HousePrecheckCheck an address

30 Queen Elizabeth BlvdToronto · zoning, lot size and permit records

Employment · E 1.060.9 × 86.9 m5,271 m²on Queen Elizabeth Blvd

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • 1 development application open within 300 mNew buildings may go up around here in the next years. More change nearby than at 81% of Toronto houses.
N50 m
60.9 m frontage86.9 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • Zoning review26 191156 ZAPClosed
    Jun 25, 2026 · 30 QUEEN ELIZABETH BLVD
  • Building permit16 242706Closed

    Construct a deck at front of property

    Apr 17, 2018 · 30 QUEEN ELIZABETH BLVD
  • Zoning review15 111999 ZSVClosed
    Feb 4, 2015 · 30 QUEEN ELIZABETH BLVD
  • Building permit14 198033Cancelled

    To erect and display one non-illuminated wall sign on the south facing first storey building wall, in conjunction with a brewery located on the premises.**Great Lakes Beer**

    Sep 23, 2014 · 30 QUEEN ELIZABETH BLVD
  • Building permit11 295670Closed

    Install (1) backflow preventor to mechanical floor of *Great Lakes Brewery*

    Oct 28, 2011 · 30 QUEEN ELIZABETH BLVD
  • Zoning review09 164000 ZALCancelled
    Aug 31, 2009 · 30 QUEEN ELIZABETH BLVD
  • Building permit98 083526Closed - Dormant

    THIRD PARTY ROOF SIGN TO IND. BLDG.

    Aug 7, 1998 · 30 QUEEN ELIZABETH BLVD

Lot facts

Area
5,271 m²
Frontage
60.9 m
Depth
86.9 m
Street
Queen Elizabeth Blvd
Corner lot
No
Public lane
None
House footprint
2,385 m²roof up to 9.5 m
Back yard
9.4 mhouse to rear lot line
Side yards
2.8 m and 5.4 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone E 1.0 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source

Around this lot

Minor variances approved
89%8 of 9 decisions
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
0
Development applications
4

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 9 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a two-storey south side addition and a second storey addition above the existing building.

    21 CANMOTOR AVE · Jun 29, 2017 · 447 m away
  • Minor varianceApproved

    To permit parking deficiencies that have resulted from the addition of two tenants located at the mezzanine level of the building.

    10 QUEEN ELIZABETH BLVD · Aug 27, 2015 · 180 m away

Latest activity nearby

  • Minor varianceRefused

    To construct a third storey front addition and a three-storey rear addition. The altered dwelling will be converted into a fourplex.

    530 ROYAL YORK RD · Nov 19, 2026 · 291 m away
  • Building permit

    Interior alteration to an empty warehouse for the proposal of a commercial kitchen space to operate a commissary kitchen.

    15 SINCLAIR ST · Nov 18, 2026 · 178 m away
  • Building permit

    To demolish existing rear detached garage and maintain parking pad

    530 ROYAL YORK RD · Nov 10, 2026 · 291 m away
  • Building permit

    Proposed interior alteration to Costco retail store. Scope of work includes remodel of existing members washroom, including, mechanical, plumbing, and electrical.

    50 QUEEN ELIZABETH BLVD · Oct 30, 2026 · 196 m away
  • Zoning review

    Notice Sent

    7 QUEEN ELIZABETH BLVD · Oct 23, 2026 · 249 m away
  • Zoning review

    Closed

    16 QUEEN ELIZABETH BLVD · Oct 20, 2026 · 108 m away
  • Zoning review

    Closed

    5 SINCLAIR ST · Aug 10, 2026 · 204 m away
  • Zoning review

    Closed

    773-781 THE QUEENSWAY · Aug 3, 2026 · 296 m away
  • Zoning review

    Closed

    801 THE QUEENSWAY · Jul 23, 2026 · 280 m away
  • Zoning review

    Closed

    15 SINCLAIR ST · Jul 10, 2026 · 178 m away

Neighbourhood: Stonegate-Queensway

About the area around the lot, not the lot itself.

Nearest station
Mimico GO Station14 min walk
Nearest TTC stop
Royal York Rd at Sinclair St South Side5 min walk
Nearest cycling route
Royal York RdBike Lane, 5 min walk
Nearest traffic count
8,494 vehicles in 8 hDalesford Rd / Royal York Rd / Sinclair St, 300 m away, Sep 19, 2017
Serious collisions within 500 m
82021–2026, killed or seriously injured: 1 fatal, 3 with pedestrians, 0 with cyclists
Parks
Alan - Oxford Parkette3 min walk
Queensway Park6 min walk
Saunders Crescent Parkette9 min walk

Schools within 1 km

  • ST LOUIS CATHOLIC ELEMENTARY SCHOOL English Separate 7 min walk
  • GEORGE R GAULD JR SCHOOL English Public 10 min walk
  • OAK LEARNERS Private 10 min walk
  • THE MILDENHALL MONTESSORI SCHOOL Private 13 min walk
  • ETOBICOKE SCHOOL OF THE ARTS English Public 14 min walk
  • BEHAVIOUR INNOVATIONS, CHILDREN'S COLLEGE Private 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureStonegate-QueenswayMedian neighbourhood
Median household income (2020)$104,000$84,500
Households that own their home63%54%
Population (2021)25,65016,813
Homes built in 1960 or before55%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleStonegate-QueenswayCity median
Assault465.6636.3
Robbery40.869.5
Homicide3.45.3
Shootings13.610.5
Auto theft193.7192.6
Theft over $5,0006846.1
Break and enter217.5172.8
Theft from vehicles129.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.