HousePrecheckCheck an address

30 Turnberry AveToronto · zoning, lot size and permit records

89.2 × 196.7 m17,477 m²on Turnberry Avecorner, also on Chambers Avebacks onto Ln E Old Weston S Rowntree

Not a home

General Mercer Public School

The City of Toronto's real estate inventory lists General Mercer Public School here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Permits or applications open on this parcelStill open in the City's records: 17 177910 (WINDOW REPLACEMENT & EXTERIOR RENEWALS/ STRUCTURAL REPAIR, 2017, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 2 development applications open within 300 mNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.
N50 m
89.2 m frontage196.7 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2017

    Needs a closer look

    Still open in the City's records: 17 177910 (WINDOW REPLACEMENT & EXTERIOR RENEWALS/ STRUCTURAL REPAIR, 2017, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

9 records on file: more than at 99% of Toronto houses (median 0).

  • Building permit18 246341Closed

    Proposal to replace fire alarm system.

    Nov 21, 2018 · 30 TURNBERRY AVE
  • Building permit17 257153Closed

    HVAC - Interior alterations - add new washroom and storage room to existing conference room on the first floor, demolish the existing partitions to add new washrooms on the second floor, upgrading existing washroom on the third floor - General Mercer J.P.S.

    Nov 24, 2017 · 30 TURNBERRY AVE
  • Building permit17 177910Inspection

    WINDOW REPLACEMENT & EXTERIOR RENEWALS/ STRUCTURAL REPAIR.

    Jun 27, 2017 · 30 TURNBERRY AVE
  • Building permit15 268343Closed

    Propose renovations to an existing classroom & daycare, including new washrooms, in existing school/daycare.

    Apr 11, 2016 · 30 TURNBERRY AVE
  • Building permit14 255341Cancelled

    Proposed renovations (277m2) to ground floor daycare classroom. Construction of new interior partiion walls and new washrooms - General Mercer Early Learning Centre

    Nov 21, 2014 · 30 TURNBERRY AVE
  • Zoning review14 181662 ZPRClosed
    Jun 27, 2014 · 30 TURNBERRY AVE
  • Building permit06 152126Closed - Dormant

    Partial demolition of the basement and removal of an existing elevator shaft.

    Jul 11, 2006 · 30 TURNBERRY AVE
  • Zoning review04 196814 ZPUClosed
    Dec 1, 2004 · 30 TURNBERRY AVE
Show 1 older records
  • Building permit92 015101Closed - Dormant

    INSTALL 6" DRAIN FROM NEW WADING POOL ALSO NEW 4" WATER SERVICE AT NORTH END OF PARK. AF. PLANS

    Apr 7, 1992 · 30 TURNBERRY AVE

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
17,477 m²
Frontage
89.2 m
Depth
196.7 m
Street
Turnberry Ave
Corner lot
Yes, also on Chambers Ave196.7 m along it
Public lane
Ln E Old Weston S Rowntree, 210.7 m along it
House footprint
1,850 m²roof up to 23 m
Back yard
138.8 mhouse to rear lot line
Side yards
8.4 m and 9.9 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 10 City trees in front of this lot. The City's street tree inventory lists 10 trees at this address: maple, norway (86 cm), maple, norway (58 cm), maple, norway (58 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
96%25 of 26 decisions
Garden suite permits
4
Laneway suite permits
9
Multiplex permits
9
Development applications
2

Within 300 m, last 10 years. 22 suite and multiplex permits: more than at 90% of Toronto houses (median 3). 26 variance decisions: more than at 58% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition (including a basement level), a rear first floor deck with stairs, and a rear second floor balcony.

    88 HOWICK AVE · Sep 23, 2026 · 438 m away
  • Minor varianceApproved

    To construct a new one-storey ancillary building (shed), in the rear yard of the property. The existing rear one-storey ancillary building (shed), with an interlock pad, will be demolished/removed.

    308 SILVERTHORN AVE · Jul 22, 2026 · 269 m away
  • Minor varianceApproved

    To construct a new fourplex and a new as of right garden suite in the rear.

    343 BLACKTHORN AVE · Jun 25, 2026 · 491 m away
  • Minor varianceApproved

    To construct a new three-storey detached dwelling with a covered front porch with stairs, a side (east) second storey patio, a rear ground floor deck, and a rear third storey deck. Also, to construct a rear one-storey detached ancillary building (shed). The existing front yard parking pad and driveway will be removed.

