HousePrecheckCheck an address

30 Yonge StToronto · zoning, lot size and permit records

Also 10 Front St W

Commercial residential · CR 12.0 (c8.0; r11.7) SS1 (x2334)≈ 65.0 × 80.6 m3,358 m²on Yonge Stcorner, also on Front St W

Not a home

A commercial or mixed-use building

Its main building is large, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelStill open in the City's records: 24 139329 (Masonry repairs to the front facade, 2024, status Inspection); 20 174845 (Proposal for replacement of fire alarm control panel and devices for existing 'HOCKEY H..., 2020, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 14 development applications open within 300 m, up to 68 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
  • Major Transit Station Area: QueenThe City plans more homes around the station: good for transit, and more building over time.
N20 m
≈ 65.0 m frontage≈ 80.6 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: designated (Part IV)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • 2 building permits open, the oldest since 2020

    Needs a closer look

    Still open in the City's records: 24 139329 (Masonry repairs to the front facade, 2024, status Inspection); 20 174845 (Proposal for replacement of fire alarm control panel and devices for existing 'HOCKEY H..., 2020, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 14 development applications open within 300 m

    Good to know

    14 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 68 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

30 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit24 220379Closed

    To erect and display one electronic wall sign, displaying electronic static copy. Already approved by the variance #24-170671**SPIRIT OF HOCKEY**

    Nov 15, 2024 · 30 YONGE ST
  • Building permit24 215925Cancelled

    1 Wall Sign

    Sep 20, 2024 · 30 YONGE ST
  • Building permit24 139329Inspection

    Masonry repairs to the front facade

    Jul 26, 2024 · 30 YONGE ST
  • Zoning review24 170671 ZSVClosed
    Jun 26, 2024 · 30 YONGE ST
  • Zoning review23 236070 ZPRClosed
    Dec 15, 2023 · 30 YONGE ST
  • Building permit22 236588Closed

    Proposal for interior alterations to the concourse level in existing museum - "Hockey Hall of Fame"

    Jan 3, 2023 · 30 YONGE ST
  • Building permit20 174845Permit Issued

    Proposal for replacement of fire alarm control panel and devices for existing 'HOCKEY HALL OF FAME'.

    Sep 8, 2020 · 30 YONGE ST
  • Building permit17 162551Closed

    Proposal for interior alterations to the "Masks" area of existing museum. - "Hockey Hall of Fame"

    Jun 2, 2017 · 30 YONGE ST
Show 22 older records
  • Building permit16 248326Closed

    Proposed interior alterations to the entrance/lobby area of the Hockey Hall of Fame

    Dec 6, 2016 · 30 YONGE ST
  • Building permit15 163510Closed

    Proposal for interior alterations to the concourse level in exsiting museum - "Hockey Hall of Fame"

    Jun 12, 2015 · 30 YONGE ST
  • Building permit11 311716Closed

    interior alterations to Hockey Hall of Fame - Yonge and Front Entrance - Great hall

    Dec 1, 2011 · 30 YONGE ST
  • Zoning review11 147203 ZSVClosed
    Mar 17, 2011 · 30 YONGE ST
  • Building permit10 291478Closed

    Installation of one(1) electromagnetic lock on the ground floor within the "SPIRIT OF HOCKEY RETAIL STORE".

    Nov 8, 2010 · 30 YONGE ST
  • Building permit10 267810Closed

    2 new first party illuminated wall signs.

    Oct 4, 2010 · 30 YONGE ST
  • Zoning review10 251752 ZPRClosed
    Sep 2, 2010 · 30 YONGE ST
  • Building permit10 231519Closed

    Proposal for interior alterations to ground floor unit for new retail store, "Spirit of Hockey" located in the Hockey Hall of Fame.

    Aug 19, 2010 · 30 YONGE ST
  • Building permit10 216548Closed

    Proposal for interior alterations to construct a new raised floor for the "Spirit of Hockey" retail store inside the Hockey Hall of Fame building (190m2). Also see related building permit 10-187557 BLD.

    Jul 16, 2010 · 30 YONGE ST
  • Building permit10 187557Closed

    Proposal for interior alterations for new floor openings and construction of a new elevator for the "Spirit of Hockey" retail store inside the Hockey Hall of Fame building (75m2).

