Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Heritage property: designated (Part IV)
Needs a closer lookOn the City's Heritage Register. Demolition and exterior changes need heritage review.
What it means. Renovations, additions and demolition can take longer, cost more or be refused.
How to confirm. Heritage Planning at the City confirms the status and what it covers. Details
City of Toronto Heritage Register3 open orders or by-law investigations
Needs a closer lookNot resolved in the City's records: 26 254742 ZON 00 IR (Zoning, 2026, status Rescheduled); 24 235780 ZON 00 IV (Notice Issued Zoning, 2024, status Prosecution Initiated); 24 115311 ZON 00 IR (Zoning, 2024, status Prosecution Initiated).
What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.
How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations4 by-law investigations closed in the last two years
Good to knowClosed files (Zoning): 26 140566 ZON 00 IR (Zoning, 2026); 26 121550 ZON 00 IR (Zoning, 2026); 26 107487 ZON 00 IR (Zoning, 2026); and 1 more.
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations9 development applications open within 300 m
Good to know9 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 71 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
11 records on file: more than at 99% of Toronto houses (median 0).
- By-law investigation26 254742 ZON 00 IRRescheduled
Zoning
Oct 15, 2026 · 30 STEPHANIE ST - By-law investigation26 140566 ZON 00 IRClosed
Zoning
Apr 8, 2026 · 30 STEPHANIE ST - By-law investigation26 121550 ZON 00 IRClosed
Zoning
Feb 25, 2026 · 30 STEPHANIE ST - By-law investigation26 107487 ZON 00 IRClosed
Zoning
Jan 21, 2026 · 30 STEPHANIE ST - By-law investigation24 250946 ZON 00 IRClosed
Zoning
Dec 17, 2024 · 30 STEPHANIE ST - By-law investigation24 235780 ZON 00 IVProsecution Initiated
Notice Issued Zoning
Feb 13, 2024 · 30 STEPHANIE ST - By-law investigation24 115311 ZON 00 IRProsecution Initiated
Zoning
Feb 13, 2024 · 30 STEPHANIE ST - Zoning review23 143242 ZZUClosedMay 9, 2023 · 30 STEPHANIE ST
Show 3 older records
- Development application19 169427 STE 10 CDClosed
Proposal to create a standard condominium (189 units)
Jun 11, 2019 · 52 MC CAUL ST · City file - Development application15 265526 STE 20 SAClosed
This application consists of two distinct structures: a 14 storey mixed use building comprised of 189 residential units and 136m2 of grade related retail space located on the southern portion, and a three storey private art gallery located on the northern portion of the site. Both buildings are serviced by a common 2-storey underground parking garage consisting of 96 parking spaces.
Dec 15, 2015 · 10 STEPHANIE ST · City file - Development application14 174774 STE 20 OZClosed
To re-zone the subject lands for the purposes of constructing a two new buildings. A 14 storey residential apartment building containing 184 units with below grade parking and a three-storey building which will be an art gallery.
Jun 16, 2014 · 48 MC CAUL ST
Check before you build
Site-specific exception 900.2.10(693)
Needs a closer look2 site-specific rules and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
On the lands, the permitted maximum gross floor area of a residential building or structure may not exceed a floor space index of 1.5, unless 25% of the dwelling units on the lot are assisted housing units, in which case the maximum gross floor area may exceed the floor space index of 1.5; and [TO: 438-86; 12 (2) 92]
- Rule B
The lands must comply with exception 900.2.10(4).
- Older by-law A
Section 12(1) 116 of former City of Toronto By-law 438-86
- Older by-law B
Section 12(1) 233 of former City of Toronto By-law 438-86.
Lot facts
- Area
- 2,940 m²
- Frontage
- 64.7 m
- Depth
- 45.8 m
- Street
- Stephanie St
- Corner lot
- No
- Public lane
- None
- House footprint
- 769 m²roof up to 12.5 m
- Back yard
- 12.3 mhouse to rear lot line
- Side yards
- 0.5 m and 18.6 mhouse to side lot lines
- Buildings on the lot
- 4house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Major Transit Station Area: Queen-Spadina. The lot is inside the Queen-Spadina Major Transit Station Area approved by the Province (Site and Area Specific Policy 762). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Minimum frontage 4.5 m. Frontage is about 64.7 m: meets the zone minimum. Source
- Zone R (f4.5; d2.0) (x693) (Residential). Chapter 10, section 10.10 of the by-law. Source
- 3 City trees in front of this lot. The City's street tree inventory lists 3 trees at this address: maple, freeman autumn blaze (16 cm), maple, freeman autumn blaze (16 cm), maple, freeman autumn blaze (16 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 100%17 of 17 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 5
- Multiplex permits
- 9
- Development applications
- 23
Within 300 m, last 10 years. 14 suite and multiplex permits: more than at 81% of Toronto houses (median 3). 17 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To construct a new two-storey detached ancillary building containing two laneway suites with a second level south canopy, in the rear yard, abutting Orphanage Mews laneway on the north side, and North Sullivan East Huron laneway on the west side.
