HousePrecheckCheck an address

30 Tangle BriarwayToronto · zoning, lot size and permit records

Also 104 Tangle Briarway, 106 Tangle Briarway, 107 Tangle Briarway, 108 Tangle Briarway, 109 Tangle Briarway and 61 more

Residential townhouse · RT (x257)93.9 × 184.2 m15,078 m²on Tangle Briarwaycorner, also on Wild Briarway

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 1.5 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelRecent records on this lot: 26 109967 (1 Ground Sign ***TANGLE BRIARWAY***, 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N50 m
93.9 m frontage184.2 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (1% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Natural Heritage System (2% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 109967 (1 Ground Sign ***TANGLE BRIARWAY***, 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

12 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit26 109967Revision Issued

    1 Ground Sign ***TANGLE BRIARWAY***

    Jul 16, 2026 · 118 TANGLE BRIARWAY
  • Zoning review26 165571 ZSVClosed
    May 22, 2026 · 118 TANGLE BRIARWAY
  • Building permit26 162944Cancelled

    1 Ground Sign*****Tangle Briarway*****

    May 19, 2026 · 78 TANGLE BRIARWAY
  • Zoning review25 250543 ZSVClosed
    Nov 6, 2025 · 118 TANGLE BRIARWAY
  • Zoning review25 233680 ZPRClosed
    Oct 1, 2025 · 118 TANGLE BRIARWAY
  • Building permit25 231498Cancelled

    1 Ground Sign

    Sep 26, 2025 · 78 TANGLE BRIARWAY
  • Building permit24 201771Closed

    KITCHEN ALTERATION, BEARING WALL REMOVAL BETWEEN KITCHEN AND DINING ROOM

    Aug 23, 2024 · 5 TANGLE BRIARWAY
  • Building permit23 195512Closed

    Replace entrance stair gaurdrails and handrails and install new ones at a townhouse complex.

    Oct 13, 2023 · 118 TANGLE BRIARWAY
Show 4 older records
  • Building permit20 223957Closed

    Proposed installation of a new shower in the basement of an existing single family townhouse dwelling.

    Dec 3, 2020 · 14 TANGLE BRIARWAY
  • Building permit19 262652Closed

    Proposal for interior alterations, work to include wall removal.

    Jan 10, 2020 · 86 TANGLE BRIARWAY
  • Building permit19 264783Closed

    Minor interior alteration: Upgrading current finished basement with new materials and adding a washroom. Structure, stair, sorrounding walls and windows will remain as are now. Project confines to basement. No changes to other floors

    Jan 6, 2020 · 40 TANGLE BRIARWAY
  • Building permit16 100328Closed

    construct rough-in for basment bathroom

    Jan 4, 2016 · 7 TANGLE BRIARWAY

Check before you build

  • Site-specific exception 900.5.10(257)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.5.10(257)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Former City of North York by-law 23482.

By-law 569-2013, Chapter 900

Lot facts

Area
15,078 m²
Frontage
93.9 m
Depth
184.2 m
Street
Tangle Briarway
Corner lot
Yes, also on Wild Briarway184.2 m along it
Public lane
None
Max height
10.5 m
Max lot coverage
25%
  • Zone RT (x257) (Residential Townhouse). Chapter 10, section 10.60 of the by-law. Source

Around this lot

Minor variances approved
82%9 of 11 decisions
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 11 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Zoning review

    Not Started

    66 CORNING RD · Nov 17, 2026 · 246 m away
  • Building permit

    1 Ground Sign ***TANGLE BRIARWAY***

    118 TANGLE BRIARWAY · Jul 16, 2026 · 71 m away
  • Consent (lot split)Approved

    To obtain consent to sever the property into two undersized residential lots. Please note this property was the subject of a previous Consent application (File No. B0046/17NY) that was approved on condition on April 19, 2018, however, the approval has lapsed.

    66 CORNING RD · Jun 18, 2026 · 246 m away
  • Zoning review

    Closed

    118 TANGLE BRIARWAY · May 22, 2026 · 71 m away
  • Building permit

    1 Ground Sign*****Tangle Briarway*****

    78 TANGLE BRIARWAY · May 19, 2026 · 25 m away
  • Zoning review

    Cancelled

    17 VAN HORNE AVE · May 11, 2026 · 201 m away
  • Building permit

    Proposed new cabana with pool equipment shed

    9 GREEN MEADOWS CRCL · Apr 30, 2026 · 297 m away
  • Minor variancePending

    LOT B - Proposal to construct a new 2 storey SFD-detached dwelling

    66 CORNING RD · Apr 17, 2026 · 246 m away
  • Minor variancePending

    LOT A - Proposal to construct a new 2 storey SFD-detached dwelling

    66 CORNING RD · Apr 17, 2026 · 246 m away
  • Building permitsecondary suite

    Proposal to construct a secondary unit and below grade entrance from side yard including 4 proposed windows and 1 window to be enlarged.

    20 COBBLESTONE DR · Apr 2, 2026 · 125 m away

Neighbourhood: Bayview Village

About the area around the lot, not the lot itself.

Nearest station
Old Cummer GO Station11 min walk
Nearest TTC stop
Leslie St at Van Horne Ave1 min walk
Nearest cycling route
East Don River TrlMulti-Use Trail - Entrance, 4 min walk
Nearest traffic count
13,523 vehicles in 8 hLeslie St / Van Horne Ave / Tangle Briarway, 70 m away, Dec 14, 2021
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Leslie Park1 min walk
East Don Parkland2 min walk
Alamosa Park5 min walk

Schools within 1 km

  • ST MATTHIAS C.S. (CLOSED FOR RENOVATION) English Separate 11 min walk
  • CRESTVIEW PUBLIC SCHOOL English Public 13 min walk
  • LESCON PUBLIC SCHOOL English Public 14 min walk
  • ECOLE ELEMENTAIRE PAUL DEMERS French Public 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureBayview VillageMedian neighbourhood
Median household income (2020)$83,000$84,500
Households that own their home60%54%
Population (2021)22,33016,813
Homes built in 1960 or before10%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleBayview VillageCity median
Assault439.5636.3
Robbery56.669.5
Auto theft139.8192.6
Theft over $5,00049.946.1
Break and enter176.4172.8
Theft from vehicles169.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.