Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Building permit open since 2021
Needs a closer lookStill open in the City's records: 21 212765 (Complete various retro-commissioning activities, HVAC and control systems repair & upgr..., 2021, status Inspection).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)7 development applications open within 300 m
Good to know7 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 60 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
13 records on file: more than at 100% of Toronto houses (median 0).
- Development application22 242103 STE 13 OZClosed
This is an application that is to address two main objectives: 1) to bring the portion of the university's lands currently zoned under the former City of Toronto Zoning By-law 438-86 into the City-wide Zoning By-law 569-2013; and 2) to establish bicycle parking, loading space, and automobile parking rates for lands owned and operated by Toronto Metropolitan University as an overlay approach in By-law 569-2013. No development is proposed as part of this application.
Dec 23, 2022 · 296 CHURCH ST · City file - Building permit21 240987Closed
Proposed exterior wall and window restoration
Mar 3, 2022 · 302 CHURCH ST - Building permit21 212765Inspection
Complete various retro-commissioning activities, HVAC and control systems repair & upgrade to optimize the performance of the building. Work includes replacing all aged heating equipment with the new ones and high efficiency convectors, upgrading the aged pneumatic control system and equipment with DDC ones complete with optimized sequence of control, and providing the DCV system.
Oct 15, 2021 · 296 CHURCH ST - Building permit17 280174Closed
Proposed interior alterations and window replacment and parapet reconfiguration, back up steel frame installation with fire curtain - on north side of Galleria atrium, to newly constructed School of Interior Design (SID) Ryerson University. 270-288 CHURCH ST. Note: See active New Building permit 16 114860 BLD. Back up steel frame installation with fire curtain requires a separate permit.
Jan 30, 2018 · 302 CHURCH ST - Building permit17 233007Closed
Proposal to reinforce existing timber framed columns and beams to existing university building.
Sep 20, 2017 · 296 CHURCH ST - Building permit16 146821Closed
HVAC - Proposed alterations (187m2) to ground and third floor - Ryerson FCAD Fabrication Classrooms.
May 30, 2016 · 296 CHURCH ST - Building permit15 163250Closed
Construct interior alterations (254m2) upgrade of dust collector system
Jul 7, 2015 · 296 CHURCH ST - Building permit14 135473Closed
To install a backflow prevention device to the existing "Ryerson" University building.
Apr 1, 2014 · 302 CHURCH ST
Show 5 older records
- Building permit08 146809Closed
interior alterations to create new classroom space on floor 3 - Ryerson University - Interior design building.
May 30, 2008 · 296 CHURCH ST - Building permit06 192953Closed
Interior alterations to existing Ryerson Building (Interior Design School). Convenience address 302 Church St.
Jan 9, 2007 · 296 CHURCH ST - Building permit06 169869Closed
Interior alterations to portion of 2nd floor. Reconfigure WC ( add ) and classroom.
Sep 1, 2006 · 296 CHURCH ST - Building permit03 120798Closed
Re-locate rear exit doors from the north side of the building to the west side of the building. re: Interior Design Building.
Apr 3, 2003 · 296 CHURCH ST - Zoning review96 025689 LTOClosedNov 18, 1996 · 302 CHURCH ST
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 1,313 m²
- Frontage
- 36.9 m
- Depth
- 35.7 m
- Street
- Church St
- Corner lot
- No
- Public lane
- Ln N Dundas E Bond, 34.3 m along it
- House footprint
- 1,072 m²roof up to 24.1 m
- Back yard
- 0 mhouse to rear lot line
- Side yards
- 0.3 m and 5.6 mhouse to side lot lines
- Buildings on the lot
- 5house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
Around this lot
- Minor variances approved
- 93%14 of 15 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 31
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 15 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To permit a new eating establishment with karaoke rooms on the second storey (with an increased total floor area), and an eating establishment on the ground floor with washrooms and storage located in the basement, within the existing two-storey commercial building.
