Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
TRCA regulated area (100% of lot)
Needs a closer lookPart of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.
What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.
How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details
Ontario Regulation 41/24, TRCA Regulation Limit2 building permits open, the oldest since 2010
Needs a closer lookStill open in the City's records: 19 106149 (Proposed interior alterations to add a mezzanine within an existing film studio space o..., 2019, status Inspection); 07 249408 (REVISION TO EXISTING SITE SERVICING PERMIT - REVISION TO ROOF DRAINAGE OFF OF BLOCK 3 R..., 2010, status Revision Issued).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Natural Heritage System (3% of lot)
Good to knowPart of the lot is in the Natural Heritage System shown on Official Plan Map 9.
What it means. New buildings or additions in that part need a natural heritage impact study.
How to confirm. City Planning confirms the policies that apply. Details
City of Toronto Official Plan, Map 910 Committee of Adjustment files on this lot
Good to know9 approved. B0047/21TEY (To obtain consent to establish a mortgage over a portion of the property known as 101 C..., 2021); B0023/20TEY (To obtain consent to a long-term lease in excess of 21 years, 2020); B0022/20TEY (To obtain consent to a long-term lease in excess of 21 years, 2020); and 7 more.
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
45 records on file: more than at 100% of Toronto houses (median 0).
- Building permit20 197292Closed
Revision 01 - Addition of a domestic cold water makeup provision for the site irrigation system.Plumbing - Proposed to construct 3 Storey Building comprised of 3 sound stages for Media Production, two support workshops, and office.
Feb 21, 2023 · 101 COMMISSIONERS ST - Building permit22 126082Closed
To erect and display eleven first party non-illuminated wall signs, displaying static copy.*****VARIOUS IDENTIFICATION SIGNS*****
Jun 17, 2022 · 101 COMMISSIONERS ST - Consent (lot split)B0047/21TEYApproved
To obtain consent to establish a mortgage over a portion of the property known as 101 COMMISSIONERS ST(1 and 17 BASIN ST).
Jun 16, 2021 · 101 COMMISSIONERS ST - Building permit20 197579Cancelled
Phase 2B - Proposed construction of a new 1-storey industrial building [2,266sm] for communications and broadcasting establishment.. *Pinewood Toronto Studios*
Sep 23, 2020 · 101 COMMISSIONERS ST - Building permit20 148505Closed
FS - Sprinkler Shop Drawing - Proposal to build a new one storey medium hazard industrial building (group F2) for communications and broadcasting establishment. A single story building, comprised of 2 sound stages for media production and amenity spaces(washrooms and various rooms that support the sound stages). Building construction will consist ofpoured concrete foundations, steel superstructure, precast concrete walls for sound stages, insulatedmetal panels walls for amenity area. All areas of the building will be fully sprinklered and with a multizone hvac system. The entire building pad will have an under-slab vapor intrusion protection system.
Jul 15, 2020 · 101 COMMISSIONERS ST - Consent (lot split)B0023/20TEYApproved
To obtain consent to a long-term lease in excess of 21 years.
Jul 9, 2020 · 101 COMMISSIONERS ST - Consent (lot split)B0022/20TEYApproved
To obtain consent to a long-term lease in excess of 21 years.
Jul 9, 2020 · 101 COMMISSIONERS ST - Consent (lot split)SYS 4732144PendingMar 11, 2020 · 101 COMMISSIONERS ST
Show 37 older records
- Zoning review19 263379 PSPClosedJan 13, 2020 · 101 COMMISSIONERS ST
- Development application19 263379 STE 14 SAClosed
Phase 2B: Castlepoint Numa has filed an application for Site Plan Control. The application seeks site plan approval for a one-storey building used for communication and broadcasting in the Pinewood Toronto Studios campus within the Port Lands. The building is currently built, having benefited from a temporary building permit issued by Toronto Buildings. The site plan process will secure the building for a longer time period than what a temporary building permit can provide, which is typically between 6 months to a year. The proposed building is situated on lands that will be part of the future Broadview Extension, and as such will need to be demolished at a certain point in the future to accommodate the Broadview Extension. The applicant acknowledges this requirement and it will be reflected in the Notice of Approval Conditions.
Dec 19, 2019 · 101 COMMISSIONERS ST · City file - Building permit19 158815Closed
Stand alone sprinkler permit associated with 19-122401 TPS - Proposal to construct an addition to the temporary communication and broadcasting structure approved under permit 18-250917 TPS 00.
Jun 27, 2019 · 101 COMMISSIONERS ST - Building permit19 122401Closed
HVAC - Proposal to construct a temporary communication and broadcasting establishment to be erected , March 29, 2019 and dismantled Sept 29, 2019.
