Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 3 New St
3 New St is on a 11.1 m by 16.3 m lot on New St in Annex. This lot is not covered by Toronto's city-wide zoning by-law 569-2013, so a by-law of the former city or borough most likely still applies. Toronto Building can confirm which one. The property is inside a Heritage Conservation District, so many outside changes need a City heritage permit.
The City has 8 records on this lot since 2001. That is more than at 98% of Toronto houses. In 2026, a Committee of Adjustment application was filed: "To alter the existing three-storey building by constructing a rear third storey addition (converting the existing third floor balcony into habitable space), a…". Status: closed. In 2013, a building permit was filed: "Revision to change the use from office to live/work space, add a stair for roof access and minor interior alterations". Status: closed. In 2004, a building permit was filed: "To install sprinklers in basement and ground floors". Status: closed - dormant. Nothing on file is open right now.
Within 300 m, 10 development applications are open (the tallest up to 40 storeys). Within 300 m, the Committee of Adjustment decided 59 minor variance applications in the last 10 years and approved 90%. Rosedale station is a 7-minute walk.
Summary
What the City's records show on this house
- Heritage property: in a Heritage Conservation District (Part V)Moderate
- Zoning not in By-law 569-2013Moderate
- 10 development applications open within 300 mLowFree check
- 2 Committee of Adjustment files on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- No open orders or by-law investigations
- No permits left open for years
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
2 Committee of Adjustment files on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
City files on this lot
8 records on file, more than at 98% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-04-29 | Minor varianceA0184/26TEY | To alter the existing three-storey building by constructing a rear third storey addition (converting the existing third floor balcony into habitable space), a complete fourth storey addition with a front balcony (above the third floor), and a rooftop mechanical unit with screening. The existing integral two-car garage will be maintained and unaltered. This building which used to contain commercial / live-work use will only contain residential use. | Approved | |
| 2025-01-27 | Zoning review25 109302 ZAP | No description on file | Closed | |
| 2013-01-24 | Building permit12 272643 | Revision to change the use from office to live/work space, add a stair for roof access and minor interior alterations. | Closed | |
| 2004-07-30 | Building permit04 157526 | To install sprinklers in basement and ground floors. | Closed - Dormant | |
| 2004-07-12 | Building permit02 141444 | Revision (alter plan) to the superstructure / foundation plan. construct new 3 storey office building. SURVEY APPROVED. ( See latest plans dated Sept. 05/ 03.) HOLD for field review forms. Additional hourly fee to charged, see folder. | Closed | |
| 2003-12-19 | Building permit03 202045 | To provide and install fire alarm system. | Cancelled | |
| 2002-02-12 | Zoning review02 110157 ZPR | No description on file | Closed | |
| 2001-04-24 | Minor varianceA0205/01TO | The applicant proposes to construct on the vacant lot, a four-storey office building comprised of a ground floor interior parking and lobby area with three floors above for office use. | Refused |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Heritage property: in a Heritage Conservation District (Part V)
- Zoning not in By-law 569-2013
What this part means for this house, in plain EnglishUnlock
Heritage property: in a Heritage Conservation District (Part V)
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Zoning not in By-law 569-2013
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto Heritage RegisterWhat this means: Toronto zoning by address
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- —
- Height limit
- —
- Corner lot
- No
- Public lane
- Ln W Davenport S New, 19.5 m along it
- House footprint
- 110 m²
- Back yard
- 0.7 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 10 development applications open within 300 m, up to 40 storeys
- 6 suite and multiplex permits within 300 m in 10 years
- 59 minor variance decisions within 300 m, 90% approved
What this part means for this house, in plain EnglishUnlock
10 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 3 of 8 categories
- Theft over $5,000: 2.5 times the Toronto median
- Break and enter: 2.2 times the Toronto median
- Assault: 1.7 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Annex neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Rosedale StationNearest station7 min walk
- Davenport Rd at New StNearest TTC stop1 min walk
- Davenport RdNearest cycling route1 min walk
- Jesse Ketchum Jr & Sr Public SchoolSchool3 min walk
- McDonald International Academy SchoolSchool6 min walk
- Career Quest - TorontoSchool7 min walk
- Rosedale Day SchoolSchool10 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.31080.9
- Robberycity median 69.580.5
- Homicidecity median 5.35.2
- Shootingscity median 10.55.2
- Auto theftcity median 192.6116.9
- Theft over $5,000city median 46.1114.3
- Break and entercity median 172.8387.1
- Theft from vehiclescity median 188.1220.9
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist