HousePrecheckCheck an address

3 Greentree CrtToronto · zoning, lot size and permit records

Residential multiple · RM (f12.0; u4; d0.8) (x252)≈ 71.2 × 44.5 m2,067 m²on Greentree Crt

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 3 storeys, 45 rental units, built 1960More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelStill open in the City's records: 13 108177 (Plumbing - Interior alteration: Proposal to convert existing storage area on basement f..., 2020, status Revocation Pending). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
  • City upkeep score: 85 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: KeelesdaleThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
≈ 71.2 m frontage≈ 44.5 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2020

    Needs a closer look

    Still open in the City's records: 13 108177 (Plumbing - Interior alteration: Proposal to convert existing storage area on basement f..., 2020, status Revocation Pending).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 6 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Property Standards): 26 259742 HEA 00 IR (Adequate Heat, 2026); 26 257089 HEA 00 IR (Adequate Heat, 2026); 26 220887 PRS 00 IR (Property Standards, 2026); and 3 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Rental building evaluation: 85 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (3 storeys, 45 units, built 1960).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

11 records on file: more than at 99% of Toronto houses (median 0).

  • By-law investigation26 259742 HEA 00 IRClosed

    Adequate Heat

    Oct 24, 2026 · 3 GREENTREE CRT
  • By-law investigation26 257089 HEA 00 IRClosed

    Adequate Heat

    Oct 19, 2026 · 3 GREENTREE CRT
  • By-law investigation26 220887 PRS 00 IRClosed

    Property Standards

    Aug 17, 2026 · 3 GREENTREE CRT
  • By-law investigation26 203403 LGW 00 IVClosed

    Notice Issued Long Grass

    Jun 24, 2026 · 3 GREENTREE CRT
  • By-law investigation26 190327 LGW 00 IRClosed

    Long Grass and Weeds

    Jun 24, 2026 · 3 GREENTREE CRT
  • By-law investigation26 173562 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 3 GREENTREE CRT
  • By-law investigation26 173561 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 3 GREENTREE CRT
  • By-law investigation25 122271 PRS 00 IRClosed

    Property Standards

    Feb 26, 2025 · 3 GREENTREE CRT
Show 3 older records
  • Building permit13 108177Revocation Pending

    Plumbing - Interior alteration: Proposal to convert existing storage area on basement floor into 2 new apartment units.

    Apr 29, 2020 · 3 GREENTREE CRT
  • Zoning review12 141353 ZPRClosed
    Mar 22, 2012 · 3 GREENTREE CRT
  • Building permit09 126652Closed

    Installation of one Backflow Prevention Device to Apartment Building.

    Apr 21, 2009 · 3 GREENTREE CRT

Check before you build

  • Site-specific exception 900.6.10(252)

    Needs a closer look

    1 site-specific rule applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.6.10(252)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The minimum lot frontage is 8.0 metres for a detached house .

3 parts for other addresses
  • A On the lands municipally known in the year 2009 as 1500 Weston Road, City of Toronto By-law 1268-2009(OMB)
  • B On the lands municipally known as 601, 603 and 605 Oakwood Avenue, City of Toronto By-law 593-2008.
  • C On 441 Jane Street, City of Toronto by-law 106-2015.
By-law 569-2013, Chapter 900

Lot facts

Area
2,067 m²
Frontage
71.2 mestimated, irregular lot
Depth
44.5 mestimated, irregular lot
Street
Greentree Crt
Corner lot
No
Public lane
None
House footprint
739 m²roof up to 16.6 m
Back yard
4.6 mhouse to rear lot line
Side yards
7.1 m and 17.2 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
11 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Keelesdale. The lot is inside the Keelesdale Major Transit Station Area approved by the Province (Site and Area Specific Policy 673). Source
  • Minimum frontage 12 m. Frontage is about 71.2 m (estimated, irregular lot): meets the zone minimum. Source
  • Zone RM (f12.0; u4; d0.8) (x252) (Residential Multiple Dwelling). Chapter 10, section 10.80 of the by-law. Source
  • 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: elm, siberian (67 cm), elm, siberian (54 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%5 of 5 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
3
Development applications
0

Within 300 m, last 10 years. 3 suite and multiplex permits: no more than at most Toronto houses (median 3). 5 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new semi-detached apartment building containing 5 dwelling units.

    49 TRETHEWEY DR · Oct 22, 2026 · 87 m away
  • Minor varianceApproved

    To construct a new semi-detached apartment building containing 5 dwelling units.

    49 TRETHEWEY DR · Oct 22, 2026 · 87 m away
  • Minor varianceApproved

    To construct a new apartment building containing 6 dwelling units.

    2095 KEELE ST · Sep 10, 2026 · 379 m away
  • Minor varianceRefused

    To construct a new semi-detached fourplex with a garden suite in the rear yard.

    9 HERTFORD AVE · Apr 23, 2026 · 433 m away
  • Minor varianceRefused

    To construct a new semi-detached fourplex with a garden suite in the rear yard.

    9 HERTFORD AVE · Apr 23, 2026 · 433 m away

Latest activity nearby

  • Consent (lot split)Approved

    To obtain consent to sever the lot into two undersized lots and to construct a new 5-unit semi-detached apartment building on each lot.

    49 TRETHEWEY DR · Oct 22, 2026 · 87 m away
  • Minor varianceApproved

    To construct a new semi-detached apartment building containing 5 dwelling units.

    49 TRETHEWEY DR · Oct 22, 2026 · 87 m away
  • Minor varianceApproved

    To construct a new semi-detached apartment building containing 5 dwelling units.

    49 TRETHEWEY DR · Oct 22, 2026 · 87 m away
  • Building permit

    Proposal for the replacement of six air handling units and two makeup air units with new rooftop heat pump units at York Civic Centre, including associated ductwork, gas piping, condensate drainage, and BAS controls

    2700 EGLINTON AVE W · Oct 15, 2026 · 282 m away
  • Building permitdemolition, multiplex

    PROPOSAL TO DEMOLISH EXISTING DWELLING AND CONSTRUCT A NEW SEMI-DETACHED FOURPLEX DWELLING (BUILDING A & B)

    1876 A KEELE ST · Jul 6, 2026 · 300 m away
  • Building permitmultiplex, new building, new house

    Proposed new Fourplex

    1876 A KEELE ST · Jul 6, 2026 · 300 m away
  • Building permit

    Proposal for site servicing plan was revised to include removal and replacement of problematic areas to avoid future drainage issues.

    2690 EGLINTON AVE W · Jun 30, 2026 · 295 m away
  • Building permitmultiplex, new building, new house

    Proposed new Fourplex.

    1876 B KEELE ST · Jun 30, 2026 · 299 m away
  • Zoning review

    Closed

    2690 EGLINTON AVE W · Jun 25, 2026 · 295 m away
  • Building permit

    4 first party overhanging structure signs displaying static copy and are illuminated. The signs are located on each of the four elevations of a canopy, at the first storey with the following dimensions:***ESSO***Sign 1: ( reface of panels) 0.91m L x 12.51m W x 0.07m D x 5.333m H above Grade, Sign Face area of 11.38 square metres, North elevation Sign 2: (reface of panels) 0.91m L x 12.50m W x 0.07m D x 5.33m H above Grade, Sign Face area of 11.38 square metres, South Elevation Sign 3: 0.91m L x 2.540m W x 0.07m D x 5.33m H above Grade, Sign Face area of 2.31 square metres, East Elevation ( panel has a total width of 14.98m)Sign 4: 0.91m L x 2.540m W x 0.07m D x 5.33m H above Grade., Sign Face area of 2.31 square metres, West Elevation (panel has a total width of 14.98m)

    66 TRETHEWEY DR · Jun 16, 2026 · 115 m away

Neighbourhood: Beechborough-Greenbrook

About the area around the lot, not the lot itself.

Nearest station
Keelesdale Station6 min walk
Nearest TTC stop
Trethewey Dr at Greentree Crt1 min walk
Nearest cycling route
Eglinton Ave WBike Lane, 5 min walk
Nearest traffic count
6,848 vehicles in 8 hIrving Rd / Yorktown Dr / Trethewey Dr, 90 m away, Feb 28, 2023
Serious collisions within 500 m
132021–2026, killed or seriously injured: 2 fatal, 3 with pedestrians, 1 with cyclists
Parks
Coronation Park - York1 min walk
Green Hills Park4 min walk
North Keelesdale Park5 min walk

Schools within 1 km

  • CHARLES E WEBSTER JR PUBLIC SCHOOL English Public 5 min walk
  • YORK MEMORIAL COLLEGIATE INSTITUTE (UNDER CONSTRUCTION) English Public 5 min walk
  • IMMACULATE CONCEPTION CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk
  • KEELESDALE JR PUBLIC SCHOOL English Public 10 min walk
  • SILVERTHORN COMMUNITY SCHOOL English Public 15 min walk
  • YORK MEMORIAL COLLEGIATE INSTITUTE English Public 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureBeechborough-GreenbrookMedian neighbourhood
Median household income (2020)$62,400$84,500
Households that own their home34%54%
Population (2021)6,26016,813
Homes built in 1960 or before42%29%
Homes needing major repairs12%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleBeechborough-GreenbrookCity median
Assault692.3636.3
Robbery148.369.5
Shootings12.410.5
Auto theft247.2192.6
Theft over $5,00037.146.1
Break and enter111.3172.8
Theft from vehicles148.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.