May 10, 2019 · 101 COMMISSIONERS ST - Building permit19 132500Closed
Site Service Permit for a Temporary Structure to be used for communication and broadcasting.
Mar 29, 2019 · 101 COMMISSIONERS ST - Building permit19 106149Inspection
Proposed interior alterations to add a mezzanine within an existing film studio space on the ground floor.
Feb 11, 2019 · 101 COMMISSIONERS ST - Building permit18 250917Closed
HVAC - Proposal to construct a temporary communication and broadcasting establishment to be erected December 1st 2018, and dismantled June 1st, 2018.
Jan 9, 2019 · 101 COMMISSIONERS ST - Zoning review18 238507 PSPClosedOct 11, 2018 · 101 COMMISSIONERS ST
- Development application18 238507 STE 30 SAClosed
Site Plan Control application for a new communications and broacasting building (20,540 square metres). Pinewood Studios
Oct 5, 2018 · 101 COMMISSIONERS ST · City file - Building permit18 159319Closed
BUILDING C - Proposal to construct a 1 storey broadcasting & communications establishment. 101 Commissioners St and 1 & 17 Basin St.
Aug 27, 2018 · 101 COMMISSIONERS ST - Building permit18 155080Closed
BUILDING B - Proposal to construct a 1 storey broadcasting & communications establishment. 101 Commissioners St and 1 & 17 Basin St.
Aug 27, 2018 · 101 COMMISSIONERS ST - Consent (lot split)B0035/18TEYApproved
To obtain consent to a long-term lease in excess of 21 years.
Jun 13, 2018 · 101 COMMISSIONERS ST - Building permit17 274954Closed
Proposal to construct a 1 storey broadcasting & communications establishment. 101 Commissioners St and 1 & 17 Basin St.
Mar 8, 2018 · 101 COMMISSIONERS ST - Consent (lot split)B0051/16TEYApproved
To obtain consent to sever the property into two lots and to grant a long-term lease in excess of 21 years.
Feb 1, 2017 · 101 COMMISSIONERS ST - Zoning review16 200896 PSPClosedAug 10, 2016 · 101 COMMISSIONERS ST
- Development application16 200896 STE 30 SAClosed
Castlepoint Numa, on behalf of Toronto Waterfront Studios Development Inc. (TWDSI), has submitted a Site Plan Control application (#16-200896 STE 30 SA) to develop the lands at 101 Commissioners Street and 1 and 17 Basin Street with a 3-storey, 6,724 square metre office building (purpose built film and television support facility) with broadcasting and communication uses, and office uses, and a temporary surface parking lot for 95 parking spaces. The site is located within Pinewood Toronto Studies and the site is owned by the Toronto Port Lands Company (TPLC). A related application for consent, in order to support the long-term lease agreement between the TWSDI and TPLC, has also been submitted to the City.
Aug 3, 2016 · 101 COMMISSIONERS ST - Building permit14 252191Closed
HVAC - Includes kitchen exhaust -Interior alteration to ground floor to create accessory kitchen/food prep area in existing film studio. Block 8 - Building A. Pinewood. Convenience address - 21 Basin St.
Dec 3, 2014 · 101 COMMISSIONERS ST - Building permit07 249408Revision Issued
REVISION TO EXISTING SITE SERVICING PERMIT - REVISION TO ROOF DRAINAGE OFF OF BLOCK 3 ROOF.Site Servicing permit for buildings 2, 3, 7, 8a, 8b - see building permit numbers 06-175640, 06-186519, 06193897, 07104695
Jan 27, 2010 · 101 COMMISSIONERS ST - Building permit07 266350Closed
revision to existing sprinkler permit - revision to add standpipe system - -Sprinkler permit for Block 7 of FilmPORT
Oct 7, 2008 · 101 COMMISSIONERS ST - Building permit08 117605Closed
Sprinklers in connection to BLD 07 104695. BLOCK 3 STAGE 4
Jul 23, 2008 · 101 COMMISSIONERS ST - Zoning review08 164762 PSPClosedJun 2, 2008 · 101 COMMISSIONERS ST
- Building permit07 264370Closed
new sprinkler system Block 2
Apr 7, 2008 · 101 COMMISSIONERS ST - Zoning review08 120499 ZPRClosedMar 19, 2008 · 101 COMMISSIONERS ST
- Building permit07 104695Closed
Construction of new industrial building - BLOCK 3 STAGE 4
Feb 26, 2008 · 101 COMMISSIONERS ST - Building permit07 266356Closed
Sprinkler permit for Block 8A and 8B
Nov 13, 2007 · 101 COMMISSIONERS ST - Building permit06 193897Closed
Drain - Construction of new industrial building - Sound Stage - Building 2. DWG's resubmitted on Jan 5/2007
Sep 24, 2007 · 101 COMMISSIONERS ST - Building permit06 186519Closed
Drain - Construction of new industrial building - Sound Stage - Block 7
Sep 24, 2007 · 101 COMMISSIONERS ST - Building permit06 175640Closed
Drain - Proposed 2 ( Two) No's Industrial buildings known as #8A - 2 Storey, 1448 m/sq, and # 8B - 1 storey, 929 m/sq. Geotechnical Soil Report included.These are the first two of five proposed for this site. Site Plan Approval 05-211296 STE and 06-101153 pending.
