HousePrecheckCheck an address

30 Thunder GrvToronto · zoning, lot size and permit records

Residential apartment commercial · RAC (x53)≈ 232.2 × 121.7 m16,043 m²on Thunder Grv

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 1.6 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 19 196196 (Proposal to repair concrete balcony slabs in existing apartment building, 2019, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 3 development applications open within 300 m, up to 14 storeysNew buildings may go up around here in the next years. More change nearby than at 88% of Toronto houses.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N50 m
≈ 232.2 m frontage≈ 121.7 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2019

    Needs a closer look

    Still open in the City's records: 19 196196 (Proposal to repair concrete balcony slabs in existing apartment building, 2019, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 14 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

4 records on file: more than at 88% of Toronto houses (median 0).

  • Building permit25 122861Closed

    Replace fire-rated life safety electrical conductors from basement to penthouse

    Apr 7, 2025 · 30 THUNDER GRV
  • Building permit19 196196Permit Issued

    Proposal to repair concrete balcony slabs in existing apartment building.

    Aug 19, 2019 · 30 THUNDER GRV
  • Building permit10 142031Closed

    Install 1 backflow preventer

    Apr 20, 2010 · 30 THUNDER GRV
  • Building permit01 151193Closed

    REMEDIAL WORK TO PARKING GARAGE

    Sep 7, 2001 · 30 THUNDER GRV

Check before you build

  • Site-specific exception 900.8.10(53)

    Needs a closer look

    8 site-specific rules apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.8.10(53)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The minimum building setback from a lot line that abuts a street is 18.0 metres if the lot line abuts Finch Ave. or McCowan Rd.

  2. Rule B

    The minimum building setback from a side lot line or rear lot line is a distance equal to half the height of the building

  3. Rule C

    The minimum separation between the above ground main wall of two residential buildings is the distance equal to half the combined total height of the two buildings

  4. Rule D

    The maximum lot coverage is 15%

  5. Rule E

    Amenity space must be provided at a minimum rate of 46 square metres plus 0.9 square metres for each dwelling unit in excess of 50. If the total amount of amenity space required for all dwelling units exceeds 93 square metres, then the required amenity space must be provided in two or more rooms, with each room having an interior floor area of not less than 46 square metres and not more than 93 square metres

  6. Rule F

    The minimum lot area for landscaping , is an area equal to 45% of the gross floor area of all buildings , minus the gross floor area of the free-standing recreation building and enclosed public malls used for walkway purposes

  7. Rule G

    Below grade structures are permitted in all required yards if they are no closer to a lot line that abuts a street than the greater of: (i) 3.0 metres; or (ii) a distance equal to the vertical distance from the surface of the lowest floor of the structure to the average elevation of grade at the front lot line

  8. Rule H

    Parking spaces must be provided at a minimum rate of 1.125 for each dwelling unit , and of the parking spaces required, a minimum of: (i) 65% of the parking spaces must be in a building ; and (ii) 11% of all parking spaces must be for visitors.

By-law 569-2013, Chapter 900

Lot facts

Area
16,043 m²
Frontage
232.2 mestimated, irregular lot
Depth
121.7 mestimated, irregular lot
Street
Thunder Grv
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
33%
  • Zone RAC (x53) (Residential Apartment Commercial). Chapter 15, section 15.20 of the by-law. Source

Around this lot

Minor variances approved
75%3 of 4 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
6

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 4 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Proposed interior alterations for restaurant upgrade.

    1571 SANDHURST CRCL · Nov 19, 2026 · 242 m away
  • Building permit

    Proposed interior alterations for restaurant upgrade, Group A2.

    1571 SANDHURST CRCL · Nov 6, 2026 · 242 m away
  • Building permit

    Interior renovation for a restaurant in a new addition area at woodside square mall

    1571 SANDHURST CRCL · Oct 30, 2026 · 242 m away
  • Building permit

    Proposed interior alterations to expand into adjacent vacant unit #414.

    1571 SANDHURST CRCL · Oct 27, 2026 · 242 m away
  • Development application

    Development of Block 4 accommodates a seniors retirement residence and daycare as part of the broader Woodside Square redevelopment. The proposed development consists of a 14-storey seniors retirement residence with a 1022 square metre daycare facility integrated into the ground floor of the building. The daycare is supported by 371 square metres of dedicated outdoor play space. The development will provide approximately 300 independent living units. The proposal includes a total of 3,151 square metres of resident amenity space

    1571 SANDHURST CRCL · Oct 26, 2026 · 259 m away
  • Zoning review

    Closed

    1571 SANDHURST CRCL · Oct 21, 2026 · 242 m away
  • Zoning review

    Closed

    1571 SANDHURST CRCL · Sep 3, 2026 · 242 m away
  • Building permit

    Proposal for HVAC Replacement - (2) like for like RTU's

    1571 SANDHURST CRCL · Aug 27, 2026 · 242 m away
  • Building permit

    Proposed interior alterations to restaurant - HOTPOT RESTAURANT UPGRADE

    1571 SANDHURST CRCL · Aug 26, 2026 · 242 m away
  • Building permit

    Proposal to add a counter and fridge in a restaurant - UNIT 803, "HERO TEA", WOODSIDE SQUARE.

    1571 SANDHURST CRCL · Aug 25, 2026 · 242 m away

Neighbourhood: Agincourt North

About the area around the lot, not the lot itself.

Nearest TTC stop
McCowan Rd at Finch Ave East North Side1 min walk
Nearest cycling route
East Highland Creek TrlMulti-Use Trail, 10 min walk
Nearest traffic count
33,844 vehicles in 14 hMcCowan Rd / Finch Ave E, 160 m away, Oct 29, 2024
Serious collisions within 500 m
52021–2026, killed or seriously injured: 1 fatal, 4 with pedestrians, 0 with cyclists
Parks
Richmond Park4 min walk
Chartwell Park8 min walk
Iroquois Park8 min walk

Schools within 1 km

  • AGINCOURT INTERNATIONAL ACADEMY Private 3 min walk
  • PERCY WILLIAMS JR PUBLIC SCHOOL English Public 6 min walk
  • ALBERT CAMPBELL COLLEGIATE INSTITUTE English Public 8 min walk
  • ST JEAN DE LALANDE CATHOLIC ELEMENTARY SCHOOL English Separate 9 min walk
  • BRIMWOOD BOULEVARD JR PUBLIC SCHOOL English Public 11 min walk
  • FRANCIS LIBERMANN CATHOLIC HIGH SCHOOL English Separate 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureAgincourt NorthMedian neighbourhood
Median household income (2020)$84,000$84,500
Households that own their home79%54%
Population (2021)27,54016,813
Homes built in 1960 or before4%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleAgincourt NorthCity median
Assault276.9636.3
Robbery106.869.5
Shootings6.710.5
Auto theft327192.6
Theft over $5,00053.446.1
Break and enter93.4172.8
Theft from vehicles106.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.