HousePrecheckCheck an address

2964 Islington AveToronto · zoning, lot size and permit records

Commercial residential · CR 1.0 (c0.5; r0.7) SS2 (x233)≈ 27.1 × 49.6 m1,134 m²on Islington Ave

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.1 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
≈ 27.1 m frontage≈ 49.6 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A191/06EYK (To construct a 12-unit, stacked townhouse development on the vacant land, 2006).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

9 records on file: more than at 99% of Toronto houses (median 0).

  • By-law investigation26 120245 WST 00 IRClosed

    Waste

    Feb 23, 2026 · 2964 ISLINGTON AVE
  • Zoning review08 167546 PLOClosed
    Jun 9, 2008 · 2964 ISLINGTON AVE
  • Zoning review08 166256 000Cancelled
    Jun 5, 2008 · 2964 ISLINGTON AVE
  • Building permit07 222680Closed

    Site services for a 12-unit, stacked condominium townhouse development on the vacant land.

    Oct 2, 2007 · 2964 ISLINGTON AVE
  • Building permit07 222637Closednew building, new house

    To construct a 12-unit, stacked condominium townhouse development on the vacant land.

    Oct 1, 2007 · 2964 ISLINGTON AVE
  • Zoning review06 186220 PSPClosed
    Oct 24, 2006 · 2964 ISLINGTON AVE
  • Zoning review06 157479 PSPClosed
    Jul 18, 2006 · 2964 ISLINGTON AVE
  • Minor varianceA191/06EYKApproved

    To construct a 12-unit, stacked townhouse development on the vacant land.

    May 4, 2006 · 2964 ISLINGTON AVE
Show 1 older records
  • Zoning review06 110992 ZALClosed
    Feb 20, 2006 · 2964 ISLINGTON AVE

Check before you build

  • Site-specific exception 900.11.10(233)

    Needs a closer look

    1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(233)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    Despite the uses listed in Article 40.10.20, the following uses are not permitted: vehicle fuel station , vehicle service shop , vehicle washing establishment , and vehicle dealership . Prevailing By-laws and Prevailing Sections: (A) Former City of North York by-law 30867.

  2. Older by-law A

    Despite the uses listed in Article 40.10.20, the following uses are not permitted: vehicle fuel station , vehicle service shop , vehicle washing establishment , and vehicle dealership . Prevailing By-laws and Prevailing Sections: (A) Former City of North York by-law 30867.

By-law 569-2013, Chapter 900

Lot facts

Area
1,134 m²
Frontage
27.1 mestimated, irregular lot
Depth
49.6 mestimated, irregular lot
Street
Islington Ave
Corner lot
No
Public lane
None
Max height
10.5 m
Max lot coverage
33%
  • Site and Area Specific Policy 091. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Zone CR 1.0 (c0.5; r0.7) SS2 (x233) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
  • 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: honey locust (13 cm), honey locust (12 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%6 of 6 decisions
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
4
Development applications
0

Within 300 m, last 10 years. 5 suite and multiplex permits: more than at 59% of Toronto houses (median 3). 6 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To replace the existing canopy with a larger canopy.

    2922 ISLINGTON AVE · Jul 14, 2022 · 215 m away
  • Minor varianceApproved

    To legalize and to maintain the existing one-storey rear and north side addition.

    2958-2962 ISLINGTON AVE · Mar 23, 2021 · 38 m away
  • Minor varianceApproved

    To permit a Dental Office within the existing building.

    3005 ISLINGTON AVE · Oct 12, 2017 · 212 m away
  • Minor varianceApproved

    To maintain the existing restaurant on the ground floor and the dwelling unit on the second floor of the existing building. A previous Committee of Adjustment application (A623/11EYK) approved the existing restaurant and dwelling unit for a period of 5 years which expired December 8, 2016.

    187 MILLWICK DR · Mar 23, 2017 · 277 m away

Latest activity nearby

  • Zoning review

    Closed

    18-20 SATTERLY RD · Oct 15, 2026 · 146 m away
  • Building permitgarden suite

    Proposed 2 storey Garden Suite

    38 LARCHMERE AVE · Sep 24, 2026 · 215 m away
  • Building permit

    Fire Damage - Restore the building to its pre-loss condition. Work includes replacing damaged roof structural members within the lower attic with engineered trusses, replacing damaged wall studs, gable wall framing, header beams, and top plates, and restoring all affected structural elements. Damaged doors and windows will be removed and replaced with comparable units. Additionally, all damaged interior finishes, including wall, ceiling, and floor materials, will be fully removed and replaced to match existing conditions and finishes present before the loss.

    78 SEACLIFF BLVD · Sep 8, 2026 · 161 m away
  • Zoning review

    Closed

    3005 ISLINGTON AVE · Aug 20, 2026 · 212 m away
  • Building permit

    SUPPLY AND INSTALL INTERNAL BACKWATER VALVE ON SANITARY

    9 LARCHMERE AVE · Aug 6, 2026 · 232 m away
  • Zoning review

    Closed

    2965 ISLINGTON AVE · Jun 12, 2026 · 92 m away
  • Building permitmultiplex

    Proposal for interior alterations, enlarge 1 window opening and add 2 units in the basement to convert to triplex.

    9 LARCHMERE AVE · Jun 2, 2026 · 232 m away
  • Building permit

    Plumbing - Proposal for minor interior alterations and plumbing work to Barber Shop

    6-8 SATTERLY RD · May 27, 2026 · 155 m away
  • Building permit

    Proposed addition of two 1-storey rooms to 2.5 storey building.

    2958-2962 ISLINGTON AVE · May 25, 2026 · 38 m away
  • Zoning review

    Closed

    2993 ISLINGTON AVE · Apr 16, 2026 · 184 m away

Neighbourhood: Humber Summit

About the area around the lot, not the lot itself.

Nearest station
Rowntree Mills Station21 min walk
Nearest TTC stop
Islington Ave at Vanhill Ave1 min walk
Nearest cycling route
Humber River Recreational TrlMulti-Use Trail, 13 min walk
Nearest traffic count
11,973 vehicles in 8 hIslington Ave / Satterly Rd, 110 m away, Apr 29, 2014
Serious collisions within 500 m
22021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
Parks
Whitfield Parkette2 min walk
Rowntree Mills Park7 min walk
Apted Park8 min walk

Schools within 1 km

  • ST ROCH CATHOLIC ELEMENTARY SCHOOL English Separate 9 min walk
  • VENERABLE JOHN MERLINI CATHOLIC ELEMENTARY SCHOOL English Separate 12 min walk
  • GRACEDALE PUBLIC SCHOOL English Public 14 min walk
  • HUMBER SUMMIT MDL SCHOOL English Public 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureHumber SummitMedian neighbourhood
Median household income (2020)$80,000$84,500
Households that own their home72%54%
Population (2021)12,18516,813
Homes built in 1960 or before16%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleHumber SummitCity median
Assault1031.8636.3
Robbery191.169.5
Shootings30.610.5
Auto theft672.6192.6
Theft over $5,000191.146.1
Break and enter397.4172.8
Theft from vehicles282.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.