    20 HOWICK AVE · Jun 10, 2026 · 496 m away
  • Minor varianceApproved

    To construct a new four-storey semi-detached mixed-use building (with a mezzanine level above the ground floor and cantilevered portions of the second, third and fourth storeys at the front and west sides of the building) with a covered front entrance, a rooftop staircase access enclosure (for maintenance), rear balconies on the second, third and fourth storeys with a rear exterior access staircase, and a rear basement walkout. Long-term bicycle parking spaces will be provided within the dwelling units. There will be a total of four residential dwelling units, and one commercial unit within this building.

    451 ROGERS RD · May 27, 2026 · 275 m away

Latest activity nearby

  • Zoning review

    Notice Sent

    314 SILVERTHORN AVE · Nov 10, 2026 · 286 m away
  • Building permit

    5kW PV Solar Array, consists of 10 x 500W modules, 4 x on the main dwelling and 6 x on the garage roof. Tilt Mount anchored.

    82 ROSETHORN AVE · Oct 29, 2026 · 140 m away
  • Building permitmultiplex

    Revision 02: Proposal to convert existing duplex to a 3-unit dwelling. (Triplex). Revision 01: structural revisions to the approved permitProposal to convert existing duplex to four unit multiplex through interior alterations. Proposal to include two balconies.

    191 ROSETHORN AVE · Oct 19, 2026 · 240 m away
  • Building permitdemolition, multiplex

    Proposal to demolish exisiting residential building to build a Sixplex

    64 CHAMBERS AVE · Oct 15, 2026 · 230 m away
  • Building permitmultiplex, new building, new house

    Proposal for a new Sixplex

    64 CHAMBERS AVE · Oct 15, 2026 · 230 m away
  • Building permit

    Proposal for a detached storage structure in the rear yard.

    92 CHAMBERS AVE · Oct 5, 2026 · 186 m away
  • Minor variancePending

    Postponed

    56 ROSETHORN AVE · Sep 30, 2026 · 222 m away
  • Building permit

    Proposal for rear addition on second floor and interior renovations on ground floor.

    89 ROSETHORN AVE · Sep 10, 2026 · 147 m away
  • Building permit

    Proposal to construct a shed in the rear yard

    308 SILVERTHORN AVE · Sep 8, 2026 · 269 m away
  • Zoning review

    Closed

    45 ROSETHORN AVE · Aug 20, 2026 · 262 m away

Neighbourhood: Weston-Pelham Park

About the area around the lot, not the lot itself.

Nearest station
Caledonia Station22 min walk
Nearest TTC stop
Old Weston Rd at Turnberry Ave3 min walk
Nearest cycling route
Silverthorn AveBike Lane - Contraflow, 3 min walk
Nearest traffic count
641 vehicles in 8 hRowntree Ave / Chambers Ave, 80 m away, Mar 1, 2004
Serious collisions within 500 m
22021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 1 with cyclists
Parks
Turnberry North Park3 min walk
Turnberry South Park5 min walk
Regent Park - Etobicoke7 min walk

Schools within 1 km

  • GENERAL MERCER JR PUBLIC SCHOOL English Public 2 min walk
  • ST MATTHEW CATHOLIC ELEMENTARY SCHOOL English Separate 5 min walk
  • ST NICHOLAS OF BARI CATHOLIC ELEMENTARY SCHOOL English Separate 7 min walk
  • F H MILLER JR PUBLIC SCHOOL English Public 10 min walk
  • ST PAUL VI CATHOLIC ELEMENTARY SCHOOL English Separate 14 min walk
  • CARLETON VILLAGE JR & SR PUBLIC SCHOOL English Public 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureWeston-Pelham ParkMedian neighbourhood
Median household income (2020)$81,000$84,500
Households that own their home59%54%
Population (2021)10,68016,813
Homes built in 1960 or before58%29%
Homes needing major repairs10%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleWeston-Pelham ParkCity median
Assault611.3636.3
Robbery57.869.5
Homicide8.35.3
Shootings8.310.5
Auto theft123.9192.6
Theft over $5,00024.846.1
Break and enter190172.8
Theft from vehicles404.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.