Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
TRCA regulated area (49% of lot)
Needs a closer lookPart of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.
What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.
How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details
Ontario Regulation 41/24, TRCA Regulation LimitRavine and natural feature protection (45% of lot)
Needs a closer lookPart of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.
What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.
How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details
Toronto Municipal Code, Chapter 658Environmentally Significant Area: Rowntree Mill Swamp
Needs a closer lookThe lot touches an Environmentally Significant Area shown on Official Plan Map 12.
What it means. Development in or next to the area needs an impact study and may be limited.
How to confirm. City Planning confirms the policies that apply. Details
City of Toronto Official Plan, Map 12Natural Heritage System (45% of lot)
Good to knowPart of the lot is in the Natural Heritage System shown on Official Plan Map 9.
What it means. New buildings or additions in that part need a natural heritage impact study.
How to confirm. City Planning confirms the policies that apply. Details
City of Toronto Official Plan, Map 9
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
No permits, applications or Committee of Adjustment files on this lot in the City's open records.
Lot facts
- Area
- 14,487 m²
- Frontage
- 122 mestimated, irregular lot
- Depth
- 214.8 mestimated, irregular lot
- Street
- Panorama Crt
- Corner lot
- No
- Public lane
- None
- Max height
- —
- Max lot coverage
- —
- Major Transit Station Area: Mount Olive. The lot is inside the Mount Olive Major Transit Station Area approved by the Province (Site and Area Specific Policy 705). Source
- Zone OR (Open Space Recreation). Chapter 90, section 90.30 of the by-law. Source
- 4 City trees in front of this lot. The City's street tree inventory lists 4 trees at this address: kentucky coffeetree (8 cm), kentucky coffeetree (8 cm), kentucky coffeetree (8 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 100%2 of 2 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 0
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 2 variance decisions: no more than at most Toronto houses (median 19).
Latest activity nearby
- Building permit
Repairs of Underground Parking Garage and Installation of new Pedestrian-used Barrier-Free Accessible ramps at P1 & P2 Parking level.
18 PANORAMA CRT · Jul 2, 2025 · 83 m away - Zoning review
Closed
46 PANORAMA CRT · Apr 11, 2024 · 220 m away - Building permit
New door operator and new chair lift
21 PANORAMA CRT · Feb 23, 2024 · 149 m away - Building permit
Proposed Garage Interior Suspended Slab Waterproofing Replacement (Partial) and Localized Concrete Repair (600 m2).
46 PANORAMA CRT · Dec 11, 2023 · 220 m away - Building permit
proposing to remove existing fire alarm panel and replace it with a new one
46 PANORAMA CRT · Nov 15, 2023 · 220 m away - Building permit
proposed alternative solution to protect a portion of the gas line serving the emergency generator with InteramTM E-5A-4 Endothermic Mat (Emat) in accordance with UL ¿ Design No. HNKJ.FP-1 . It is proposed to protect the portion of the gas line from the point where it enters the P1 level (from the gas connection) as it travel across the underside of the level 1 floor slab to the point where the gas line exits the parking garage to run up the side of the building.
18 PANORAMA CRT · Nov 13, 2023 · 83 m away - Building permit
propose to repair existing underground parking garage as thin surface membrane removal and replacement, existing drain body removal and replacement, concrete repairs and painting of concrete
18 PANORAMA CRT · Jun 30, 2023 · 83 m away - Building permit
Revision 01: Ground Floor( Washroom 1005 is out of scope, New proposed DF), Second Floor(B/F WR 2010 washroom layout has been changed, New proposed DF)Plumbing - Proposal for complete accessibility upgrades.
21 PANORAMA CRT · Dec 7, 2022 · 149 m away - Building permit
Proposal for interior alterations to convert the existing storage space into 6 new dwelling units, a new fitness room and multipurpose room on Level P1 of an existing apartment building.
46 PANORAMA CRT · Oct 24, 2022 · 220 m away - Building permit
Interior alterations to washroom and two serveries within an existing church. Insatallation of an exterior cross attached to the building. - St Andrew RC Church
2547 KIPLING AVE · Jun 9, 2022 · 215 m away
Neighbourhood: Mount Olive-Silverstone-Jamestown
About the area around the lot, not the lot itself.
- Nearest station
- Mount Olive Station8 min walk
- Nearest TTC stop
- Kipling Ave at Panorama Crt3 min walk
- Nearest cycling route
- Kipling Ave Bicycle TrlMulti-Use Trail - Boulevard, 3 min walk
- Nearest traffic count
- 19,781 vehicles in 14 hKipling Ave / Mount Olive Dr / Panorama Crt / Kipling Ave Bicycle Trl, 230 m away, Jun 2, 2026
- Serious collisions within 500 m
- 12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
- Parks
- Humberview Park1 min walk
- Rowntree Mills Park1 min walk
- Panorama Park2 min walk
Schools within 1 km
- ST ANDREW CATHOLIC ELEMENTARY SCHOOL English Separate 5 min walk
- NORTH ALBION COLLEGIATE INSTITUTE English Public 5 min walk
- NORTH KIPLING JR MDL SCHOOL English Public 9 min walk
- HIGHFIELD JR SCHOOL English Public 11 min walk
- ALBION LINC English Public 11 min walk
- BEAUMONDE HEIGHTS JR MDL SCHOOL English Public 12 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Mount Olive-Silverstone-Jamestown | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $76,500 | $84,500 |
| Households that own their home | 46% | 54% |
| Population (2021) | 31,345 | 16,813 |
| Homes built in 1960 or before | 14% | 29% |
| Homes needing major repairs | 11% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Mount Olive-Silverstone-Jamestown | City median |
|---|---|---|
| Assault | 788.6 | 636.3 |
| Robbery | 107.3 | 69.5 |
| Homicide | 2.9 | 5.3 |
| Shootings | 20.3 | 10.5 |
| Auto theft | 275.4 | 192.6 |
| Theft over $5,000 | 26.1 | 46.1 |
| Break and enter | 55.1 | 172.8 |
| Theft from vehicles | 130.5 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.