HousePrecheckCheck an address

30 Chapman AveToronto · zoning, lot size and permit records

Open space · OR68.8 × 177.1 m12,154 m²on Chapman Avecorner, also on Avis Cres

Not a home

George Webster Park

The City of Toronto's real estate inventory lists George Webster Park here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Permits or applications open on this parcelRecent records on this lot: 26 128195 (Proposed demolition of existing washroom building for the park and replace with 2 new p..., 2026). Larger work can mean noise and trucks next door; read what each one is for.
N50 m
68.8 m frontage177.1 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

2 records on file: more than at 72% of Toronto houses (median 0).

  • Building permit26 128195Permit Issueddemolition

    Proposed demolition of existing washroom building for the park and replace with 2 new prefabricated washrooms.

    Apr 16, 2026 · 30 CHAPMAN AVE
  • Building permit15 174035Inspection

    Water and san sewer connection for new splash pad at George Webster park

    Aug 6, 2015 · 30 CHAPMAN AVE

Lot facts

Area
12,154 m²
Frontage
68.8 m
Depth
177.1 m
Street
Chapman Ave
Corner lot
Yes, also on Avis Cres177.1 m along it
Public lane
None
House footprint
Not showna new house or demolition permit since the City's 3D survey
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone OR (Open Space Recreation). Chapter 90, section 90.30 of the by-law. Source

Around this lot

Minor variances approved
100%12 of 12 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
3
Development applications
1

Within 300 m, last 10 years. 3 suite and multiplex permits: no more than at most Toronto houses (median 3). 12 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Proposal for installation of Main Drain Pipe "Backwater Valve".

    152 FERRIS RD · Nov 4, 2026 · 260 m away
  • Building permit

    Proposed interior alteration to replace a load bearing wall on the ground floor with posts and beams.

    18 MUNFORD CRES · Oct 28, 2026 · 169 m away
  • Zoning review

    Notice Sent

    148 GLEN ALBERT DR · Sep 10, 2026 · 188 m away
  • Zoning review

    Notice Sent

    148 GLEN ALBERT DR · Sep 10, 2026 · 188 m away
  • Building permit

    Proposal for a detached deck, with an area of 448 Square Feet

    36 MUNFORD CRES · Sep 2, 2026 · 87 m away
  • Building permitmultiplex, secondary suite

    INTERIOR ALTERATION TO EXISTING HOUSE FOR SECONDARY DWELING IN THE BASEMENT. NEW REAR SIDE DECK AND CHANGES TO FRONT PORCH.

    34 HALSEY AVE · Sep 1, 2026 · 261 m away
  • Zoning review

    Cancelled

    49 CHAPMAN AVE · Aug 31, 2026 · 169 m away
  • Building permitsecondary suite

    PROPOSED BASEMENT SECONDARY SUITE AND INTERIOR ALTERATIONS

    3 ELMONT DR · Jul 3, 2026 · 267 m away
  • Building permit

    REV 01: Proposal for door opening from kitchen to garage Proposal for interior alterations to the existing single family dwelling and converting the existing front garage into a habitable space.

    21 MUNFORD CRES · May 26, 2026 · 96 m away
  • Building permitsecondary suite

    PROPOSED LEGAL BASEMENT AND INTERIOR ALTERATION

    3 ELMONT DR · May 20, 2026 · 267 m away

Neighbourhood: O'Connor-Parkview

About the area around the lot, not the lot itself.

Nearest station
Victoria Park Station21 min walk
Nearest TTC stop
10 Gower St - Gower Park Place4 min walk
Nearest cycling route
Taylor Creek TrlMulti-Use Trail - Entrance, 5 min walk
Nearest traffic count
362 vehicles in 8 hCurran Dr / Glen Albert Dr, 130 m away, Jan 16, 2003
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 1 with cyclists
Parks
George Webster Park1 min walk
Joshua Cronkwright Parkette4 min walk
Taylor Creek Park4 min walk

Schools within 1 km

  • GEORGE WEBSTER ELEMENTARY SCHOOL English Public 2 min walk
  • GORDON A BROWN MDL SCHOOL English Public 13 min walk
  • CRESCENT TOWN ELEMENTARY SCHOOL English Public 14 min walk
  • COMMUNITY LIFE CHRISTIAN SCHOOL Private 14 min walk
  • ABACUS MONTESSORI Private 14 min walk
  • SELWYN ELEMENTARY SCHOOL English Public 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureO'Connor-ParkviewMedian neighbourhood
Median household income (2020)$77,000$84,500
Households that own their home46%54%
Population (2021)18,40516,813
Homes built in 1960 or before48%29%
Homes needing major repairs10%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleO'Connor-ParkviewCity median
Assault755.6636.3
Robbery43.669.5
Shootings4.810.5
Auto theft179.2192.6
Theft over $5,00038.746.1
Break and enter77.5172.8
Theft from vehicles193.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.