    Jun 7, 2010 · 30 YONGE ST
  • Building permit10 183209Closed

    Permit for interior alterations to existing restauratn greater than 30 seats on the ground floor of BCE Place - Existing Restaurant is Aqua - Space will be incorporated into the Hockey Hall of Fame complex to be used as a retail area - Future permit for interior alterations to be applied for at a later date. - (Spirit of Hockey retail store)

    Jun 1, 2010 · 30 YONGE ST
  • Building permit09 152648Closed

    Interior alterations to second floor offices. (Multi Tenant Floor.) Hockey Hall Of Fame.

    Aug 11, 2009 · 30 YONGE ST
  • Building permit05 210103Closed

    Interior alterations to an existing museum space

    Jan 6, 2006 · 30 YONGE ST
  • Building permit05 104919Closed

    Make interior alterations on concourse level. Tenant: Hockey Hall of Fame

    Jan 27, 2005 · 30 YONGE ST
  • Building permit03 169155Closed

    Install sprinkler heads and loop line to the existing system in the attic space of Hockey Hall of Fame Museum. In conjunction with bp 03 159697 *Designated Historical

    Sep 18, 2003 · 30 YONGE ST
  • Building permit03 159697Closed

    Make alterations to retail store in Hockey Hall of Fame.

    Sep 2, 2003 · 30 YONGE ST
  • Building permit03 102894Closed

    h.v.a.c. alter h.v.a.c. system on concourse level mezzanine. (hockey hall of fame)

    Jan 29, 2003 · 30 YONGE ST
  • Building permit02 180448Closed

    Construct mezzanine addition within existing museum on concourse level (Hockey Hall of Fame).

    Dec 9, 2002 · 30 YONGE ST
  • Building permit01 204441Closed

    Make interior alterations to portion of concourse (Hockey Hall of Fame)

    Dec 20, 2001 · 30 YONGE ST
  • Building permit98 018017Closed

    INSTALL MAGLOCKS ON CONCOURSE LEVEL. BP

    Jun 22, 1998 · 30 YONGE ST
  • Zoning review97 026605 LTOClosed
    Jul 24, 1997 · 10 FRONT ST W
  • Zoning review87 030048 LTOClosed
    Apr 30, 1987 · 10 FRONT ST W

Check before you build

  • Site-specific exception 900.11.10(2334)

    Needs a closer look

    4 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2334)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Section 12(1) 397 of former City of Toronto By-law 438-86

  2. Older by-law B

    Section 12(2) 132 of former City of Toronto By-law 438-86

  3. Older by-law C

    Section 12(2) 276 of former City of Toronto By-law 438-86

  4. Older by-law D

    On 161 Bay St., the odd numbered addresses of 171 to 181 Bay St., 10, 20, 22, and 32 Front St. W., 30, 36, and 42 Yonge St., and 1 and 35 Wellington St. W., former City of Toronto by-law 44-88.

By-law 569-2013, Chapter 900

Lot facts

Area
3,358 m²
Frontage
65 mestimated, irregular lot
Depth
80.6 mestimated, irregular lot
Street
Yonge St
Corner lot
Yes, also on Front St W80.6 m along it
Public lane
None
House footprint
2,926 m²
Back yard
0 mhouse to rear lot line
Side yards
0 m and 0.9 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
5house, garage, sheds
Max height
137 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Site and Area Specific Policy 217. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Major Transit Station Area: Queen. The lot is inside the Queen Major Transit Station Area approved by the Province (Site and Area Specific Policy 605). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Priority retail street: Yonge Street. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 12.0 (c8.0; r11.7) SS1 (x2334) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
  • 3 City trees in front of this lot. The City's street tree inventory lists 3 trees at this address: honey locust (10 cm), honey locust skyline (8 cm), honey locust (6 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%4 of 4 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
22

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 4 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing 26-storey non-residential building (office use) by constructing a one-storey ground floor addition (patio enclosure for an eating establishment), along the east side of the building.

    121 KING ST W · Jul 8, 2026 · 451 m away
  • Minor varianceApproved

    To alter the existing 12-storey mixed-use building by enclosing the front outdoor patio of the ground floor eating establishment (restaurant).

    20 KING ST W · Jun 17, 2026 · 302 m away
  • Minor varianceApproved

    To alter the development standards for a 92-storey mixed-use building (Tower 2), as approved under Site Specific Zoning By-law 1250-2023 (By-law 249-2020(LPAT)), by increasing the number of storeys and building height from 92-storeys (289 m) to 95-storeys (306.4 m). There will be a total of 1,014 residential dwelling units within this tower.

