Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Heritage property: in a Heritage Conservation District (Part V)
Needs a closer lookOn the City's Heritage Register. Demolition and exterior changes need heritage review.
What it means. Renovations, additions and demolition can take longer, cost more or be refused.
How to confirm. Heritage Planning at the City confirms the status and what it covers. Details
City of Toronto Heritage Register5 development applications open within 300 m
Good to know5 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 26 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
7 records on file: more than at 97% of Toronto houses (median 0).
- Zoning review25 135437 LTOClosedMar 26, 2025 · 416 PARLIAMENT ST
- Building permit17 258722Closed
Backflow prevention device installation.
Dec 5, 2017 · 296 GERRARD ST E - Zoning review16 197325 LTOClosedJul 27, 2016 · 416 PARLIAMENT ST
- Building permit13 231706Closed
Proposal to remove a partition wall in an existing ground floor restaurant, less than 30 seats.
Oct 18, 2013 · 296 GERRARD ST E - Zoning review13 247146 LPRClosedOct 7, 2013 · 296 GERRARD ST E
- Zoning review03 169960 LTOClosedAug 27, 2003 · 296 GERRARD ST E
- Zoning review89 030245 LTOClosedJul 28, 1989 · 296 GERRARD ST E
Check before you build
Site-specific exception 900.11.10(1911)
Needs a closer look3 site-specific rules and 3 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
Public parking in a building or structure is not permitted; [TO: 438-86; 12(2) 132]
- Rule B
On a lot , a building or structure that has assisted housing has a parking rate of 0.3 spaces per dwelling unit [TO: 438-86; 12(2) 207]
- Rule C
These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(1) 66 of former City of Toronto By-law 438-86; (B) Section 12(2) 270 (a) of former City of Toronto By-law 438-86; and (C) On the lands municipally known as 245 Carlton St. in 1994, Section 12(1) 373 of former City of Toronto By-law 438-86.
- Older by-law A
Public parking in a building or structure is not permitted; [TO: 438-86; 12(2) 132]
- Older by-law B
On a lot , a building or structure that has assisted housing has a parking rate of 0.3 spaces per dwelling unit [TO: 438-86; 12(2) 207]
- Older by-law C
These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(1) 66 of former City of Toronto By-law 438-86; (B) Section 12(2) 270 (a) of former City of Toronto By-law 438-86; and (C) On the lands municipally known as 245 Carlton St. in 1994, Section 12(1) 373 of former City of Toronto By-law 438-86.
Lot facts
- Area
- 180 m²
- Frontage
- 6.5 m
- Depth
- 27.6 m
- Street
- Gerrard St E
- Corner lot
- Yes, also on Parliament St27.6 m along it
- Public lane
- None
- House footprint
- 58 m²roof up to 12.8 m
- Back yard
- 5.5 mhouse to rear lot line
- Side yards
- 0 m and 0.3 mhouse to side lot lines; 0 is a shared wall
- Buildings on the lot
- 4house, garage, sheds
- Max height
- 14 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Priority retail street: Parliament Street. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 2.0 (c1.0; r2.0) SS2 (x1911) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
- 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: honey locust (42 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 100%40 of 40 decisions
- Garden suite permits
- 1
- Laneway suite permits
- 4
- Multiplex permits
- 18
- Development applications
- 14
Within 300 m, last 10 years. 23 suite and multiplex permits: more than at 90% of Toronto houses (median 3). 40 variance decisions: more than at 75% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the existing two-and-one-half semi-detached building (houseplex), which is currently under construction (Building Permit 25 258356 BLD), by constructing a side (east) basement walkout with a flat roof canopy. Also, to maintain the existing rear second storey roof deck with stairs, and third storey roof deck. There will be two existing units and two new units for a total of four residential dwelling units on this lot (one unit occupying the basement level, two units occupying the first level, and one unit occupying the second and third levels).
183 CARLTON ST · Jul 22, 2026 · 315 m away - Minor varianceApproved
To alter the existing three-storey mixed-use building by converting the storage room on the second and third levels into seven additional hostel suites (three on the second level, and four on the third level). The existing pharmacy and cafeteria on the ground level, 19 hostel suites on the second level, and 20 hostel suites on the third level will be maintained and unaltered.
311 SHERBOURNE ST · Jun 3, 2026 · 375 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 141-2005 (as amended by By-laws 1325-2023 and 1392-2024)) for a mixed-use building encompassing Tower D and including a podium/base building on the lands between Dreamer¿s Way and Street G, in regards to the phasing requirements (the construction of Street G, and Sackville Street) and by increasing the height of the mechanical penthouse. A Site Plan Control application (File No. 25 103941 STE 13 SA) is currently under review and consideration. This building will contain 271 affordable rental housing units, and 33,161 m² of residential gross floor area, 913 m² of ground floor retail space, and 1,160 m² of ground floor community space.
