HousePrecheckCheck an address

30 Oakcrest AveToronto · zoning, lot size and permit records

Open space · OR45.7 × 104.0 m4,477 m²on Oakcrest Avecorner, also on Woodbine Ave

Not a home

Oakcrest Park

The City of Toronto's real estate inventory lists Oakcrest Park here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • 1 development application open within 300 m, up to 35 storeysNew buildings may go up around here in the next years. More change nearby than at 81% of Toronto houses.
  • Major Transit Station Area: WoodbineThe City plans more homes around the station: good for transit, and more building over time.
N50 m
45.7 m frontage104.0 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 35 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

No permits, applications or Committee of Adjustment files on this lot in the City's open records.

Lot facts

Area
4,477 m²
Frontage
45.7 m
Depth
104 m
Street
Oakcrest Ave
Corner lot
Yes, also on Woodbine Ave104 m along it
Public lane
None
House footprint
17 m²roof up to 13 m
Back yard
30.3 mhouse to rear lot line
Side yards
3.4 m and 37.5 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Woodbine. The lot is inside the Woodbine Major Transit Station Area approved by the Province (Site and Area Specific Policy 620). Source
  • Zone OR (Open Space Recreation). Chapter 90, section 90.30 of the by-law. Source
  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: oak, bur (8 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
97%28 of 29 decisions
Garden suite permits
1
Laneway suite permits
2
Multiplex permits
1
Development applications
4

Within 300 m, last 10 years. 4 suite and multiplex permits: more than at 54% of Toronto houses (median 3). 29 variance decisions: more than at 62% of Toronto houses (median 19).

Latest activity nearby

  • Building permitdemolition

    Proposed demolition of an existing two-storey mixed use building.

    2100 DANFORTH AVE · Nov 23, 2026 · 279 m away
  • Building permit

    Proposal to convert exsiting office to a Coffee Shop&Bar (30 Seats)

    2017 DANFORTH AVE · Nov 23, 2026 · 278 m away
  • Building permitdemolition

    Proposed demolition of an existing two-storey commercial building.

    2078 DANFORTH AVE · Nov 20, 2026 · 277 m away
  • Building permitdemolition

    Proposed demolition of an existing two-storey mixed use building.

    2106 DANFORTH AVE · Nov 20, 2026 · 281 m away
  • Building permitdemolition

    Proposed demolition of an existing two-storey mixed use building.

    2102-2104 DANFORTH AVE · Nov 20, 2026 · 279 m away
  • Building permitdemolition

    Proposed demolition of an existing two storey commercial building.

    2086-2090 DANFORTH AVE · Nov 20, 2026 · 279 m away
  • Building permit

    Basement plumbing and drain alterations, including the installation of a backwater valve, sump pit, and sump pump.

    91 MOBERLY AVE · Nov 20, 2026 · 206 m away
  • Building permit

    Proposal for the reconstruction of an existing enclosed porch with new stair and guard

    8 CEDARVALE AVE · Nov 18, 2026 · 124 m away
  • Building permit

    Proposed fire alarm system for the building.

    2017 DANFORTH AVE · Nov 16, 2026 · 278 m away
  • Building permit

    Upgrade current water service line to 3/4 inch

    41 EAST LYNN AVE · Nov 16, 2026 · 230 m away

Neighbourhood: East End-Danforth

About the area around the lot, not the lot itself.

Nearest station
Woodbine Station5 min walk
Nearest TTC stop
Woodbine Ave at Merrill Ave1 min walk
Nearest cycling route
Woodbine AveCycle Track, 1 min walk
Nearest traffic count
7,699 vehicles in 8 hWoodbine Ave / Merrill Ave E, 30 m away, Feb 13, 2020
Serious collisions within 500 m
62021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 3 with cyclists
Parks
Oakcrest Parkette1 min walk
Wildwood Crescent Playground4 min walk
Merrill Bridge Road Park4 min walk

Schools within 1 km

  • GLEDHILL JR PUBLIC SCHOOL English Public 8 min walk
  • ST BRIGID CATHOLIC ELEMENTARY SCHOOL English Separate 9 min walk
  • DANFORTH LINC English Public 13 min walk
  • EARL HAIG PUBLIC SCHOOL English Public 13 min walk
  • EARL BEATTY JR & SR PUBLIC SCHOOL English Public 14 min walk
  • BOWMORE ROAD JR & SR PUBLIC SCHOOL English Public 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureEast End-DanforthMedian neighbourhood
Median household income (2020)$90,000$84,500
Households that own their home55%54%
Population (2021)21,84016,813
Homes built in 1960 or before54%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleEast End-DanforthCity median
Assault796.2636.3
Robbery51.869.5
Shootings410.5
Auto theft147.3192.6
Theft over $5,00039.846.1
Break and enter195.1172.8
Theft from vehicles195.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.