HousePrecheckCheck an address

30 Dreamers WayToronto · zoning, lot size and permit records

Also 10 Dreamers Way, 10 Oak St, 12 Oak St, 14 Oak St, 16 Dreamers Way and 22 more

68.1 × 121.4 m8,213 m²on Gerrard St Ecorner, also on Dreamers Way

Not a home

A commercial or mixed-use building

28 different civic addresses share this parcel, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 26 193698 (Revisions for sign permit: Signs 2 & 4 only***BMO***, 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • 4 development applications open within 300 m, up to 35 storeysNew buildings may go up around here in the next years. More change nearby than at 94% of Toronto houses.
N50 m
68.1 m frontage121.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 193698 (Revisions for sign permit: Signs 2 & 4 only***BMO***, 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A0849/21TEY (To alter the redevelopment plan approved for the subject site to permit one 25-storey r..., 2021).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 4 development applications open within 300 m

    Good to know

    4 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 35 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

15 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit26 224582Closed

    Proposed Interior Alterations Bank - see 26 178115 BLD 00 BA

    Sep 11, 2026 · 365 PARLIAMENT ST
  • Building permit26 193698Revision Issued

    Revisions for sign permit: Signs 2 & 4 only***BMO***

    Sep 10, 2026 · 365 PARLIAMENT ST
  • Building permit26 178115Closed

    Interior Fit-out in new Landlord building for a branch of the Bank of MontrealProposed Work includes Fit-out, Electrical, Plumbing and HVAC

    Jul 27, 2026 · 365 PARLIAMENT ST
  • Zoning review26 148286 LPRClosed
    Apr 22, 2026 · 365 PARLIAMENT ST
  • Building permit25 259108Closed

    Proposed interior alteration to office - UNIT #1 (Leasing office fit up within the larger development located at 30 Dreamers Way)

    Dec 11, 2025 · 365 PARLIAMENT ST
  • Development application25 111133 STE 13 CDClosed

    Draft Plan of Condominium for a 10-storey midrise and a 25-storey mixed-use building containing 643 dwelling units.

    Jan 31, 2025 · 365 PARLIAMENT ST · City file
  • Building permit21 250319Closed

    HVAC - Proposal to construct one 25 storey Tower (South Tower) and one 10 storey mid-rise tower (North Tower) on a shared podium with retail at grade, 631 units (304 Units in North Tower) and 2 levels U/G parking. This permit includes only North Tower. (Refer to #21-250273 BLD for South Tower)

    Oct 7, 2024 · 365 PARLIAMENT ST
  • Zoning review23 185761 ZPRClosed
    Aug 8, 2023 · 365 PARLIAMENT ST
Show 7 older records
  • Building permit23 140676Closed

    Installation of electromagnetic locking devices at P1 and 1st level of proposed multi storey towers (Regent Park Block 1)- 3 x doors on P1 North level at exit stairwells- 1 x door on ground from loading area

    May 5, 2023 · 365 PARLIAMENT ST
  • Building permit21 250273Cancelled

    Conditional Permit - Part Permit - Proposal to construct one 25 storey Tower (South Tower) and one 10 storey mid-rise tower (North Tower) on a shared podium with retail at grade, 631 units (327 Units in South Tower) and 2 levels U/G parking. This permit include U/G parking and South & North Tower Tower. (Refer to #21-250319 BLD for North Tower)

    Apr 6, 2023 · 365 PARLIAMENT ST
  • Building permit22 144605Approved

    To permit the use of 65mm standpipe hose valves in exit stairs in lieu of fire hose cabinets containing 65mm and 38mm hose valves with 38mm fire hoses within the floors having Group C (residential), Group E (retail), and Group F, Division 3 (vehicle parking) occupancies.

    May 10, 2022 · 365 PARLIAMENT ST
  • Minor varianceA0849/21TEYApproved

    To alter the redevelopment plan approved for the subject site to permit one 25-storey residential tower on top of a 5-storey podium (South building) and one 10-storey residential building on top of a 7-storey podium (North building), connected by a shared 2-storey mixed-use base building and two storeys of below grade parking in Block 1 of the Regent Park Redevelopment plan. A combined total of 628 residential and 9 retail units will be created and located at the south-east corner of Gerrard Street East and Parliament Street.

    Dec 1, 2021 · 365 PARLIAMENT ST
  • Zoning review20 217261 PSPClosed
    Jul 26, 2021 · 365 PARLIAMENT ST
  • Development application20 217261 STE 13 SAClosed

    A mixed use building comprised of a 10-storey element on Gerrard Street East, stepping down to 7-storeys on Parliament Street and Dreamers Way, connected to a 25-storey tower located at the corner of Parliament Street and Oak Street. The overall development contains 643 dwelling units and 2,626 square metres of retail at grade along Parliament Street and Gerrard Street East.

    Nov 10, 2020 · 365 PARLIAMENT ST · City file
  • Building permit18 133439Closed

    Proposal to install 2 mag locks on the first floor of the existing apartment building.