Sep 24, 2007 · 101 COMMISSIONERS ST - Consent (lot split)B0045/07TEYApproved
To amend an existing long-term lease and mortgage involving 47,301 m2, which was approved by the Committee of Adjustment in a decision of October 2006, by removing Part 3 and a 0.75 m buffer strip of land (79 m2) at the eastern end of Part 35 from the balance of the leased lands and to create an easement/right-of-way over the buffer strip of land in favour of Toronto Film Studios.
May 23, 2007 · 101 COMMISSIONERS ST - Zoning review06 189445 ZPUClosedNov 7, 2006 · 101 COMMISSIONERS ST
- Consent (lot split)B0107/06TEYApproved
This site is located on the south side of Commissioners Street. In June 2005, the Committee of Adjustment approved a consent application to permit a lease of these lands to Toronto Film Studios for a period in excess of 21 years. The current application is necessary as these lands are being developed in phases and consent is now required to permit a lease involving an area of approximately 47,301 square metres comprising Phase 1 of the Filmport lands for a period in excess of 21 years. This parcel is indicated on a Draft Reference Plan of Survey on file with the application.
Oct 11, 2006 · 101 COMMISSIONERS ST - Building permit06 172482Closed
Demolish 1-storey industrial warehouse.
Sep 29, 2006 · 101 COMMISSIONERS ST - Zoning review06 101153 PSPClosedJan 9, 2006 · 101 COMMISSIONERS ST
- Consent (lot split)B0063/05TEYApproved
This site encompasses a large tract of land on the south side of Commissioners Street in the Portlands district. The applicant, City of Toronto Economic Development Corporation, is seeking the consent of the Committee of Adjustment to lease the eastern portion of this site, municipally known as No. 101 Commissioners Street and 1 and 17 Basin Street for a period in excess of 21 years to Toronto Film Studios for the purposes of developing these lands with a communications and broadcasting establishment and associated uses. An accompaying application (C of A File No. A0331/05TEY) seeks relief from the provisions of Zoning By-law No. 438-86, as amended, to facilitate these uses.
Jun 15, 2005 · 101 COMMISSIONERS ST - Minor varianceA0331/05TEYApproved
This site incorporates a large tract of land on the south side of Commissioners Street in the Portlands district and presently contains a fuel tank distribution terminal, storage Warehouse Class "A" and vacant land. Relief from the provisions of Zoning By-law No. 438-86, as amended, is being requested to develop these lands with a communications and broadcasting establishment and associated uses. An accompanying application (C of A File No. B0063/05TEY) seeks the consent of the Committee of Adjustment to allow the owner of these lands, City of Toronto Economic Development Corporation (TEDCO), to enter into a long-term lease with Toronto Film Studios for a portion of the lands identified as No. 101 Commissioners Street and 1 and 17 Basin Street.
Jun 15, 2005 · 101 COMMISSIONERS ST - Zoning review05 121601 ZPRClosedApr 8, 2005 · 101 COMMISSIONERS ST
- Zoning review03 112166 ZPRClosedMar 3, 2003 · 101 COMMISSIONERS ST
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 60,756 m²
- Frontage
- 226 mestimated, irregular lot
- Depth
- 338.9 mestimated, irregular lot
- Street
- Commissioners St
- Corner lot
- No
- Public lane
- None
- Max height
- —
- Max lot coverage
- —
Around this lot
- Minor variances approved
- —no decisions on file
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 2
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To permit a communications and broadcasting establishment.
29 BASIN ST · May 17, 2018 · 371 m away - Minor varianceApproved
This site incorporates a large tract of land on the south side of Commissioners Street in the Portlands district and presently contains a fuel tank distribution terminal, storage Warehouse Class "A" and vacant land. Relief from the provisions of Zoning By-law No. 438-86, as amended, is being requested to develop these lands with a communications and broadcasting establishment and associated uses. An accompanying application (C of A File No. B0063/05TEY) seeks the consent of the Committee of Adjustment to allow the owner of these lands, City of Toronto Economic Development Corporation (TEDCO), to enter into a long-term lease with Toronto Film Studios for a portion of the lands identified as No. 101 Commissioners Street and 1 and 17 Basin Street.
