Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
1 open order or by-law investigation
Needs a closer lookNot resolved in the City's records: 26 135067 SNP 00 VI (Sign No Permit: Sign too bright from a large Ground Sign with name 'Roger's Centre' NOV..., 2026, status Notice Issued).
What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.
How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigationsWork or applications in progress
Good to knowRecent records on this lot: 24 252346 (1 ground sign**ROGERS CENTRE**, 2025).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications1 development application open within 300 m
Good to know1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
2 records on file: more than at 72% of Toronto houses (median 0).
- Building order26 135067 SNP 00 VINotice Issued
Sign No Permit: Sign too bright from a large Ground Sign with name 'Roger's Centre' NOV issued for 3rd party copy in lieu of 1st party copy being displayed. [This Complaint was initially taken in under the incorrect address of 1 Blue Jays Way and folder # 25 248468 00
Mar 26, 2026 · 299 BREMNER BLVD - Building permit24 252346Permit Issued
1 ground sign**ROGERS CENTRE**
Jan 16, 2025 · 299 BREMNER BLVD
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 4,601 m²
- Frontage
- 60.5 mestimated, irregular lot
- Depth
- 107.2 mestimated, irregular lot
- Street
- Van De Water Cres
- Corner lot
- Yes, also on Bremner Blvd107.2 m along it
- Public lane
- None
- House footprint
- 595 m²
- Back yard
- 27.9 mhouse to rear lot line
- Side yards
- 0 m and 52.7 mhouse to side lot lines; 0 is a shared wall
- Buildings on the lot
- 2house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- 15 City trees in front of this lot. The City's street tree inventory lists 15 trees at this address: oak, red (28 cm), honey locust ruby lace (20 cm), honey locust (16 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 100%4 of 4 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 3
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 4 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 493-2024) for the 21-storey mixed-use building (located at the northwest corner of the lot, municipally known as 396 Queens Quay West) by increasing the height of the mechanical penthouse, reducing the width of 32 parking spaces, and reducing the indoor amenity space (which will be used for storage space for outdoor furniture).
350 QUEENS QUAY W · Jun 17, 2026 · 211 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1012-2022), for a new 59-storey mixed-use building (with four levels of below-grade parking, and a total of 974 dwelling units, of which 78 units are affordable rental units), by reducing the minimum number of residential visitor parking spaces and long-term bicycle parking spaces.
200 QUEENS QUAY W · Nov 12, 2025 · 500 m away - Minor varianceApproved
To convert the existing commercial space (located on the first floor lobby, and second levels of the building, municipally known as 350 Queens Quay West) into a hotel use, and to expand the permitted hotel use areas (on the second level of the building, municipally known as 390 Queens Quay West). Also, to alter the existing building municipally known as 396 Queens Quay West, by constructing a seventh level shaft on the roof area.
350 QUEENS QUAY W · Apr 9, 2025 · 211 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1012-2022), for a new 59-storey mixed-use building, by reducing the minimum number of residential dwelling units that shall contain two or more bedrooms.
200 QUEENS QUAY W · Dec 6, 2023 · 500 m away - Minor varianceApproved
To permit the increase of gaming machines within the existing entertainment complex building (The Rec Room).
255 BREMNER BLVD · Nov 22, 2023 · 256 m away
Latest activity nearby
- Building permit
Proposal for interior alterations to Cafe Bar Lobby, proposed hotel entrance awnings & refinishing existing cladding.
249 QUEENS QUAY W · Nov 17, 2026 · 261 m away - Building permit
Rev 01 - Renovation of existing club/suite spaces at level 400 - Phase 5Proposed renovation of existing club/suite spaces at level 400.
1 BLUE JAYS WAY · Nov 12, 2026 · 233 m away - Building permit
Proposal to construct a new storage room within the P1 level garage area
5 MARINER TER · Nov 10, 2026 · 207 m away - Building permit
REV 01: Revision to permit to update exit stair configurationProposal for removal of three later exterior walls and installation of new curtain wall systems to match and align with adjacent existing curtain wall assemblies.
255 BREMNER BLVD · Nov 2, 2026 · 256 m away - Building permit
Replacement of existing FCU risers' expansion compensators, anchors, and guides. Total of 13 riser sets (supply and return) from the ground floor up to the 41st floor (37th level)
5 MARINER TER · Oct 22, 2026 · 207 m away - Building permit
REV01: Revisions to the washroom layout and mechanical drawings, including updated HRV location.Conversion of an existing empty shell into a daycare facility
350 QUEENS QUAY W · Oct 5, 2026 · 211 m away - Building permit
1 Wall Sign****RABBA FINE FOODS****
250 A QUEENS QUAY W · Sep 11, 2026 · 250 m away - Building permit
Installation and removal of temporary stage, platforms, ramps and associated event structures for the concert at Rogers Center
1 BLUE JAYS WAY · Aug 27, 2026 · 233 m away - Building permit
Temporary installation of a G2 concert stage, including trusses, rigging, and associated event support structures within Rogers Centre for the Zach Bryan concert. All temporary structures will be dismantled and removed following the event, with no permanent alterations to the existing building. Build date: Sept 17, 2026; Dismantle date: Sept 20, 2026
1 BLUE JAYS WAY · Aug 20, 2026 · 233 m away - Building permit
Temporary installation of concert stage, truss, rigging and related event structures. Structural review of the stage engineer, ground pressures and existing floor to verify capacity for temporary event loads. All temporary structures will be removed following the event, with no permanent modifications to the building. Build date: August 17, 2026; Dismantle date: August 24, 2026
1 BLUE JAYS WAY · Aug 19, 2026 · 233 m away
Neighbourhood: Harbourfront-CityPlace
About the area around the lot, not the lot itself.
- Nearest station
- St. Andrew Station13 min walk
- Nearest TTC stop
- Queens Quay West at Rees St West Side3 min walk
- Nearest cycling route
- Waterfront TrlMulti-Use Trail - Boulevard, 2 min walk
- Nearest traffic count
- 7,504 vehicles in 8 hBremner Blvd / Rees St, 60 m away, May 20, 2014
- Serious collisions within 500 m
- 72021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 2 with cyclists
- Parks
- Roundhouse Park1 min walk
- Southern Linear Park1 min walk
- Bobbie Rosenfeld Park1 min walk
Schools within 1 km
- JEAN LUMB PUBLIC SCHOOL English Public 9 min walk
- BISHOP MACDONELL CATHOLIC ELEMENTARY English Separate 9 min walk
- CITY SCHOOL English Public 14 min walk
- THE WATERFRONT SCHOOL English Public 15 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Harbourfront-CityPlace | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $90,000 | $84,500 |
| Households that own their home | 40% | 54% |
| Population (2021) | 28,135 | 16,813 |
| Homes built in 1960 or before | 0% | 29% |
| Homes needing major repairs | 2% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Harbourfront-CityPlace | City median |
|---|---|---|
| Assault | 883.3 | 636.3 |
| Robbery | 48.1 | 69.5 |
| Homicide | 2.8 | 5.3 |
| Shootings | 8.5 | 10.5 |
| Auto theft | 56.6 | 192.6 |
| Theft over $5,000 | 56.6 | 46.1 |
| Break and enter | 141.6 | 172.8 |
| Theft from vehicles | 121.7 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.