34 SULLIVAN ST · Aug 12, 2026 · 301 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-Law 663-2011), for an existing 36-storey mixed-use building, by enclosing the north side outdoor patio for the eating establishment (restaurant).
117 PETER ST · Jul 15, 2026 · 397 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear third storey addition with a balcony (above the existing rear two-storey portion of the dwelling).
52 PHOEBE ST · Mar 11, 2026 · 407 m away - Minor varianceApproved
To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition, a rear first storey covered deck with stairs and a rear second floor rooftop deck.
26 SULLIVAN ST · Jan 21, 2026 · 278 m away - Minor varianceApproved
To alter the existing three-storey mixed-use building by converting the existing office space (Unit 1 located within the basement at the southern portion of the building) into medical office space with accessory uses.
150 BEVERLEY ST · Nov 19, 2025 · 417 m away
Latest activity nearby
- Consent (lot split)Pending
To obtain consent to sever a portion of land for the purpose of a lot addition, and to create and maintain easements/rights-of-way.
317 DUNDAS ST W · Dec 16, 2026 · 243 m away - Consent (lot split)Pending
To obtain consent to sever a portion of land for the purpose of a lot addition, and to create and maintain easements/rights-of-way.
100 MCCAUL ST · Dec 16, 2026 · 160 m away - Zoning review
Closed
84 ST PATRICK ST · Nov 24, 2026 · 159 m away - Minor variancePending
In Process
165 JOHN ST · Nov 24, 2026 · 125 m away - Building permit
Interior Alteration of Existing Group D office- reconfigure existing office spaces, including dividing one room into two meeting rooms and opening another room to create an open workspace - 2nd Floor
190 SIMCOE ST · Nov 24, 2026 · 219 m away - Building permit
Proposal for interior alteration and adding new rear balcony and stairs to convert a single family semi detached dwelling to fourplex
14 SULLIVAN ST · Nov 16, 2026 · 246 m away - Building permit
1 wall sign.***NAWABS LEGENDARY BBQ***
228 QUEEN ST W · Nov 10, 2026 · 164 m away - Building permit
Proposal for interior alterations to convert existing retail store into a restaurant with greater than 30 seats.
241 QUEEN ST W · Nov 9, 2026 · 266 m away - Building permit
Proposed replacement of hot water recirculation lines.
96 ST PATRICK ST · Nov 9, 2026 · 193 m away - Building permit
Localized main roof structural deck repairs including Wood Beam replacement (2 locations), targeted wooden roof slab decking repairs, and targeted roof slab support ledge repairs.
296 RICHMOND ST W · Nov 5, 2026 · 266 m away
Neighbourhood: Kensington-Chinatown
About the area around the lot, not the lot itself.
- Nearest station
- Osgoode Station6 min walk
- Nearest TTC stop
- Queen St West at John St3 min walk
- Nearest cycling route
- Stephanie StBike Lane - Contraflow, 1 min walk
- Nearest traffic count
- 3,153 vehicles in 8 hPhoebe St / Beverley St, 140 m away, Oct 18, 2022
- Serious collisions within 500 m
- 72021–2026, killed or seriously injured: 0 fatal, 5 with pedestrians, 1 with cyclists
- Parks
- Grange Park1 min walk
- St. Patricks Square1 min walk
- Gallery Park5 min walk
Schools within 1 km
- OCAD UNIVERSITY - STUDENT CENTRE University 1 min walk
- OCAD UNIVERSITY - INCLUSIVE DESIGN INSTITUTE University 2 min walk
- OCAD UNIVERSITY - ABOVEGROUND ART SUPPLIES University 2 min walk
- OCAD UNIVERSITY - MAIN BUILDING 416 977-6000 University 3 min walk
- OCAD UNIVERSITY - THE LEARNING ZONE University 4 min walk
- CONTACT ALTERNATIVE SCHOOL English Public 4 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Kensington-Chinatown | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $62,000 | $84,500 |
| Households that own their home | 32% | 54% |
| Population (2021) | 18,120 | 16,813 |
| Homes built in 1960 or before | 26% | 29% |
| Homes needing major repairs | 8% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Kensington-Chinatown | City median |
|---|---|---|
| Assault | 2017.5 | 636.3 |
| Robbery | 193 | 69.5 |
| Shootings | 21.9 | 10.5 |
| Auto theft | 118.4 | 192.6 |
| Theft over $5,000 | 219.3 | 46.1 |
| Break and enter | 443 | 172.8 |
| Theft from vehicles | 850.8 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.