HousePrecheckCheck an address

2961 Dufferin StToronto · zoning, lot size and permit records

Residential apartment · RA (f30.0; a1375; d1.5) (x776)≈ 69.4 × 82.8 m3,763 m²on Glenbrook Avecorner, also on Dufferin St

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.4 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 05 164036 (Repair of 64 balconies plus parking garage roof slab repair, 2005, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 2 development applications open within 300 m, up to 33 storeysNew buildings may go up around here in the next years. More change nearby than at 88% of Toronto houses.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
≈ 69.4 m frontage≈ 82.8 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2005

    Needs a closer look

    Still open in the City's records: 05 164036 (Repair of 64 balconies plus parking garage roof slab repair, 2005, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 33 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • Building permit20 193498Closed

    Proposal to install elevator lobby smoke detectors for elevator recall modernization and fire panel replacement

    Sep 16, 2020 · 2961 DUFFERIN ST
  • Building permit20 129306Closed

    Proposal for interior alterations to unit 803 of existing apartment building.

    May 4, 2020 · 2961 DUFFERIN ST
  • Building permit16 129463Cancelled

    Construct a new partial block wall (foundation) inside the perimeter of the below grade parking garage foundation

    Mar 18, 2016 · 2961 DUFFERIN ST
  • Building permit12 256841Closed

    installation of 2" backflow preventor

    Nov 2, 2012 · 2961 DUFFERIN ST
  • Building permit05 164036Inspection

    Repair of 64 balconies plus parking garage roof slab repair.

    Aug 30, 2005 · 2961 DUFFERIN ST
  • Building permit98 251459Closed - Dormant

    FIRE ALARM

    Apr 29, 1999 · 2961 DUFFERIN ST
  • Building permit95 089354Closed

    RETROFIT FIRE ALARM

    Oct 3, 1995 · 2961 DUFFERIN ST

Check before you build

  • Site-specific exception 900.7.10(776)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.7.10(776)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Schedule 'D' Airport Hazard Map from City of North York zoning by-law 7625.

By-law 569-2013, Chapter 900

Lot facts

Area
3,763 m²
Frontage
69.4 mestimated, irregular lot
Depth
82.8 mestimated, irregular lot
Street
Glenbrook Ave
Corner lot
Yes, also on Dufferin St82.8 m along it
Public lane
None
Max height
—
Max lot coverage
35%
  • Minimum frontage 30 m. Frontage is about 69.4 m (estimated, irregular lot): meets the zone minimum. Source
  • Minimum lot area 1375 m². Lot area is 3,763 m²: meets the minimum. Source
  • Zone RA (f30.0; a1375; d1.5) (x776) (Residential Apartment). Chapter 15, section 15.10 of the by-law. Source
  • 6 City trees in front of this lot. The City's street tree inventory lists 6 trees at this address: maple, amur (14 cm), maple, amur (11 cm), maple, amur (10 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%11 of 11 decisions
Garden suite permits
2
Laneway suite permits
0
Multiplex permits
10
Development applications
6

Within 300 m, last 10 years. 12 suite and multiplex permits: more than at 78% of Toronto houses (median 3). 11 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    Proposal to request relief from the zoning by-law to reduce the parking space requirements.

    3000 DUFFERIN ST · Oct 26, 2023 · 165 m away

Latest activity nearby

  • Building permitgarden suite, multiplex

    Rev 01 - Sprinklers removed under registered LDA; south elevation and main floor revised.Proposed new garden suite ancillary to fourplex. Vacant parcel resulting from severance.

    372 GLEN PARK AVE · Nov 5, 2026 · 254 m away
  • Building permitgarden suite, multiplex

    Revision to sprinklers removed under registered LDA, south elevation and main floor revised.Proposed new garden suite ancillary to Fourplex - Part 1

    372 GLEN PARK AVE · Nov 4, 2026 · 254 m away
  • Building permitmultiplex

    Revision No.1: TO CHANGE THE BASEMENT TO BECOME TWO APARTMENTS AND A MECHANICAL SPACE ACCESSED BY THE OWNERS.Proposal for interior alterations to basement , ground floor and second floor including basement walkout, underpinning, window wells and window replacement

    24 GLEN LONG AVE · Oct 23, 2026 · 188 m away
  • Building permitmultiplex, new building, new house

    Revision 01 - Page D1.03 Structural SupportProposal for new 4-plex (Part 1)

    372 GLEN PARK AVE · Oct 23, 2026 · 254 m away
  • Building permitmultiplex, new building, new house

    Revision 01 - Page D1.03 structural supportProposed new Fourplex (Part 2) Vacant parcel resulting from severance.

    372 GLEN PARK AVE · Oct 1, 2026 · 254 m away
  • Building permit

    Remove and replace the existing outdoor concrete swimming pool, repair existing pool deck. The existing pool was damaged by a water line break, (subsequently repaired) and this permit application is to rebuild the existing pool to the same size, adding a ramp for accessibility.

    35 GLEN LONG AVE · Aug 25, 2026 · 266 m away
  • Building permitdemolition, multiplex

    New 4-plex (Part 1)

    372 GLEN PARK AVE · Jun 15, 2026 · 254 m away
  • Building permit

    Proposal for interior alterations to basement , ground floor and second floor including basement walkout, window wells and window replacement

    24 GLEN LONG AVE · Jun 12, 2026 · 188 m away
  • Zoning review

    Closed

    2892 DUFFERIN ST · Jun 11, 2026 · 279 m away
  • Zoning review

    Closed

    2920 DUFFERIN ST · Jun 1, 2026 · 189 m away

Neighbourhood: Yorkdale-Glen Park

About the area around the lot, not the lot itself.

Nearest station
Lawrence West Station16 min walk
Nearest TTC stop
Dufferin St at Wenderly Dr1 min walk
Nearest cycling route
Marlee AveBike Lane, 11 min walk
Nearest traffic count
16,376 vehicles in 8 hDufferin St / Glen Long Ave, 60 m away, Sep 12, 2017
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
Parks
Glen Long Park3 min walk
Hillmount Parkette7 min walk
Wenderly Park8 min walk

Schools within 1 km

  • FIELDSTONE DAY SCHOOL Private 3 min walk
  • FIELDSTONE KING'S COLLEGE SECONDARY SCHOOL Private 3 min walk
  • ST CHARLES CATHOLIC ELEMENTARY SCHOOL English Separate 6 min walk
  • DANTE ALIGHIERI ACADEMY - CLOSED TIL 2026 English Separate 7 min walk
  • LEONARDO DA VINCI ACADEMY Private 7 min walk
  • REGINA MUNDI CATHOLIC ELEMENTARY SCHOOL English Separate 8 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureYorkdale-Glen ParkMedian neighbourhood
Median household income (2020)$79,000$84,500
Households that own their home54%54%
Population (2021)16,62516,813
Homes built in 1960 or before27%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleYorkdale-Glen ParkCity median
Assault1212.6636.3
Robbery146.869.5
Homicide4.75.3
Shootings28.410.5
Auto theft492.6192.6
Theft over $5,000274.746.1
Break and enter341.1172.8
Theft from vehicles360188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.