Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Heritage property: designated (Part IV)
Needs a closer lookOn the City's Heritage Register. Demolition and exterior changes need heritage review.
What it means. Renovations, additions and demolition can take longer, cost more or be refused.
How to confirm. Heritage Planning at the City confirms the status and what it covers. Details
City of Toronto Heritage Register1 Committee of Adjustment file on this lot
Good to know1 approved. A0581/03TEY (This application also includes 25 Gould Street. The applicant, Ryerson University, is p..., 2003).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)19 development applications open within 300 m
Good to know19 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 85 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
18 records on file: more than at 100% of Toronto houses (median 0).
- Building permit24 224690Cancelled
REV01: Proposed revision - Alteration of ground floor existing computer lounge and student center into work area and event/workshop space for Yellowhead CEDPlumbing - Proposal for alteration of ground floor existing computer lounge and student center into work area and event/workshop space for Yellowhead CED, and addition of new universal washroom.
Apr 7, 2025 · 297 VICTORIA ST - Building permit24 216762Closed
Proposal for interior alterations to room ced 303/304/306 - new walls and finishes - light grid for media lab
Oct 22, 2024 · 297 VICTORIA ST - Building permit23 189794Closed
Erect Temporary mobile SL100 stage for TMU Orientation week events inside the TMU Community Park from August 27 - August 30th, 2023. - Toronto Metropolitan University Park
Nov 3, 2023 · 25 GOULD ST - Development application22 242103 STE 13 OZClosed
This is an application that is to address two main objectives: 1) to bring the portion of the university's lands currently zoned under the former City of Toronto Zoning By-law 438-86 into the City-wide Zoning By-law 569-2013; and 2) to establish bicycle parking, loading space, and automobile parking rates for lands owned and operated by Toronto Metropolitan University as an overlay approach in By-law 569-2013. No development is proposed as part of this application.
Dec 23, 2022 · 297 VICTORIA ST · City file - Building permit19 157195Closed
Proposal for interior alterations for a new ground floor vestibule and reconstruct the exterior central stairs of existing university building - Ryerson University - Chang School of Continuing Education
Jun 27, 2019 · 297 VICTORIA ST - Building permit16 226772Closed
Proposal to erect a temporary certified tent - 30' X 60' (#15-120131) from Sep 30 to Oct 1/2016
Sep 26, 2016 · 25 GOULD ST - Building permit15 114170Cancelled
Revision to fail safe electic strike tied to fire alarm system - Proposal for interior alterations to existing office space on the 6th floor - Ryerson University - Chang School of Continuing Education
Jun 15, 2015 · 297 VICTORIA ST - Building permit12 255021Closed
proposal to install 2 back flow prevention devices.
Oct 5, 2012 · 297 VICTORIA ST
Show 10 older records
- Building permit04 198991Closed
Install new sprinkler system in connection with BP # 04-115650. new university bldg.
Dec 16, 2004 · 297 VICTORIA ST - Building permit04 115650Closed
Construction of new 7 storey office building for Ryerson University - Continuing Education Building.
Nov 23, 2004 · 297 VICTORIA ST - Building permit04 165686Closed
Partial foundation permit for new continuing education building
Aug 18, 2004 · 297 VICTORIA ST - Building permit04 165684CancelledAug 12, 2004 · 297 VICTORIA ST
- Building permit04 165680Cancelled
Partial foundation permit to new continuing education building
Aug 12, 2004 · 297 VICTORIA ST - Building permit03 175717Closed
Demolish existing (continuing eduction building); front facade to remain standing(see heritage documents); also build steel bracing to hold up front facade.
Feb 11, 2004 · 297 VICTORIA ST - Minor varianceA0581/03TEYApproved
This application also includes 25 Gould Street. The applicant, Ryerson University, is proposing to replace the existing building at No. 297 Victoria Street (while retaining its existing west facade) with a seven-storey university building (a portion of floors two to seven of which will overhang onto the property identified as No. 25 Gould Street). The building will have dimensions of approximately 37.9 by 19.78 metres and a height of 30.0 metres.
Nov 5, 2003 · 297 VICTORIA ST - Zoning review03 180278 PSPClosedSep 30, 2003 · 297 VICTORIA ST
- Zoning review03 114071 ZPRClosedMar 11, 2003 · 297 VICTORIA ST
- Zoning review01 152535 000ClosedJun 27, 2001 · 297 VICTORIA ST
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 1,879 m²
- Frontage
- 70 mestimated, irregular lot
- Depth
- 41.4 mestimated, irregular lot
- Street
- Victoria St
- Corner lot
- No
- Public lane
- Victoria Street Lane, 6.1 m along it
- House footprint
- 386 m²
- Back yard
- 17.6 mhouse to rear lot line
- Side yards
- 2 m and 32.1 mhouse to side lot lines
- Buildings on the lot
- 8house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
Around this lot
- Minor variances approved
- 94%15 of 16 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 35
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 16 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To permit a new eating establishment with karaoke rooms on the second storey (with an increased total floor area), and an eating establishment on the ground floor with washrooms and storage located in the basement, within the existing two-storey commercial building.
