HousePrecheckCheck an address

30 Meteor DrToronto · zoning, lot size and permit records

Employment · E 1.041.1 × 80.8 m3,304 m²on Meteor Dr

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
41.1 m frontage80.8 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    1 records on file: more than at 53% of Toronto houses (median 0).

    • Building permit16 220212Cancelled

      Proposal to install a 1 inch backflow prevention device.

      Apr 20, 2017 · 30 METEOR DR

    Lot facts

    Area
    3,304 m²
    Frontage
    41.1 m
    Depth
    80.8 m
    Street
    Meteor Dr
    Corner lot
    No
    Public lane
    None
    House footprint
    988 m²roof up to 15.3 m
    Back yard
    35.1 mhouse to rear lot line
    Side yards
    3.4 m and 12.1 mhouse to side lot lines
    Buildings on the lot
    2house, garage, sheds
    Max height
    —
    Max lot coverage
    —

    House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    • Site and Area Specific Policy 029. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
    • Zone E 1.0 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source
    • 4 City trees in front of this lot. The City's street tree inventory lists 4 trees at this address: maple, norway (49 cm), maple, norway (47 cm), maple, norway (46 cm). Diameter is the trunk at breast height. Source

    Around this lot

    Minor variances approved
    100%1 of 1 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    0

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To maintain the existing hotel.

      221 CARLINGVIEW DR · Sep 25, 2025 · 413 m away
    • Minor varianceApproved

      To maintain the existing hotel.

      221 CARLINGVIEW DR · Sep 25, 2025 · 413 m away
    • Minor varianceApproved

      To permit a vehicle rental establishment.

      171 CARLINGVIEW DR · Apr 11, 2024 · 196 m away
    • Minor varianceApproved

      To maintain a vehicle-related use in the Hotel Indigo. A previous Committee of Adjustment application (A108/17EYK) approved variances relating to permitted use.

      135 CARLINGVIEW DR · May 5, 2022 · 331 m away
    • Minor varianceApproved

      To maintain a vehicle-related use in the Hotel Indigo. A previous Committee of Adjustment application (A705/11EYK) approved variances relating to permitted use.

      135 CARLINGVIEW DR · May 4, 2017 · 331 m away

    Latest activity nearby

    • Building permit

      Change to 1 of the 2 wall signsThe change is revising the main wall sign to be pin mounted acrylic letters instead of channel letters. All other details stay the same. **ADI**

      20 METEOR DR · Oct 28, 2026 · 87 m away
    • Building permit

      Proposed demolition and construction of interior partitions and ceilings, creation of new wall openings, interior fit-up, addition of a new kitchenette and washrooms, and installation of new warehouse racking, including associated electrical and mechanical,

      151 CARLINGVIEW DR · Oct 27, 2026 · 246 m away
    • Zoning review

      Closed

      63 GALAXY BLVD · Aug 6, 2026 · 191 m away
    • Building permit

      Proposed demolition of interior partitions, removal of vault, grinding and sealing of floors.

      215 CARLINGVIEW DR · May 5, 2026 · 251 m away
    • Building permit

      REV01: Proposed revision based on change to number of parking stalls in an Employment Industrial Zone under 60.5.80.10, 2, (A) reduced from 10 to 7.Proposed interior alterations to existing office, warehouse, exterior stucco to be added, new warehouse doors to be added.

      15 METEOR DR · Apr 1, 2026 · 149 m away
    • Zoning review

      Closed

      215 CARLINGVIEW DR · Feb 18, 2026 · 251 m away
    • Building permit

      1 projecting element attached to existing ground pylon sign**POPEYES DRIVE THRU**

      191-195 CARLINGVIEW DR · Oct 20, 2025 · 274 m away
    • Building permit

      Proposal for interior alterations to an existing office/warehouse

      215 CARLINGVIEW DR · Oct 17, 2025 · 251 m away
    • Building permit

      Proposal for interior alterations to remove a portion of the finished front office and re-instate itback to open warehouse condition. The existing washroom shall remain as is - UNIT 208

      215 CARLINGVIEW DR · Sep 5, 2025 · 251 m away
    • Building permit

      A proposal to erect and display four wall signs, all illuminated )internal or external) and displaying static copy.**CHUCK'S ROADHOUSE**

      215 CARLINGVIEW DR · Aug 12, 2025 · 251 m away

    Neighbourhood: West Humber-Clairville

    About the area around the lot, not the lot itself.

    Nearest station
    Viscount Station36 min walk
    Nearest TTC stop
    Carlingview Dr at Meteor Dr4 min walk
    Nearest traffic count
    7,778 vehicles in 8 hCarlingview Dr / Meteor Dr, 240 m away, Nov 3, 2022
    Serious collisions within 500 m
    02021–2026, killed or seriously injured
    Parks
    Trca Lands ( 44)7 min walk

    2021 Census

    FigureWest Humber-ClairvilleMedian neighbourhood
    Median household income (2020)$92,000$84,500
    Households that own their home65%54%
    Population (2021)33,30016,813
    Homes built in 1960 or before13%29%
    Homes needing major repairs4%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleWest Humber-ClairvilleCity median
    Assault933636.3
    Robbery152.469.5
    Homicide2.75.3
    Shootings26.710.5
    Auto theft1320.6192.6
    Theft over $5,000245.946.1
    Break and enter347.5172.8
    Theft from vehicles545.4188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.