332 YONGE ST · Oct 14, 2026 · 311 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1334-2023(OLT)) for the 44-storey mixed-use building, by increasing the overall height of the building (from 133.2 m to 134.75 m measured to the top of the mechanical penthouse) and height of the podium (from 30 m to 30.5 m), reducing the setbacks, and reducing the first storey building frontage abutting the priority retail street (Dundas Steet East). There will be a total of 542 residential dwelling units on this lot. A Site Plan Control application (File Number 21 218559 STE 13 SA) is currently under review.
212 DUNDAS ST E · Jul 15, 2026 · 363 m away - Minor varianceApproved
To alter the existing public hospital (St. Michael's Hospital, bounded by Shuter Street, Bond Street, Queen Street East, and Victoria Street) by installing an air handling unit (AHU) on a portion of the roof (Donnelly Wing).
30 BOND ST · Jan 21, 2026 · 424 m away - Minor varianceApproved
To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.
134 JARVIS ST · Nov 12, 2025 · 481 m away - Minor varianceApproved
To alter the existing three-storey townhouse dwelling by constructing interior alterations to the existing open-to-above area between the basement and ground floor level of the dwelling by enclosing the floor (increasing the area of habitable space).
97 GRANBY ST · Oct 15, 2025 · 424 m away
Latest activity nearby
- Consent (lot split)Pending
To obtain consent to sever a portion of stratified land (air-rights at-and-above an elevation of 121 m) for the purpose of a lot addition.
50 GERRARD ST E · Nov 25, 2026 · 296 m away - Zoning review
Closed
335 YONGE ST · Nov 23, 2026 · 249 m away - Building permit
Installation of new vertical condensate drain risers to collect condensate from existing piping outlets at the balconies
145 MUTUAL ST · Nov 20, 2026 · 220 m away - Zoning review
Closed
66 GERRARD ST E · Nov 9, 2026 · 288 m away - Zoning review
Not Started
21 DUNDAS SQ · Nov 6, 2026 · 236 m away - Zoning review
Not Started
66 GERRARD ST E · Nov 4, 2026 · 288 m away - Zoning review
Closed
78 MUTUAL ST · Oct 28, 2026 · 263 m away - Zoning review
Closed
1 DUNDAS ST E · Oct 26, 2026 · 249 m away - Building permit
Proposal to replace existing rooftop HVAC units.
361 YONGE ST · Oct 13, 2026 · 292 m away - Building permit
1 wall sign + 1 projecting sign**EGGSLUT**
10 DUNDAS ST E · Oct 6, 2026 · 242 m away
Neighbourhood: Downtown Yonge East
About the area around the lot, not the lot itself.
- Nearest station
- TMU Station4 min walk
- Nearest TTC stop
- Dundas St East at Church St2 min walk
- Nearest cycling route
- Gerrard St ECycle Track, 4 min walk
- Nearest traffic count
- 9,763 vehicles in 14 hGould St / Church St, 80 m away, Oct 15, 2025
- Serious collisions within 500 m
- 142021–2026, killed or seriously injured: 1 fatal, 10 with pedestrians, 4 with cyclists
- Parks
- Toronto Metropolitan University Square2 min walk
- Arena Gardens3 min walk
- 45 Dalhousie St Park6 min walk
Schools within 1 km
- TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 1 min walk
- TMU - HEIDELBERG CENTRE SCHOOL OF GRAPHIC COMM'NS MGMT University 1 min walk
- TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF IMAGE ARTS University 2 min walk
- TMU - HEASLIP HOUSE University 2 min walk
- ST MICHAEL'S CHOIR SCHOOL - SECONDARY English Separate 3 min walk
- ST MICHAEL'S CHOIR SCHOOL - ELEMENTARY English Separate 4 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Downtown Yonge East | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $69,500 | $84,500 |
| Households that own their home | 36% | 54% |
| Population (2021) | 17,700 | 16,813 |
| Homes built in 1960 or before | 7% | 29% |
| Homes needing major repairs | 4% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Downtown Yonge East | City median |
|---|---|---|
| Assault | 2360.8 | 636.3 |
| Robbery | 143.3 | 69.5 |
| Shootings | 11.9 | 10.5 |
| Auto theft | 75.6 | 192.6 |
| Theft over $5,000 | 99.5 | 46.1 |
| Break and enter | 274.7 | 172.8 |
| Theft from vehicles | 390.1 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.