325 GERRARD ST E · Oct 1, 2025 · 217 m away - Minor varianceApproved
To alter the existing three-storey semi-detached building (currently vacant and with the front and rear portion of the building, abutting Doctor O Lane, attached below grade) by converting it to a mixed-use building (service hub for the Indigenous community) with four dwelling units and community and office space on the basement, first, and second floors, by constructing front and side (west) basement additions, an enlarged ground floor terrace (at the west portion of the building), three new dormers at the rear portion of the second floor, and a rear second floor balcony at the east portion of the building. There will be a total of four residential dwelling units within this building.
209 CARLTON ST · Jul 30, 2025 · 234 m away - Minor varianceApproved
To alter the existing three-storey commercial building (containing office uses) by converting the west half of the first storey, and the second and third storeys into a hotel use with a common use area located on the ground floor. The existing east half of the building and the existing pharmacy (located on the ground floor) will be maintained. There will be a total of 39 hotel rooms within this mixed-use building.
311 SHERBOURNE ST · May 7, 2025 · 375 m away
Latest activity nearby
- Zoning review
Not Started
405 PARLIAMENT ST · Nov 23, 2026 · 48 m away - Building permit
CONSTRUCT 1 HOUR FRR WALL IN BASEMENT TO SEPARATE FIRST FLOOR UNIT FROM BASEMENT UNIT [Basement & first floor separate commercial and 2nd & 3rd Residential)
440 PARLIAMENT ST · Nov 20, 2026 · 91 m away - Building permit
Proposed fire damages repair
223 CARLTON ST · Nov 18, 2026 · 198 m away - Building permit
Proposal to construct a new laneway suite (Unit # R)
9 SPRUCE ST · Nov 12, 2026 · 83 m away - Minor variancePending
In Progress
306 GERRARD ST E · Nov 10, 2026 · 77 m away - Building permit
FS - Sprinkler Shop Drawing - Proposal for interior alteration and addition to change the vacant residential semi detached house to a supportive housing (residential and ancillary office) building
209 CARLTON ST · Nov 9, 2026 · 234 m away - Building permit
PROPOSAL TO REPLACE DAMAGED SECOND FLOOR DECK PLATFORM FRAMINGEXISTING DECK POSTS AND FOUNDATIONS TO REMAIN UNCHANGED
416 ONTARIO ST · Nov 6, 2026 · 224 m away - Building permit
Electromagnetic locks for a proposed multi-unit residential building. (2 Maglocks)
227 GERRARD ST E · Nov 4, 2026 · 270 m away - Building permit
Minor renovations involving, Installing a 12-foot-wide patio door/screen assembly in an enlarged opening on the second floor; Removing a small section of the partition wall on the ground floor; andRelocating a fire exit door within the existing wall. - Unit A
223 CARLTON ST · Oct 28, 2026 · 198 m away - Building permit
REVISION-01Propose to relocate washer/dryer from ground floor to second-floor mechanical room, convert existing ground-floor enclosure into a washroom, and add a capped plumbing rough-in for a future kitchenette sink.
29 OAK ST · Oct 28, 2026 · 250 m away
Neighbourhood: Moss Park
About the area around the lot, not the lot itself.
- Nearest station
- College Station20 min walk
- Nearest TTC stop
- Parliament St at Gerrard St East1 min walk
- Nearest cycling route
- Gerrard St EBike Lane, 1 min walk
- Nearest traffic count
- 18,435 vehicles in 14 hGerrard St E / Parliament St (South), 70 m away, Jul 9, 2024
- Serious collisions within 500 m
- 52021–2026, killed or seriously injured: 1 fatal, 5 with pedestrians, 0 with cyclists
- Parks
- Anniversary Park1 min walk
- Oak Street Parkette3 min walk
- Winchester Square Park5 min walk
Schools within 1 km
- LORD DUFFERIN JR & SR PUBLIC SCHOOL English Public 3 min walk
- SPRUCECOURT JR PUBLIC SCHOOL English Public 6 min walk
- WINCHESTER JR & SR PUBLIC SCHOOL English Public 8 min walk
- MONSIGNOR FRASER - ST MARTIN CAMPUS English Separate 9 min walk
- OUR LADY OF LOURDES CATHOLIC ELEMENTARY SCHOOL English Separate 11 min walk
- NELSON MANDELA PARK PUBLIC SCHOOL English Public 12 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Moss Park | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $65,000 | $84,500 |
| Households that own their home | 35% | 54% |
| Population (2021) | 21,490 | 16,813 |
| Homes built in 1960 or before | 17% | 29% |
| Homes needing major repairs | 8% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Moss Park | City median |
|---|---|---|
| Assault | 2226.8 | 636.3 |
| Robbery | 166.6 | 69.5 |
| Homicide | 3.4 | 5.3 |
| Shootings | 3.4 | 10.5 |
| Auto theft | 81.6 | 192.6 |
| Theft over $5,000 | 64.6 | 46.1 |
| Break and enter | 350.2 | 172.8 |
| Theft from vehicles | 275.4 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.