - Building permit
REV 01: Revision to permit to update exit stair configurationProposal for removal of three later exterior walls and installation of new curtain wall systems to match and align with adjacent existing curtain wall assemblies.
255 BREMNER BLVD · Nov 2, 2026 · 268 m away - Building permit
Proposed modernaization and replacement of the existing Fire Alarm Control Panel (FACP) serving two existing residential condominium buildings,
361 FRONT ST W · Oct 30, 2026 · 285 m away - Building permit
Interior alterations for a new restaurant tenant fit-out, including associated HVAC and plumbing work.
363 FRONT ST W · Oct 29, 2026 · 293 m away - Building permit
Replacement of existing FCU risers' expansion compensators, anchors, and guides. Total of 13 riser sets (supply and return) from the ground floor up to the 41st floor (37th level)
5 MARINER TER · Oct 22, 2026 · 243 m away - Building permit
Installation and removal of temporary stage, platforms, ramps and associated event structures for the concert at Rogers Center
1 BLUE JAYS WAY · Aug 27, 2026 · 79 m away - Building permit
Temporary installation of a G2 concert stage, including trusses, rigging, and associated event support structures within Rogers Centre for the Zach Bryan concert. All temporary structures will be dismantled and removed following the event, with no permanent alterations to the existing building. Build date: Sept 17, 2026; Dismantle date: Sept 20, 2026
1 BLUE JAYS WAY · Aug 20, 2026 · 79 m away - Building permit
Temporary installation of concert stage, truss, rigging and related event structures. Structural review of the stage engineer, ground pressures and existing floor to verify capacity for temporary event loads. All temporary structures will be removed following the event, with no permanent modifications to the building. Build date: August 17, 2026; Dismantle date: August 24, 2026
1 BLUE JAYS WAY · Aug 19, 2026 · 79 m away - Building permit
Revision to - add floor finish for scope area and transition to existing floor.Proposed removal of an existing door, installation of custom millwork, close in existing slab opening with new walls and construction of a new enclosed storage room.
1 BLUE JAYS WAY · Jul 29, 2026 · 79 m away
Neighbourhood: Harbourfront-CityPlace
About the area around the lot, not the lot itself.
- Nearest station
- St. Andrew Station11 min walk
- Nearest TTC stop
- Queens Quay West at Rees St West Side6 min walk
- Nearest cycling route
- Blue Jays WayBike Lane, 3 min walk
- Nearest traffic count
- 7,504 vehicles in 8 hBremner Blvd / Rees St, 120 m away, May 20, 2014
- Serious collisions within 500 m
- 102021–2026, killed or seriously injured: 0 fatal, 3 with pedestrians, 4 with cyclists
- Parks
- Bobbie Rosenfeld Park2 min walk
- Roundhouse Park2 min walk
- Isabella Valancy Crawford Park3 min walk
Schools within 1 km
- JEAN LUMB PUBLIC SCHOOL English Public 8 min walk
- BISHOP MACDONELL CATHOLIC ELEMENTARY English Separate 8 min walk
- ALPHA ALTERNATIVE & OASIS ALTERNATIVE English Public 14 min walk
- CITY SCHOOL English Public 15 min walk
- THE WATERFRONT SCHOOL English Public 15 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Harbourfront-CityPlace | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $90,000 | $84,500 |
| Households that own their home | 40% | 54% |
| Population (2021) | 28,135 | 16,813 |
| Homes built in 1960 or before | 0% | 29% |
| Homes needing major repairs | 2% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Harbourfront-CityPlace | City median |
|---|---|---|
| Assault | 883.3 | 636.3 |
| Robbery | 48.1 | 69.5 |
| Homicide | 2.8 | 5.3 |
| Shootings | 8.5 | 10.5 |
| Auto theft | 56.6 | 192.6 |
| Theft over $5,000 | 56.6 | 46.1 |
| Break and enter | 141.6 | 172.8 |
| Theft from vehicles | 121.7 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.