332 YONGE ST · Oct 14, 2026 · 168 m away - Minor varianceApproved
To alter the existing public hospital (St. Michael's Hospital, bounded by Shuter Street, Bond Street, Queen Street East, and Victoria Street) by installing an air handling unit (AHU) on a portion of the roof (Donnelly Wing).
30 BOND ST · Jan 21, 2026 · 439 m away - Minor varianceApproved
To alter the existing three-storey townhouse dwelling by constructing interior alterations to the existing open-to-above area between the basement and ground floor level of the dwelling by enclosing the floor (increasing the area of habitable space).
97 GRANBY ST · Oct 15, 2025 · 445 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.
53 A MUTUAL ST · Oct 1, 2025 · 437 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey attached building by increasing the non-residential floor space index.
53 MUTUAL ST · Oct 1, 2025 · 447 m away
Latest activity nearby
- Consent (lot split)Pending
To obtain consent to sever a portion of stratified land (air-rights at-and-above an elevation of 121 m) for the purpose of a lot addition.
50 GERRARD ST E · Nov 25, 2026 · 288 m away - Zoning review
Closed
335 YONGE ST · Nov 23, 2026 · 105 m away - Zoning review
Closed
66 GERRARD ST E · Nov 9, 2026 · 299 m away - Zoning review
Not Started
21 DUNDAS SQ · Nov 6, 2026 · 169 m away - Building permit
Proposal to install and update the existing sprinkler system in the washrooms on the 23rd floor.
1 DUNDAS ST W · Nov 5, 2026 · 220 m away - Building permit
Proposal for interior alterations, fit out for new eating establishment with karaoke rooms on the 2nd floor.
332 YONGE ST · Nov 5, 2026 · 168 m away - Zoning review
Not Started
66 GERRARD ST E · Nov 4, 2026 · 299 m away - Zoning review
Closed
1 DUNDAS ST E · Oct 26, 2026 · 141 m away - Building permit
FS - Sprinkler Shop Drawing - Interior alterations - new office suite fit-out (tenant Improvements)
20 DUNDAS ST W · Oct 23, 2026 · 190 m away - Building permit
FS - Sprinkler Shop Drawing - Proposal for interior alterations for existing vacant space for new office - ESDC SERVICE CANADA CENTRE
28 EDWARD ST · Oct 20, 2026 · 234 m away
Neighbourhood: Downtown Yonge East
About the area around the lot, not the lot itself.
- Nearest station
- TMU Station2 min walk
- Nearest TTC stop
- TMU Station - Northbound Platform2 min walk
- Nearest cycling route
- Gerrard St ECycle Track, 4 min walk
- Nearest traffic count
- 2,267 vehicles in 8 hGould St / Bond St, 90 m away, Oct 9, 2003
- Serious collisions within 500 m
- 132021–2026, killed or seriously injured: 1 fatal, 9 with pedestrians, 4 with cyclists
- Parks
- Toronto Metropolitan University Square1 min walk
- Trinity Square5 min walk
- Arena Gardens5 min walk
Schools within 1 km
- TMU - HEASLIP HOUSE University 1 min walk
- TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF IMAGE ARTS University 1 min walk
- TMU - HEIDELBERG CENTRE SCHOOL OF GRAPHIC COMM'NS MGMT University 2 min walk
- TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 2 min walk
- ST MICHAEL'S CHOIR SCHOOL - SECONDARY English Separate 4 min walk
- ST MICHAEL'S CHOIR SCHOOL - ELEMENTARY English Separate 4 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Downtown Yonge East | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $69,500 | $84,500 |
| Households that own their home | 36% | 54% |
| Population (2021) | 17,700 | 16,813 |
| Homes built in 1960 or before | 7% | 29% |
| Homes needing major repairs | 4% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Downtown Yonge East | City median |
|---|---|---|
| Assault | 2360.8 | 636.3 |
| Robbery | 143.3 | 69.5 |
| Shootings | 11.9 | 10.5 |
| Auto theft | 75.6 | 192.6 |
| Theft over $5,000 | 99.5 | 46.1 |
| Break and enter | 274.7 | 172.8 |
| Theft from vehicles | 390.1 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.