    7 YONGE ST · Sep 3, 2025 · 431 m away
  • Minor varianceApproved

    To alter the development standards for a 105-storey mixed-use building (as approved under Site Specific Zoning By-law 1250-2023) by increasing the building height and to permit an emergency generator on the roof of the building to exceed the maximum permitted building height. The new 106-storey mixed-use building will contain a total of 958 residential dwelling units, retail uses located on the ground floor, and a hotel use located on the 1st to 12th levels.

    7 YONGE ST · Apr 23, 2025 · 431 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 552-2019(LPAT)), for the existing four-storey commercial/office building, by permitting the dwelling unit use through the conversion of the second and third storeys from commercial/offices uses into residential dwelling units (live/work units). Also, to permit a new residential lobby, facing King Street East. No visitor parking spaces and accessible parking spaces will be provided on-site. There will be a total of three commercial units and 11 residential dwelling units (7 dwelling units and 1 commercial unit on the second level, and 4 dwelling units and 2 commercial units on the third level) within this mixed-use building.

    71 KING ST E · Dec 11, 2024 · 346 m away

Latest activity nearby

  • Building permit

    Proposal for interior alteration to existing office suites 208, 216, 230 and 306

    56 THE ESPLANADE · Nov 23, 2026 · 278 m away
  • Building permit

    INTERIOR ALTERATIONS (BUILDING, PLUMBING AND HVAC) - TENANT FITOUT FOR LEVELS 26-30

    141 BAY ST · Nov 23, 2026 · 146 m away
  • Building permit

    Modification of the existing sprinkler system for a new tenant layout (Cubecom) on the 6th floor. Related Permit no. 26 223212 BLD 00 BA

    4 KING ST W · Nov 23, 2026 · 278 m away
  • Building permit

    Interior renovation for the addition of 3 new offices within suite

    200 BAY ST · Nov 23, 2026 · 190 m away
  • Building permit

    Proposal for interior alterations to existing offices.

    200 BAY ST · Nov 23, 2026 · 190 m away
  • Building permit

    Proposal for interior alterations - demolition of interior partition layout and ceilings back to base condition; washroom renovation/corridor and plumbing fixture/finish

    199 BAY ST · Nov 19, 2026 · 225 m away
  • Building permit

    Proposal to design and install sprinkler modifications (return to base building protection) on level 22, suite 2250 in an existing office

    161 BAY ST · Nov 19, 2026 · 108 m away
  • Building permit

    Revision 01 - Revision to permit 26 155898 BLD 00 BA and 26 155898 HVA 00 BA. (Revised Layout)Proposed interior alteration to 21st and 22nd floor office

    199 BAY ST · Nov 19, 2026 · 225 m away
  • Building permit

    Remove 2 showers at Pool Entrance (non-structural), install sauna and cold plunge in space

    79 WELLINGTON ST W · Nov 18, 2026 · 297 m away
  • Building permit

    Proposed interior alterations for washroom and elevator lobby finish upgrades.

    4 KING ST W · Nov 18, 2026 · 278 m away

Neighbourhood: Yonge-Bay Corridor

About the area around the lot, not the lot itself.

Nearest station
King Station3 min walk
Nearest TTC stop
Yonge St at Front St West1 min walk
Nearest cycling route
Yonge StBike Lane, 1 min walk
Nearest traffic count
17,960 vehicles in 14 hYonge St / Front St E / Front St W, 40 m away, Jan 20, 2026
Serious collisions within 500 m
102021–2026, killed or seriously injured: 1 fatal, 4 with pedestrians, 4 with cyclists
Parks
Berczy Park3 min walk
Courthouse Square Park7 min walk
Toronto Sculpture Garden7 min walk

Schools within 1 km

  • KEYSTONE INTERNATIONAL SCHOOLS Private 7 min walk
  • VICTORIA STREET LINC English Public 8 min walk
  • DOWNTOWN ALTERNATIVE SCHOOL English Public 9 min walk
  • ST MICHAEL CATHOLIC ELEMENTARY SCHOOL - BLDG 1 English Separate 10 min walk
  • GEORGE BROWN COLLEGE - ST JAMES CAMPUS College 12 min walk
  • ST MICHAEL'S CHOIR SCHOOL - GYMNASIUM BLDG English Separate 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureYonge-Bay CorridorMedian neighbourhood
Median household income (2020)$68,500$84,500
Households that own their home32%54%
Population (2021)12,64516,813
Homes built in 1960 or before2%29%
Homes needing major repairs2%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleYonge-Bay CorridorCity median
Assault3361.1636.3
Robbery300.169.5
Homicide125.3
Shootings1210.5
Auto theft162.1192.6
Theft over $5,000210.146.1
Break and enter552.2172.8
Theft from vehicles402.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.