Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
TRCA regulated area (23% of lot)
Needs a closer lookPart of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.
What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.
How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details
Ontario Regulation 41/24, TRCA Regulation LimitRavine and natural feature protection (20% of lot)
Needs a closer lookPart of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.
What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.
How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details
Toronto Municipal Code, Chapter 6582 building permits open, the oldest since 2007
Needs a closer lookStill open in the City's records: 22 179922 (REPLACEMENT OF EXISITNG FIRE ALARM CONTROL PANEL, 2022, status Permit Issued); 07 219244 (repair of 210 balcony slabs, balcony railing replacement (6m each) and exterior wall on..., 2007, status Inspection).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Natural Heritage System (21% of lot)
Good to knowPart of the lot is in the Natural Heritage System shown on Official Plan Map 9.
What it means. New buildings or additions in that part need a natural heritage impact study.
How to confirm. City Planning confirms the policies that apply. Details
City of Toronto Official Plan, Map 98 by-law investigations closed in the last two years
Good to knowClosed files (Property Standards): 26 233463 PRS 00 IR (Property Standards, 2026); 26 210843 PRS 00 IR (Property Standards, 2026); 26 153278 PRS 00 IR (Property Standards, 2026); and 5 more.
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations4 development applications open within 300 m
Good to know4 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 29 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development ApplicationsRental building evaluation: 97 out of 100
Good to knowThe City's RentSafeTO program evaluated this rental building in 2025 (15 storeys, 214 units, built 1968).
What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.
How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details
City of Toronto, RentSafeTO Apartment Building Evaluations
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
16 records on file: more than at 100% of Toronto houses (median 0).
- By-law investigation26 233463 PRS 00 IRClosed
Property Standards
Sep 8, 2026 · 30 TUXEDO CRT - By-law investigation26 210843 PRS 00 IRClosed
Property Standards
Jul 29, 2026 · 30 TUXEDO CRT - By-law investigation26 153278 PRS 00 IRClosed
Property Standards
May 1, 2026 · 30 TUXEDO CRT - By-law investigation26 123016 PRS 00 IRClosed
Property Standards
Mar 1, 2026 · 30 TUXEDO CRT - By-law investigation26 112129 PRS 00 IRClosed
Property Standards
Feb 2, 2026 · 30 TUXEDO CRT - By-law investigation25 248965 PRS 00 IRClosed
Property Standards
Nov 4, 2025 · 30 TUXEDO CRT - By-law investigation25 246189 PRS 00 IRClosed
Property Standards
Oct 29, 2025 · 30 TUXEDO CRT - By-law investigation25 242536 PRS 00 IRClosed
Property Standards
Oct 20, 2025 · 30 TUXEDO CRT
Show 8 older records
- Zoning review23 103007 LTOClosedJan 12, 2023 · 30 TUXEDO CRT
- Building permit22 179922Permit Issued
REPLACEMENT OF EXISITNG FIRE ALARM CONTROL PANEL
Jul 25, 2022 · 30 TUXEDO CRT - Zoning review16 204375 LPRClosedAug 10, 2016 · 30 TUXEDO CRT
- Zoning review14 263621 LPRClosedDec 12, 2014 · 30 TUXEDO CRT
- Building permit14 259819Closed
Proposal to install 1 premise isolation backflow preventor in existing apartment.
Dec 9, 2014 · 30 TUXEDO CRT - Building permit14 159255Closed
200m2 of roof slab repair to 1 storey underground parking garage.
May 27, 2014 · 30 TUXEDO CRT - Building permit09 109099Closed - Dormant
erect cabinet and on rooftop for wireless communication
Apr 24, 2009 · 30 TUXEDO CRT - Building permit07 219244Inspection
repair of 210 balcony slabs, balcony railing replacement (6m each) and exterior wall on 16 stories apartment buiding
Jun 14, 2007 · 30 TUXEDO CRT
Check before you build
Site-specific exception 900.8.10(84)
Needs a closer look9 site-specific rules apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
The maximum size of the following uses is: (i) 837 square metres for a day nursery ; and (ii) 930 square metres for a recreational centre
- Rule B
The minimum building setback from a lot line that abuts a street is: (i) 36.0 metres, measured from the original centreline of the street , if the lot line abuts Ellesmere Rd., Lawrence Ave. or Markham Rd.; and (ii) 12.0 metres in all other cases
- Rule C
The minimum building setback from a side lot line is a distance equal to half the height of the building
- Rule D
The minimum building setback from a rear lot line is 13.5 metres
- Rule E
The maximum lot coverage is 18%
- Rule F
Amenity space must be provided at a minimum rate of 46.0 square metres for the first dwelling unit plus 0.9 square metres for each dwelling unit in excess of 50, but in no case is the total amenity space to be less than 198 square metres
- Rule G
The part of a building used for below grade parking must be set back from a lot line that abuts a street a distance equal to half the vertical distance from the surface of the lowest floor to surface grade at the lot line abutting the street
- Rule H
Parking spaces must be provided at a minimum rate of: (i) 1.0 for each dwelling unit for resident use; and (ii) 0.125 for each dwelling unit and used for visitor parking spaces
- Rule I
75% of all parking spaces must be at or above grade.