    Apr 12, 2018 · 295 GERRARD ST E

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
8,213 m²
Frontage
68.1 m
Depth
121.4 m
Street
Gerrard St E
Corner lot
Yes, also on Dreamers Way121.4 m along it
Public lane
None
House footprint
1,756 m²
Back yard
26.5 mhouse to rear lot line
Side yards
4.5 m and 18.6 mhouse to side lot lines
Buildings on the lot
11house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    97%29 of 30 decisions
    Garden suite permits
    0
    Laneway suite permits
    1
    Multiplex permits
    7
    Development applications
    9

    Within 300 m, last 10 years. 8 suite and multiplex permits: more than at 70% of Toronto houses (median 3). 30 variance decisions: more than at 63% of Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To alter the existing two-and-one-half semi-detached building (houseplex), which is currently under construction (Building Permit 25 258356 BLD), by constructing a side (east) basement walkout with a flat roof canopy. Also, to maintain the existing rear second storey roof deck with stairs, and third storey roof deck. There will be two existing units and two new units for a total of four residential dwelling units on this lot (one unit occupying the basement level, two units occupying the first level, and one unit occupying the second and third levels).

      183 CARLTON ST · Jul 22, 2026 · 446 m away
    • Minor varianceApproved

      To alter the existing three-storey mixed-use building by converting the storage room on the second and third levels into seven additional hostel suites (three on the second level, and four on the third level). The existing pharmacy and cafeteria on the ground level, 19 hostel suites on the second level, and 20 hostel suites on the third level will be maintained and unaltered.

      311 SHERBOURNE ST · Jun 3, 2026 · 452 m away
    • Minor varianceApproved

      To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a side (south) two storey addition. Also, to construct rear ground floor and second storey bay windows, a rear second storey balcony, and a rear third storey rooftop pergola and terrace extension (above the second storey roof).

      380 BERKELEY ST · Jun 3, 2026 · 315 m away
    • Minor varianceApproved

      To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear (east) ground floor addition and a rear third storey addition with a rear roof deck.

      21 METCALFE ST · Apr 29, 2026 · 439 m away
    • Minor varianceApproved

      To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition with a ground floor stair landing, and a side (south) basement walkout. The existing basement walkout and rear deck with be demolished, and a portion of the rear second storey roof will be reconstructed. Also, to construct one additional parking space (for a total of two parking spaces), abutting the laneway.

      388 BERKELEY ST · Feb 18, 2026 · 334 m away

    Latest activity nearby

    • Zoning review

      Not Started

      405 PARLIAMENT ST · Nov 23, 2026 · 106 m away
    • Building permitsecondary suite

      CONSTRUCT 1 HOUR FRR WALL IN BASEMENT TO SEPARATE FIRST FLOOR UNIT FROM BASEMENT UNIT [Basement & first floor separate commercial and 2nd & 3rd Residential)

      440 PARLIAMENT ST · Nov 20, 2026 · 238 m away
    • Building permitlaneway suite

      Proposal to construct a new laneway suite (Unit # R)

      9 SPRUCE ST · Nov 12, 2026 · 199 m away
    • Minor variancePending

      In Progress

      306 GERRARD ST E · Nov 10, 2026 · 115 m away
    • Building permit

      REVISION-01Propose to relocate washer/dryer from ground floor to second-floor mechanical room, convert existing ground-floor enclosure into a washroom, and add a capped plumbing rough-in for a future kitchenette sink.

      29 OAK ST · Oct 28, 2026 · 101 m away
    • Building permit

      Basement underpinning

      321 ONTARIO ST · Oct 22, 2026 · 256 m away
    • Zoning review

      Closed

      457 PARLIAMENT ST · Oct 12, 2026 · 266 m away
    • Zoning review

      Closed

      306 GERRARD ST E · Oct 7, 2026 · 115 m away
    • Building permit

      Proposed Fire Damage Restoration - BLD & HVA - To restore the unit to pre-loss conditions, complete removal and replacement of the unit interior finishes will be required. Selective removal and replacement of the fire damaged floor joists shall be conducted. Following the reinstallation of the floor joists, the jack posts must be installed to the underside of the roof joists.

      401 PARLIAMENT ST · Sep 28, 2026 · 89 m away
    • Building permit

      1 wall sign**1 OAK DENTAL**

      1 OAK ST · Sep 23, 2026 · 91 m away

    Neighbourhood: Regent Park

    About the area around the lot, not the lot itself.

    Nearest station
    TMU Station21 min walk
    Nearest TTC stop
    Parliament St at Gerrard St East1 min walk
    Nearest cycling route
    Gerrard St EBike Lane, 1 min walk
    Nearest traffic count
    18,435 vehicles in 14 hGerrard St E / Parliament St (South), 80 m away, Jul 9, 2024
    Serious collisions within 500 m
    62021–2026, killed or seriously injured: 1 fatal, 5 with pedestrians, 0 with cyclists
    Parks
    Oak Street Parkette1 min walk
    Anniversary Park2 min walk
    Regent Park4 min walk

    Schools within 1 km

    • LORD DUFFERIN JR & SR PUBLIC SCHOOL English Public 1 min walk
    • SPRUCECOURT JR PUBLIC SCHOOL English Public 6 min walk
    • NELSON MANDELA PARK PUBLIC SCHOOL English Public 9 min walk
    • MONSIGNOR FRASER - ST MARTIN CAMPUS English Separate 11 min walk
    • WINCHESTER JR & SR PUBLIC SCHOOL English Public 11 min walk
    • LIBERTY PREP SCHOOL Private 12 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureRegent ParkMedian neighbourhood
    Median household income (2020)$65,500$84,500
    Households that own their home30%54%
    Population (2021)12,75016,813
    Homes built in 1960 or before13%29%
    Homes needing major repairs5%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleRegent ParkCity median
    Assault947.8636.3
    Robbery83.569.5
    Shootings610.5
    Auto theft95.4192.6
    Theft over $5,00011.946.1
    Break and enter166.9172.8
    Theft from vehicles125.2188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.