101 COMMISSIONERS ST · Jun 15, 2005 · 197 m away - Minor varianceApproved
Maintain a trailer and storage shed having dimensions of 3.05 by 12.19 metres on the existing vacant land, for use as a sales and hire garage.
1 BASIN ST · Aug 22, 2001 · 134 m away
Latest activity nearby
- Building permit
Proposal for interior alterations
225 COMMISSIONERS ST · Jul 22, 2024 · 164 m away - Building permit
To erect and display four first party signs, illuminated and displaying static copy, with the following details:Sign 1 is a ground sign, with three faces, located on the north frontage, along Commissioners St- Face 1 dimensions: 1.91m L x 3.34m W - Face 2 dimensions: 2.76m L x 1.91m W- Face 3 dimensions: 1.91m L x 21.56m WSign 2 is a wall sign, with a face measuring 0.97m vertically by 13.99m horizontally, located at the mechanical penthouse, on the north elevation.Sign 3 is a projecting sign, with a face measuring 11.63m vertically by 0.85m horizontally , located from the third to the uppermost storeys, on the west elevation.Sign4 is a wall sign, with a face measuring 4.07m vertically by 2.94m horizontally, located at the mechanical penthouse, on the west elevation.**PINEWOOD TORONTO STUDIOS**(See ZMP #22-205441).
225 COMMISSIONERS ST · Apr 28, 2023 · 164 m away - Building permit
Revision 01 - Addition of a domestic cold water makeup provision for the site irrigation system.Plumbing - Proposed to construct 3 Storey Building comprised of 3 sound stages for Media Production, two support workshops, and office.
101 COMMISSIONERS ST · Feb 21, 2023 · 197 m away - Zoning review
Closed
225 COMMISSIONERS ST · Sep 19, 2022 · 164 m away - Building permit
Interior alteration to existing office space
225 COMMISSIONERS ST · Sep 2, 2022 · 164 m away - Building permit
Application for a permit to erect and display fifteen non-illuminated wall signs.*****VARIOUS IDENTIFICATION SIGNS*****
17-21 BASIN ST · Jun 30, 2022 · 227 m away - Building permit
To erect and display eleven first party non-illuminated wall signs, displaying static copy.*****VARIOUS IDENTIFICATION SIGNS*****
101 COMMISSIONERS ST · Jun 17, 2022 · 197 m away - Building permit
HVAC - Proposal for interior alterations to existing office space - Pinewood Toronto Studios Inc.
225 COMMISSIONERS ST · Apr 13, 2022 · 164 m away - Consent (lot split)Approved
To obtain consent to establish a mortgage over a portion of the property known as 101 COMMISSIONERS ST(1 and 17 BASIN ST).
101 COMMISSIONERS ST · Jun 16, 2021 · 197 m away - Building permit
Phase 2B - Proposed construction of a new 1-storey industrial building [2,266sm] for communications and broadcasting establishment.. *Pinewood Toronto Studios*
101 COMMISSIONERS ST · Sep 23, 2020 · 197 m away
Neighbourhood: South Riverdale
About the area around the lot, not the lot itself.
- Nearest station
- King Station47 min walk
- Nearest TTC stop
- Commissioners St at Don Roadway East Side4 min walk
- Nearest cycling route
- Biidaasige Park TrlMulti-Use Trail, 4 min walk
- Nearest traffic count
- 5,109 vehicles in 14 hSaulter St S / Commissioners St, 270 m away, Oct 6, 2026
- Serious collisions within 500 m
- 02021–2026, killed or seriously injured
- Parks
- Biidaasige Park2 min walk
- Cherry Beach Clarke Beach Park8 min walk
- McCleary Park8 min walk
2021 Census
| Figure | South Riverdale | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $100,000 | $84,500 |
| Households that own their home | 57% | 54% |
| Population (2021) | 27,815 | 16,813 |
| Homes built in 1960 or before | 52% | 29% |
| Homes needing major repairs | 7% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | South Riverdale | City median |
|---|---|---|
| Assault | 828.7 | 636.3 |
| Robbery | 69.3 | 69.5 |
| Shootings | 3.2 | 10.5 |
| Auto theft | 217.4 | 192.6 |
| Theft over $5,000 | 88.2 | 46.1 |
| Break and enter | 264.7 | 172.8 |
| Theft from vehicles | 349.8 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.