Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Heritage property: in a Heritage Conservation District (Part V)
Needs a closer lookOn the City's Heritage Register. Demolition and exterior changes need heritage review.
What it means. Renovations, additions and demolition can take longer, cost more or be refused.
How to confirm. Heritage Planning at the City confirms the status and what it covers. Details
City of Toronto Heritage RegisterWork or applications in progress
Good to knowRecent records on this lot: 19 261546 STE 10 SA (Site plan application for a proposed 57-storey non-residential building, 2019).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications1 development application open within 300 m
Good to know1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 57 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
7 records on file: more than at 97% of Toronto houses (median 0).
- Zoning review19 261546 PSPClosedSep 3, 2020 · 30 BAY ST
- Development application19 261546 STE 10 SAUnder Review
Site plan application for a proposed 57-storey non-residential building.
Dec 16, 2019 · 30 BAY ST · City file - Zoning review18 120884 PRZClosedFeb 27, 2018 · 30 BAY ST
- Development application18 120884 STE 28 OZClosed
Proposal for a rezoning application related to a 60 storey office tower
Feb 23, 2018 · 30 BAY ST · City file - Zoning review05 163181 ZPRClosedJul 21, 2005 · 30 BAY ST
- Zoning review92 025232 LTOClosedFeb 28, 1992 · 30 BAY ST
- Zoning review82 026304 LTOClosedJul 19, 1982 · 30 BAY ST
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 4,148 m²
- Frontage
- 57.4 m
- Depth
- 74 m
- Street
- Lake Shore Blvd W
- Corner lot
- No
- Public lane
- None
- House footprint
- 601 m²roof up to 32.3 m
- Back yard
- 9.7 mhouse to rear lot line
- Side yards
- 10.3 m and 16 mhouse to side lot lines
- Buildings on the lot
- 1house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
Around this lot
- Minor variances approved
- 100%6 of 6 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 3
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 6 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1012-2022), for a new 59-storey mixed-use building (with four levels of below-grade parking, and a total of 974 dwelling units, of which 78 units are affordable rental units), by reducing the minimum number of residential visitor parking spaces and long-term bicycle parking spaces.
200 QUEENS QUAY W · Nov 12, 2025 · 319 m away - Minor varianceApproved
To alter the development standards for a 92-storey mixed-use building (Tower 2), as approved under Site Specific Zoning By-law 1250-2023 (By-law 249-2020(LPAT)), by increasing the number of storeys and building height from 92-storeys (289 m) to 95-storeys (306.4 m). There will be a total of 1,014 residential dwelling units within this tower.
7 YONGE ST · Sep 3, 2025 · 357 m away - Minor varianceApproved
To alter the development standards for a 105-storey mixed-use building (as approved under Site Specific Zoning By-law 1250-2023) by increasing the building height and to permit an emergency generator on the roof of the building to exceed the maximum permitted building height. The new 106-storey mixed-use building will contain a total of 958 residential dwelling units, retail uses located on the ground floor, and a hotel use located on the 1st to 12th levels.
7 YONGE ST · Apr 23, 2025 · 357 m away - Minor varianceApproved
To alter the existing 25-storey building (Unit 108/108A and Unit 109) by permitting a side (north) ground level patio and associated structures (tables and planters) within the colonnade.
20 BAY ST · Jan 15, 2025 · 115 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1012-2022), for a new 59-storey mixed-use building, by reducing the minimum number of residential dwelling units that shall contain two or more bedrooms.
200 QUEENS QUAY W · Dec 6, 2023 · 319 m away
Latest activity nearby
- Building permit
Proposal for interior alterations to existing office.
25 YORK ST · Nov 24, 2026 · 246 m away - Building permit
Proposal to construct a canopy at ground floor Galleria Entrance.
25 YORK ST · Nov 24, 2026 · 246 m away - Building permit
REV03: Addition of new partition and door to enclose Cafe / Lunch Room area on east side of floor plan. REV02: Proposed revision of office layout scope of work as shown on submitted drawings. Interior Alterations: Extensive Renovation, demolition of all existing interior buildout, construction of new full floor office layout.Rev 01 - Office layout revisions throughout scope of work as shown on submitted drawingsProposal for interior alterations to existing office space on the 8th floor - Healthcare of Ontario Pension Plan
1 YORK ST · Nov 23, 2026 · 190 m away - Building permit
Rev 01: Addition of fire alarm speakers and strobesINTERIOR ALTERATIONS TO EXISTING OFFICE SPACE - LEVEL 4
10-20 BAY ST · Nov 20, 2026 · 136 m away - Building permit
Proposal for interior alterations to fit out new office space
88 QUEENS QUAY W · Nov 19, 2026 · 155 m away - Building permit
Proposal for interior alterations within an existing office
88 QUEENS QUAY W · Nov 18, 2026 · 155 m away - Building permit
Interior alterations - new laundry area in existing storage room
40 BAY ST · Nov 17, 2026 · 136 m away - Building permit
Proposal for Interior Alterations to an existing tenant space.
81 BAY ST · Nov 16, 2026 · 225 m away - Building permit
Proposal for interior alterations on floor 9.
81 BAY ST · Nov 16, 2026 · 225 m away - Building permit
Proposal for interior alterations for a new layout for 2 office units
20 BAY ST · Nov 16, 2026 · 115 m away
Neighbourhood: St Lawrence-East Bayfront-The Islands
About the area around the lot, not the lot itself.
- Nearest station
- Queens Quay/Ferry Docks Station2 min walk
- Nearest TTC stop
- Bay St at Harbour St South Side - Jack Layton Ferry Terminal2 min walk
- Nearest cycling route
- Harbour StMulti-Use Trail - Boulevard, 1 min walk
- Nearest traffic count
- 11,026 vehicles in 8 hLake Shore Blvd W / Bremner Blvd, 60 m away, Apr 21, 2009
- Serious collisions within 500 m
- 142021–2026, killed or seriously injured: 0 fatal, 7 with pedestrians, 1 with cyclists
- Parks
- Love Park2 min walk
- Harbour Square Park Lands3 min walk
- Toronto Waterfront Park4 min walk
Schools within 1 km
- DOWNTOWN ALTERNATIVE SCHOOL English Public 15 min walk
- KEYSTONE INTERNATIONAL SCHOOLS Private 15 min walk
- ST MICHAEL CATHOLIC ELEMENTARY SCHOOL - BLDG 1 English Separate 16 min walk
- VICTORIA STREET LINC English Public 16 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | St Lawrence-East Bayfront-The Islands | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $87,000 | $84,500 |
| Households that own their home | 40% | 54% |
| Population (2021) | 31,285 | 16,813 |
| Homes built in 1960 or before | 3% | 29% |
| Homes needing major repairs | 3% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | St Lawrence-East Bayfront-The Islands | City median |
|---|---|---|
| Assault | 1059.7 | 636.3 |
| Robbery | 96.3 | 69.5 |
| Shootings | 4.5 | 10.5 |
| Auto theft | 24.6 | 192.6 |
| Theft over $5,000 | 78.4 | 46.1 |
| Break and enter | 163.5 | 172.8 |
| Theft from vehicles | 163.5 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.