Lot facts
- Area
- 14,213 m²
- Frontage
- 220.8 mestimated, irregular lot
- Depth
- 141.6 mestimated, irregular lot
- Street
- Tuxedo Crt
- Corner lot
- No
- Public lane
- None
- House footprint
- 1,517 m²roof up to 52.4 m
- Back yard
- 46.7 mhouse to rear lot line
- Side yards
- 56.5 m and 83.9 mhouse to side lot lines
- Buildings on the lot
- 2house, garage, sheds
- Max height
- —
- Max lot coverage
- 33%
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
Around this lot
- Minor variances approved
- —no decisions on file
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 4
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).
Latest activity nearby
- Building permit
Revision 01: Installation of Sprinklers within new Elevator Lobby on First & Second FloorsProposal for accessibility upgrades, including interior alterations and a building addition for an elevator installation.
40 DORMINGTON DR · Nov 6, 2026 · 277 m away - Building permit
Proposal for existing P1 underground parking garage structural restoration.
40 TUXEDO CRT · Nov 2, 2026 · 112 m away - Consent (lot split)Pending
Accepted
921-931 PROGRESS AVE · Oct 14, 2026 · 240 m away - Building permit
Garage exhust system installation
20 TUXEDO CRT · Jul 28, 2026 · 143 m away - Building permit
Proposal for make-up air unit replacement
50 TUXEDO CRT · Jun 3, 2026 · 204 m away - Zoning review
Notice Sent
1255 MARKHAM RD · May 19, 2026 · 281 m away - Building permit
Alterations to relocate entrances to the laundry rooms on floors 3-14 and modify security hardware for two existing doors at the ground floor.
50 TUXEDO CRT · Nov 14, 2025 · 204 m away - Building permit
Proposal for boiler replacement
50 TUXEDO CRT · Nov 13, 2025 · 204 m away - Development application
Site Plan Control Application proposes the development of a 1-storey restaurant in an existing vacant part of lot with two existing one-storey buildings.
921-931 PROGRESS AVE · Oct 1, 2025 · 279 m away · City file - Building permit
Typical balcony repair project with localized concrete repairs and guard rail replacement.
1275 MARKHAM RD · Apr 30, 2025 · 259 m away
Neighbourhood: Woburn North
About the area around the lot, not the lot itself.
- Nearest station
- McCowan Rt Station32 min walk
- Nearest TTC stop
- Progress Ave at Roadway to Centennial College5 min walk
- Nearest cycling route
- Ellesmere RdMulti-Use Trail - Boulevard, 8 min walk
- Nearest traffic count
- 6,199 vehicles in 8 hProgress Ave: Markham Rd - Progress Ave N / Hwy 401 Collectors E Ramp, 300 m away, Feb 23, 2022
- Serious collisions within 500 m
- 12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
- Parks
- Woburn Park - Scarborough1 min walk
- Morningside Park1 min walk
- Trca Lands ( 77)7 min walk
Schools within 1 km
- WOBURN JR PUBLIC SCHOOL English Public 5 min walk
- WOBURN COLLEGIATE INSTITUTE English Public 6 min walk
- ST THOMAS MORE CATHOLIC ELEMENTARY SCHOOL English Separate 8 min walk
- CENTENNIAL COLLEGE SCHOOL - PROGRESS CAMPUS College 8 min walk
- Z3 EDUCATION CENTRE SCHOOL Private 9 min walk
- TALENTA ACADEMY Private 12 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Woburn North | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $74,500 | $84,500 |
| Households that own their home | 54% | 54% |
| Population (2021) | 26,580 | 16,813 |
| Homes built in 1960 or before | 23% | 29% |
| Homes needing major repairs | 8% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Woburn North | City median |
|---|---|---|
| Assault | 768.9 | 636.3 |
| Robbery | 76.5 | 69.5 |
| Shootings | 13.9 | 10.5 |
| Auto theft | 316.6 | 192.6 |
| Theft over $5,000 | 62.6 | 46.1 |
| Break and enter | 180.9 | 172.8 |
| Theft from vehicles | 281.8 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.